期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Deformation failure mechanism and application of the backfill along the goaf-side retained roadway 被引量:7
1
作者 Xue Deping Wang Jianpeng +2 位作者 Tu Hongsheng Wang Fangtian Zhao Jie 《International Journal of Mining Science and Technology》 SCIE EI 2013年第3期329-335,共7页
In order to determine the rational width of backfill in the goaf-side retained roadway, the deformation failure mechanism of surrounding rock in retained roadway is studied in the use of theoretical analysis, numerica... In order to determine the rational width of backfill in the goaf-side retained roadway, the deformation failure mechanism of surrounding rock in retained roadway is studied in the use of theoretical analysis, numerical simulation, etc., when the width of backfill is different. The results show that: with the increase of backfill width, the roof deformation above the backfill decreases; the outside of backfill obviously suffers from greater stress compared to the inner side of backfill; the damage firstly appears in the intersection of top backfill and roof; the plastic failure area is mainly distributed in the roof and floor of inside the roadway; 2 m wide backfill in the goaf-side retained roadway can meet the requirements of roadway deformation. Based on the original combination support of "anchor-mesh-belt-lock" in the haulage-track roadway, the study also considers the reinforced support of "anchor-mesh-belt" above the backfill, and 50 m ahead of working face, and 200 m behind the working face. This kind of support achieves a good result. The roadway deformation of field measurement shows that it can satisfy the need of the next working face. 展开更多
关键词 Goaf-side retained roadway roadway-side backfill Reinforced support Numerical simulation Formwork support
下载PDF
Stability analysis and control technology of gob‑side entry retaining with double roadways by flling with high‑water material in gently inclined coal seam
2
作者 Shengrong Xie En Wang +3 位作者 Dongdong Chen Hui Li Zaisheng Jiang Hongzeng Yang 《International Journal of Coal Science & Technology》 EI CAS CSCD 2022年第4期147-164,共18页
To ameliorate the defects of insufcient support resistance of traditional roadside flling bodies for gob-side entry retaining(GER),overcome the inability to adapt to the deformation of surrounding rock,and isolate the... To ameliorate the defects of insufcient support resistance of traditional roadside flling bodies for gob-side entry retaining(GER),overcome the inability to adapt to the deformation of surrounding rock,and isolate the goaf efectively,a new type of high-water material as a roadside flling body for GER technology with double roadways was proposed.The instability analysis and control technology of GER with double roadways by flling high-water material into a gently inclined coal seam were studied.The basic mechanical properties of the new high-water material were investigated through laboratory experiments,and their main advantages were identifed.The reasonable width of the roadside flling wall of a high-water material was obtained by combining ground pressure observation and theoretical calculations.The distribution characteristics of the stress and plastic zone of surrounding rock of GER after being stabilized by the disturbance of the working face were studied using numerical simulations,and the failure range of GER by flling with high-water material was revealed.Based on this,a coupling control technology of anchor cables and bolts+single props+metal mesh+anchor bolts is proposed.Through the coupling methods of arranging borehole peeping and observing the convergences of surrounding rock,the results demonstrate that GER with double roadways by flling with a 1.8-m-wide high-water material has a good control efect.The above research will play an active role in promoting the application of high-water materials in GER roadside flling. 展开更多
关键词 High-water material Gob-side entry retaining with double roadