Offshore engineering construction projects are large and complex,having the characteristics of multiple execution modes andmultiple resource constraints.Their complex internal scheduling processes can be regarded as r...Offshore engineering construction projects are large and complex,having the characteristics of multiple execution modes andmultiple resource constraints.Their complex internal scheduling processes can be regarded as resourceconstrained project scheduling problems(RCPSPs).To solve RCPSP problems in offshore engineering construction more rapidly,a hybrid genetic algorithmwas established.To solve the defects of genetic algorithms,which easily fall into the local optimal solution,a local search operation was added to a genetic algorithm to defend the offspring after crossover/mutation.Then,an elitist strategy and adaptive operators were adopted to protect the generated optimal solutions,reduce the computation time and avoid premature convergence.A calibrated function method was used to cater to the roulette rules,and appropriate rules for encoding,decoding and crossover/mutation were designed.Finally,a simple network was designed and validated using the case study of a real offshore project.The performance of the genetic algorithmand a simulated annealing algorithmwas compared to validate the feasibility and effectiveness of the approach.展开更多
The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This stu...The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This study aimed to bridge this gap by examining the effects of contractor-related factors on the performance of bridge construction projects in Kenya through a case study of the Bridge projects Implemented by the Kenya National Highway Agency (KeNHA). The theory of constraints (TOC) was adopted as its theoretical framework. Descriptive research was used, and the target population was 18 bridge construction projects, which were the units of analysis from 2012 to 2022. In each of these projects, 18 respondents, namely clients, consultants, contractors, engineers, environment and social guards, project managers, stakeholders, subcontractors, technical advisors, and inspectors, were included in a target population of 144 respondents. A census was conducted and a structured questionnaire was administered from which a response rate of 68% was achieved. The information was analyzed using descriptive, correlation, and multiple linear regression analysis. The contractor-related factors considered in the study were staff and management factors. The findings indicated that staff and management factors had a positive and significant outcome on performance of bridge construction projects. The study recommends continuous training and a safe learning environment for staff to improve their skills and performance in future projects. The study also recommends that a special category for bridge contractors be created in Kenya’s National Construction Authority rankings to ensure that only qualified contractors implement the Bridge projects.展开更多
It is alarming for the fact that Wildfires number, severity and consequently impact have significantly increased during the last years, an aftermath of the Climate Change. One of the most affected areas worldwide is M...It is alarming for the fact that Wildfires number, severity and consequently impact have significantly increased during the last years, an aftermath of the Climate Change. One of the most affected areas worldwide is Mediterranean, due to the unique combination of its type of vegetation and demanding climatic conditions. This research is focused on the Region of Epirus in Greece, an area with significant natural vegetation and a range of geomorphological aspects. In order to estimate the Wildfire Risk Hazard, several factors have been used: geomorphological (slope, aspect, elevation, TWI, Hydrographic network), social (Settlements and landfils, roads, overhead lines and substations), environmental (land cover) and climatic (Fire Weather Index). Through a multi-criteria decision analysis (MCDA) and an analytic hierarchy process (AHP) in a GIS environment, the Wildfire Risk Hazard has been estimated not only for current conditions but also for future projections for the near future (2031-2060) and the far future (2071-2100). The selected case study includes the potential impact of the Wildfires to the installed (or targeted to be installed) RES projects in the studied region.展开更多
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s...The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes.展开更多
In an era dominated by artificial intelligence (AI), establishing customer confidence is crucial for the integration and acceptance of AI technologies. This interdisciplinary study examines factors influencing custome...In an era dominated by artificial intelligence (AI), establishing customer confidence is crucial for the integration and acceptance of AI technologies. This interdisciplinary study examines factors influencing customer trust in AI systems through a mixed-methods approach, blending quantitative analysis with qualitative insights to create a comprehensive conceptual framework. Quantitatively, the study analyzes responses from 1248 participants using structural equation modeling (SEM), exploring interactions between technological factors like perceived usefulness and transparency, psychological factors including perceived risk and domain expertise, and organizational factors such as leadership support and ethical accountability. The results confirm the model, showing significant impacts of these factors on consumer trust and AI adoption attitudes. Qualitatively, the study includes 35 semi-structured interviews and five case studies, providing deeper insight into the dynamics shaping trust. Key themes identified include the necessity of explainability, domain competence, corporate culture, and stakeholder engagement in fostering trust. The qualitative findings complement the quantitative data, highlighting the complex interplay between technology capabilities, human perceptions, and organizational practices in establishing trust in AI. By integrating these findings, the study proposes a novel conceptual model that elucidates how various elements collectively influence consumer trust in AI. This model not only advances theoretical understanding but also offers practical implications for businesses and policymakers. The research contributes to the discourse on trust creation and decision-making in technology, emphasizing the need for interdisciplinary efforts to address societal challenges associated with technological advancements. It lays the groundwork for future research, including longitudinal, cross-cultural, and industry-specific studies, to further explore consumer trust in AI.展开更多
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp...Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely.展开更多
In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select...In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select the effective scheduling rules( SRs) which are constructed using the project status and attributes of the activities. SRs are represented by the chromosomes of GEP, and an improved parallel schedule generation scheme( IPSGS) is used to transform the SRs into explicit schedules. The framework of GEP-SR for RCPSP is designed,and the effectiveness of the GEP-SR approach is demonstrated by comparing with other methods on the same instances.展开更多
Estuarine projects can change local topography and influence water transport and saltwater intrusion.The Changjiang(Yangtze)River estuary is a multichannel estuary,and four major reclamation projects have been impleme...Estuarine projects can change local topography and influence water transport and saltwater intrusion.The Changjiang(Yangtze)River estuary is a multichannel estuary,and four major reclamation projects have been implemented in the Changjiang River estuary in recent years:the Xincun Shoal reclamation project(RP-XCS),the Qingcao Shoal reclamation project(RP-QCS),the Eastern Hengsha Shoal reclamation project(RP-EHS),and the Nanhui Shoal reclamation project(RP-NHS).The effects of the four reclamation projects and each project on the saltwater intrusion and water resources in the Changjiang River estuary were simulated in a 3D numerical model.Results show that for a multichannel estuary,local reclamation projects change the local topography and water diversion ratio(WDR)between channels and influence water and salt transport and freshwater utilization in the estuary.During spring tide,under the cumulative effect of the four reclamation projects,the salinity decreases by approximately 0.5in the upper reaches of the North Branch and increases by 0.5-1.0 in the middle and lower reaches of the North Branch.In the North Channel,the salinity decreases by approximately 0.5.In the North Passage,the salinity increases by 0.5-1.0.In the South Passage,the salinity increases by approximately 0.5 in the upper reaches and decreases by 0.2-0.5 on the north side of the middle and lower reaches.During neap tide,the cumulative effects of the four reclamation projects and the individual projects are similar to those during spring tide,but there are some differences.The effects of an individual reclamation project on WDR and saltwater intrusion during spring and neap tides are simulated and analyzed in detail.The cumulative effect of the four reclamation projects favors freshwater usage in the Changjiang River estuary.展开更多
To solve the resource-constrained project scheduling problem (RCPSP), a hybrid ant colony optimization (HACO) approach is presented. To improve the quality of the schedules, the HACO is incorporated with an extend...To solve the resource-constrained project scheduling problem (RCPSP), a hybrid ant colony optimization (HACO) approach is presented. To improve the quality of the schedules, the HACO is incorporated with an extended double justification in which the activity splitting is applied to predict whether the schedule could be improved. The HACO is tested on the set of large benchmark problems from the project scheduling problem library (PSPLIB). The computational result shows that the proposed algo- rithm can improve the quality of the schedules efficiently.展开更多
A memetic algorithm (MA) for a multi-mode resourceconstrained project scheduling problem (MRCPSP) is proposed. We use a new fitness function and two very effective local search procedures in the proposed MA. The f...A memetic algorithm (MA) for a multi-mode resourceconstrained project scheduling problem (MRCPSP) is proposed. We use a new fitness function and two very effective local search procedures in the proposed MA. The fitness function makes use of a mechanism called "strategic oscillation" to make the search process have a higher probability to visit solutions around a "feasible boundary". One of the local search procedures aims at improving the lower bound of project makespan to be less than a known upper bound, and another aims at improving a solution of an MRCPSP instance accepting infeasible solutions based on the new fitness function in the search process. A detailed computational experiment is set up using instances from the problem instance library PSPLIB. Computational results show that the proposed MA is very competitive with the state-of-the-art algorithms. The MA obtains improved solutions for one instance of set J30.展开更多
An improved differential evolution(IDE)algorithm that adopts a novel mutation strategy to speed up the convergence rate is introduced to solve the resource-constrained project scheduling problem(RCPSP)with the obj...An improved differential evolution(IDE)algorithm that adopts a novel mutation strategy to speed up the convergence rate is introduced to solve the resource-constrained project scheduling problem(RCPSP)with the objective of minimizing project duration Activities priorities for scheduling are represented by individual vectors and a senal scheme is utilized to transform the individual-represented priorities to a feasible schedule according to the precedence and resource constraints so as to be evaluated.To investigate the performance of the IDE-based approach for the RCPSP,it is compared against the meta-heuristic methods of hybrid genetic algorithm(HGA),particle swarm optimization(PSO) and several well selected heuristics.The results show that the proposed scheduling method is better than general heuristic rules and is able to obtain the same optimal result as the HGA and PSO approaches but more efficient than the two algorithms.展开更多
With the rapid development of Open-Source(OS),more and more software projects are maintained and developed in the form of OS.These Open-Source projects depend on and influence each other,gradually forming a huge OS pr...With the rapid development of Open-Source(OS),more and more software projects are maintained and developed in the form of OS.These Open-Source projects depend on and influence each other,gradually forming a huge OS project network,namely an Open-Source Software ECOsystem(OSSECO).Unfortunately,not all OS projects in the open-source ecosystem can be healthy and stable in the long term,and more projects will go from active to inactive and gradually die.In a tightly connected ecosystem,the death of one project can potentially cause the collapse of the entire ecosystem network.How can we effectively prevent such situations from happening?In this paper,we first identify the basic project characteristics that affect the survival of OS projects at both project and ecosystem levels through the proportional hazards model.Then,we utilize graph convolutional networks based on the ecosystem network to extract the ecosystem environment characteristics of OS projects.Finally,we fuse basic project characteristics and environmental project characteristics and construct a Hybrid Structured Prediction Model(HSPM)to predict the OS project survival state.The experimental results show that HSPM significantly improved compared to the traditional prediction model.Our work can substantially assist OS project managers in maintaining their projects’health.It can also provide an essential reference for developers when choosing the right open-source project for their production activities.展开更多
Glutamatergic projection neurons generate sophisticated excitatory circuits to integrate and transmit information among different cortical areas,and between the neocortex and other regions of the brain and spinal cord...Glutamatergic projection neurons generate sophisticated excitatory circuits to integrate and transmit information among different cortical areas,and between the neocortex and other regions of the brain and spinal cord.Appropriate development of cortical projection neurons is regulated by certain essential events such as neural fate determination,proliferation,specification,differentiation,migration,survival,axonogenesis,and synaptogenesis.These processes are precisely regulated in a tempo-spatial manner by intrinsic factors,extrinsic signals,and neural activities.The generation of correct subtypes and precise connections of projection neurons is imperative not only to support the basic cortical functions(such as sensory information integration,motor coordination,and cognition)but also to prevent the onset and progression of neurodevelopmental disorders(such as intellectual disability,autism spectrum disorders,anxiety,and depression).This review mainly focuses on the recent progress of transcriptional regulations on the development and diversity of neocortical projection neurons and the clinical relevance of the failure of transcriptional modulations.展开更多
This paper aims to explore a simpler and more user-friendly way of generating software based on model-driven development.Previous studies have attempted to generate code from domain models,hoping to reduce coding time...This paper aims to explore a simpler and more user-friendly way of generating software based on model-driven development.Previous studies have attempted to generate code from domain models,hoping to reduce coding time by increasing modeling time.However,as code tools become more advanced,it is challenging to improve efficiency because models are abstract while implementations are concrete.This paper proposes a novel approach that integrates ChatGPT as a plug-in into the whole R&D process and combines it with our code generation tool to enhance R&D efficiency.We have developed some demos to demonstrate the effectiveness of our approach.According to our evaluation,our approach can save more than 90%of the work in implementing the code generation tool,leaving only about 10%of the work for code review,code improvement,and unit testing.展开更多
Inspired by Roger Nelson’s Global Consciousness Project (GCP), the Global Earth Healing Project (GEHP) uses a network of several hundred physical noise generators to amplify the combined intentions of their users in ...Inspired by Roger Nelson’s Global Consciousness Project (GCP), the Global Earth Healing Project (GEHP) uses a network of several hundred physical noise generators to amplify the combined intentions of their users in order to infuse positive affirmations into the global consciousness. As mentioned in the original study design, it was intended to use the GCP as a reference for the effectiveness of its activities. The data of the GEHP consisting of 21 events from 2013 to 2020 is analyzed and statistically compared to the data of the GCP. An astonishing synchronicity was observed, which suggests an interaction between the brain states of the observers and the physical noise generators of the GCP.展开更多
With the development of China's economy,the implementation scale and scope of hydraulic engineering projects are increasing,and the application of anti-seepage technology has an important influence on the construc...With the development of China's economy,the implementation scale and scope of hydraulic engineering projects are increasing,and the application of anti-seepage technology has an important influence on the construction quality of hydraulic engineering.In this paper,the significance and problems of the application of anti-seepage technology in the construction of hydraulic engineering projects were mainly analyzed,and specific application strategies were proposed.展开更多
Construction delay is a widespread issue in the construction industry of developing countries, and Nepal is no exception. These delays extend project durations and lead to cost overruns and disputes among stakeholders...Construction delay is a widespread issue in the construction industry of developing countries, and Nepal is no exception. These delays extend project durations and lead to cost overruns and disputes among stakeholders. To address this problem, this study aimed to identify and analyze the significant factors that contribute to construction project delays in Nepal. To gather data, a well-structured questionnaire was developed and administered to a sample of 100 participants, including contractors, consultants, and civil engineers. Various statistical tests were conducted to ensure the data’s integrity and consistency, such as reliability assessments and factor analyses. The findings of the study highlighted multiple factors contributing to delays in construction projects such as inadequate design, poor communication, and coordination among stakeholders, insufficient experience and planning by contractors, delays in material delivery and testing, labor-related problems including shortages and low qualifications, and external factors like regulatory changes and unforeseen circumstances. By identifying these major causes of construction project delays, this study presented insightful information that can contribute to the analysis and evaluation of project performance.展开更多
We present an application of short-pulse laser-generated hard x rays for the diagnosis of indirectly driven double shell targets. Coneinserted double shell targets were imploded through an indirect drive approach on t...We present an application of short-pulse laser-generated hard x rays for the diagnosis of indirectly driven double shell targets. Coneinserted double shell targets were imploded through an indirect drive approach on the upgraded SG-II laser facility. Then, based on thepoint-projection hard x-ray radiography technique, time-resolved radiography of the double shell targets, including that of their near-peakcompression, were obtained. The backlighter source was created by the interactions of a high-intensity short pulsed laser with a metalmicrowire target. Images of the target near peak compression were obtained with an Au microwire. In addition, radiation hydrodynamicsimulations were performed, and the target evolution obtained agrees well with the experimental results. Using the radiographic images, arealdensities of the targets were evaluated.展开更多
This paper introduces a hybrid evolutionary algorithm for the resource-constrained project scheduling problem (RCPSP). Given an RCPSP instance, the algorithm identifies the problem structure and selects a suitable dec...This paper introduces a hybrid evolutionary algorithm for the resource-constrained project scheduling problem (RCPSP). Given an RCPSP instance, the algorithm identifies the problem structure and selects a suitable decoding scheme. Then a multi-pass biased sampling method followed up by a multi-local search is used to generate a diverse and good quality initial population. The population then evolves through modified order-based recombination and mutation operators to perform exploration for promising solutions within the entire region. Mutation is performed only if the current population has converged or the produced offspring by recombination operator is too similar to one of his parents. Finally the algorithm performs an intensified local search on the best solution found in the evolutionary stage. Computational experiments using standard instances indicate that the proposed algorithm works well in both computational time and solution quality.展开更多
基金funded by the Ministry of Industry and Information Technology of the People’s Republic of China(Nos.[2018]473,[2019]331).
文摘Offshore engineering construction projects are large and complex,having the characteristics of multiple execution modes andmultiple resource constraints.Their complex internal scheduling processes can be regarded as resourceconstrained project scheduling problems(RCPSPs).To solve RCPSP problems in offshore engineering construction more rapidly,a hybrid genetic algorithmwas established.To solve the defects of genetic algorithms,which easily fall into the local optimal solution,a local search operation was added to a genetic algorithm to defend the offspring after crossover/mutation.Then,an elitist strategy and adaptive operators were adopted to protect the generated optimal solutions,reduce the computation time and avoid premature convergence.A calibrated function method was used to cater to the roulette rules,and appropriate rules for encoding,decoding and crossover/mutation were designed.Finally,a simple network was designed and validated using the case study of a real offshore project.The performance of the genetic algorithmand a simulated annealing algorithmwas compared to validate the feasibility and effectiveness of the approach.
文摘The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This study aimed to bridge this gap by examining the effects of contractor-related factors on the performance of bridge construction projects in Kenya through a case study of the Bridge projects Implemented by the Kenya National Highway Agency (KeNHA). The theory of constraints (TOC) was adopted as its theoretical framework. Descriptive research was used, and the target population was 18 bridge construction projects, which were the units of analysis from 2012 to 2022. In each of these projects, 18 respondents, namely clients, consultants, contractors, engineers, environment and social guards, project managers, stakeholders, subcontractors, technical advisors, and inspectors, were included in a target population of 144 respondents. A census was conducted and a structured questionnaire was administered from which a response rate of 68% was achieved. The information was analyzed using descriptive, correlation, and multiple linear regression analysis. The contractor-related factors considered in the study were staff and management factors. The findings indicated that staff and management factors had a positive and significant outcome on performance of bridge construction projects. The study recommends continuous training and a safe learning environment for staff to improve their skills and performance in future projects. The study also recommends that a special category for bridge contractors be created in Kenya’s National Construction Authority rankings to ensure that only qualified contractors implement the Bridge projects.
文摘It is alarming for the fact that Wildfires number, severity and consequently impact have significantly increased during the last years, an aftermath of the Climate Change. One of the most affected areas worldwide is Mediterranean, due to the unique combination of its type of vegetation and demanding climatic conditions. This research is focused on the Region of Epirus in Greece, an area with significant natural vegetation and a range of geomorphological aspects. In order to estimate the Wildfire Risk Hazard, several factors have been used: geomorphological (slope, aspect, elevation, TWI, Hydrographic network), social (Settlements and landfils, roads, overhead lines and substations), environmental (land cover) and climatic (Fire Weather Index). Through a multi-criteria decision analysis (MCDA) and an analytic hierarchy process (AHP) in a GIS environment, the Wildfire Risk Hazard has been estimated not only for current conditions but also for future projections for the near future (2031-2060) and the far future (2071-2100). The selected case study includes the potential impact of the Wildfires to the installed (or targeted to be installed) RES projects in the studied region.
文摘The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes.
文摘In an era dominated by artificial intelligence (AI), establishing customer confidence is crucial for the integration and acceptance of AI technologies. This interdisciplinary study examines factors influencing customer trust in AI systems through a mixed-methods approach, blending quantitative analysis with qualitative insights to create a comprehensive conceptual framework. Quantitatively, the study analyzes responses from 1248 participants using structural equation modeling (SEM), exploring interactions between technological factors like perceived usefulness and transparency, psychological factors including perceived risk and domain expertise, and organizational factors such as leadership support and ethical accountability. The results confirm the model, showing significant impacts of these factors on consumer trust and AI adoption attitudes. Qualitatively, the study includes 35 semi-structured interviews and five case studies, providing deeper insight into the dynamics shaping trust. Key themes identified include the necessity of explainability, domain competence, corporate culture, and stakeholder engagement in fostering trust. The qualitative findings complement the quantitative data, highlighting the complex interplay between technology capabilities, human perceptions, and organizational practices in establishing trust in AI. By integrating these findings, the study proposes a novel conceptual model that elucidates how various elements collectively influence consumer trust in AI. This model not only advances theoretical understanding but also offers practical implications for businesses and policymakers. The research contributes to the discourse on trust creation and decision-making in technology, emphasizing the need for interdisciplinary efforts to address societal challenges associated with technological advancements. It lays the groundwork for future research, including longitudinal, cross-cultural, and industry-specific studies, to further explore consumer trust in AI.
文摘Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely.
基金The Spring Plan of Ministry of Education,China(No.Z2012017)
文摘In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select the effective scheduling rules( SRs) which are constructed using the project status and attributes of the activities. SRs are represented by the chromosomes of GEP, and an improved parallel schedule generation scheme( IPSGS) is used to transform the SRs into explicit schedules. The framework of GEP-SR for RCPSP is designed,and the effectiveness of the GEP-SR approach is demonstrated by comparing with other methods on the same instances.
基金Supported by the Science and Technology Commission of Shanghai Municipality(No.21JC1402500)。
文摘Estuarine projects can change local topography and influence water transport and saltwater intrusion.The Changjiang(Yangtze)River estuary is a multichannel estuary,and four major reclamation projects have been implemented in the Changjiang River estuary in recent years:the Xincun Shoal reclamation project(RP-XCS),the Qingcao Shoal reclamation project(RP-QCS),the Eastern Hengsha Shoal reclamation project(RP-EHS),and the Nanhui Shoal reclamation project(RP-NHS).The effects of the four reclamation projects and each project on the saltwater intrusion and water resources in the Changjiang River estuary were simulated in a 3D numerical model.Results show that for a multichannel estuary,local reclamation projects change the local topography and water diversion ratio(WDR)between channels and influence water and salt transport and freshwater utilization in the estuary.During spring tide,under the cumulative effect of the four reclamation projects,the salinity decreases by approximately 0.5in the upper reaches of the North Branch and increases by 0.5-1.0 in the middle and lower reaches of the North Branch.In the North Channel,the salinity decreases by approximately 0.5.In the North Passage,the salinity increases by 0.5-1.0.In the South Passage,the salinity increases by approximately 0.5 in the upper reaches and decreases by 0.2-0.5 on the north side of the middle and lower reaches.During neap tide,the cumulative effects of the four reclamation projects and the individual projects are similar to those during spring tide,but there are some differences.The effects of an individual reclamation project on WDR and saltwater intrusion during spring and neap tides are simulated and analyzed in detail.The cumulative effect of the four reclamation projects favors freshwater usage in the Changjiang River estuary.
基金supported by Liaoning BaiQianWan Talents Program(20071866-25)
文摘To solve the resource-constrained project scheduling problem (RCPSP), a hybrid ant colony optimization (HACO) approach is presented. To improve the quality of the schedules, the HACO is incorporated with an extended double justification in which the activity splitting is applied to predict whether the schedule could be improved. The HACO is tested on the set of large benchmark problems from the project scheduling problem library (PSPLIB). The computational result shows that the proposed algo- rithm can improve the quality of the schedules efficiently.
基金supported by the National Natural Science Foundation of China(71171038)
文摘A memetic algorithm (MA) for a multi-mode resourceconstrained project scheduling problem (MRCPSP) is proposed. We use a new fitness function and two very effective local search procedures in the proposed MA. The fitness function makes use of a mechanism called "strategic oscillation" to make the search process have a higher probability to visit solutions around a "feasible boundary". One of the local search procedures aims at improving the lower bound of project makespan to be less than a known upper bound, and another aims at improving a solution of an MRCPSP instance accepting infeasible solutions based on the new fitness function in the search process. A detailed computational experiment is set up using instances from the problem instance library PSPLIB. Computational results show that the proposed MA is very competitive with the state-of-the-art algorithms. The MA obtains improved solutions for one instance of set J30.
基金supported by the National Natural Science Foundation of China(6083500460775047+4 种基金60974048)the National High Technology Research and Development Program of China(863 Program)(2007AA0422442008AA04Z214)the Natural Science Foundation of Hunan Province(09JJ9012)Scientific Research Fund of Hunan Provincial Education Department(08C337)
文摘An improved differential evolution(IDE)algorithm that adopts a novel mutation strategy to speed up the convergence rate is introduced to solve the resource-constrained project scheduling problem(RCPSP)with the objective of minimizing project duration Activities priorities for scheduling are represented by individual vectors and a senal scheme is utilized to transform the individual-represented priorities to a feasible schedule according to the precedence and resource constraints so as to be evaluated.To investigate the performance of the IDE-based approach for the RCPSP,it is compared against the meta-heuristic methods of hybrid genetic algorithm(HGA),particle swarm optimization(PSO) and several well selected heuristics.The results show that the proposed scheduling method is better than general heuristic rules and is able to obtain the same optimal result as the HGA and PSO approaches but more efficient than the two algorithms.
基金This work was supported by the National Social Science Foundation(NSSF)Research on intelligent recommendation of multi-modal resources for children’s graded reading in smart library(22BTQ033)the Science and Technology Research and Development Program Project of China railway group limited(Project No.2021-Special-08).
文摘With the rapid development of Open-Source(OS),more and more software projects are maintained and developed in the form of OS.These Open-Source projects depend on and influence each other,gradually forming a huge OS project network,namely an Open-Source Software ECOsystem(OSSECO).Unfortunately,not all OS projects in the open-source ecosystem can be healthy and stable in the long term,and more projects will go from active to inactive and gradually die.In a tightly connected ecosystem,the death of one project can potentially cause the collapse of the entire ecosystem network.How can we effectively prevent such situations from happening?In this paper,we first identify the basic project characteristics that affect the survival of OS projects at both project and ecosystem levels through the proportional hazards model.Then,we utilize graph convolutional networks based on the ecosystem network to extract the ecosystem environment characteristics of OS projects.Finally,we fuse basic project characteristics and environmental project characteristics and construct a Hybrid Structured Prediction Model(HSPM)to predict the OS project survival state.The experimental results show that HSPM significantly improved compared to the traditional prediction model.Our work can substantially assist OS project managers in maintaining their projects’health.It can also provide an essential reference for developers when choosing the right open-source project for their production activities.
基金supported by Guangdong Provincial Basic and Applied Basic Research Fund,No.2021A1515011299(to KT)。
文摘Glutamatergic projection neurons generate sophisticated excitatory circuits to integrate and transmit information among different cortical areas,and between the neocortex and other regions of the brain and spinal cord.Appropriate development of cortical projection neurons is regulated by certain essential events such as neural fate determination,proliferation,specification,differentiation,migration,survival,axonogenesis,and synaptogenesis.These processes are precisely regulated in a tempo-spatial manner by intrinsic factors,extrinsic signals,and neural activities.The generation of correct subtypes and precise connections of projection neurons is imperative not only to support the basic cortical functions(such as sensory information integration,motor coordination,and cognition)but also to prevent the onset and progression of neurodevelopmental disorders(such as intellectual disability,autism spectrum disorders,anxiety,and depression).This review mainly focuses on the recent progress of transcriptional regulations on the development and diversity of neocortical projection neurons and the clinical relevance of the failure of transcriptional modulations.
基金fully supported by the Natural Science Foundation of Hubei Province in China(Grant No.2021CFB482)Basic Research Science and Technology Project of Xiangyang(High-tech Domain 2022ABH007013)Hubei Superior and Distinctive Discipline Group of“New Energy Vehicle and Smart Transportation”。
文摘This paper aims to explore a simpler and more user-friendly way of generating software based on model-driven development.Previous studies have attempted to generate code from domain models,hoping to reduce coding time by increasing modeling time.However,as code tools become more advanced,it is challenging to improve efficiency because models are abstract while implementations are concrete.This paper proposes a novel approach that integrates ChatGPT as a plug-in into the whole R&D process and combines it with our code generation tool to enhance R&D efficiency.We have developed some demos to demonstrate the effectiveness of our approach.According to our evaluation,our approach can save more than 90%of the work in implementing the code generation tool,leaving only about 10%of the work for code review,code improvement,and unit testing.
文摘Inspired by Roger Nelson’s Global Consciousness Project (GCP), the Global Earth Healing Project (GEHP) uses a network of several hundred physical noise generators to amplify the combined intentions of their users in order to infuse positive affirmations into the global consciousness. As mentioned in the original study design, it was intended to use the GCP as a reference for the effectiveness of its activities. The data of the GEHP consisting of 21 events from 2013 to 2020 is analyzed and statistically compared to the data of the GCP. An astonishing synchronicity was observed, which suggests an interaction between the brain states of the observers and the physical noise generators of the GCP.
文摘With the development of China's economy,the implementation scale and scope of hydraulic engineering projects are increasing,and the application of anti-seepage technology has an important influence on the construction quality of hydraulic engineering.In this paper,the significance and problems of the application of anti-seepage technology in the construction of hydraulic engineering projects were mainly analyzed,and specific application strategies were proposed.
文摘Construction delay is a widespread issue in the construction industry of developing countries, and Nepal is no exception. These delays extend project durations and lead to cost overruns and disputes among stakeholders. To address this problem, this study aimed to identify and analyze the significant factors that contribute to construction project delays in Nepal. To gather data, a well-structured questionnaire was developed and administered to a sample of 100 participants, including contractors, consultants, and civil engineers. Various statistical tests were conducted to ensure the data’s integrity and consistency, such as reliability assessments and factor analyses. The findings of the study highlighted multiple factors contributing to delays in construction projects such as inadequate design, poor communication, and coordination among stakeholders, insufficient experience and planning by contractors, delays in material delivery and testing, labor-related problems including shortages and low qualifications, and external factors like regulatory changes and unforeseen circumstances. By identifying these major causes of construction project delays, this study presented insightful information that can contribute to the analysis and evaluation of project performance.
基金supported by the National Key R&D Program of China(Grant Nos.2022YFA1603300 and 2022YFA1603200)the Science Challenge Project(Grant No.TZ2018005)in China+1 种基金the National Natural Science Foundation of China(Grant Nos.11805188 and 12175209)the Laser Fusion Research Center Funds for Young Talents(Grant No.RCFPD6-2022-1).
文摘We present an application of short-pulse laser-generated hard x rays for the diagnosis of indirectly driven double shell targets. Coneinserted double shell targets were imploded through an indirect drive approach on the upgraded SG-II laser facility. Then, based on thepoint-projection hard x-ray radiography technique, time-resolved radiography of the double shell targets, including that of their near-peakcompression, were obtained. The backlighter source was created by the interactions of a high-intensity short pulsed laser with a metalmicrowire target. Images of the target near peak compression were obtained with an Au microwire. In addition, radiation hydrodynamicsimulations were performed, and the target evolution obtained agrees well with the experimental results. Using the radiographic images, arealdensities of the targets were evaluated.
文摘This paper introduces a hybrid evolutionary algorithm for the resource-constrained project scheduling problem (RCPSP). Given an RCPSP instance, the algorithm identifies the problem structure and selects a suitable decoding scheme. Then a multi-pass biased sampling method followed up by a multi-local search is used to generate a diverse and good quality initial population. The population then evolves through modified order-based recombination and mutation operators to perform exploration for promising solutions within the entire region. Mutation is performed only if the current population has converged or the produced offspring by recombination operator is too similar to one of his parents. Finally the algorithm performs an intensified local search on the best solution found in the evolutionary stage. Computational experiments using standard instances indicate that the proposed algorithm works well in both computational time and solution quality.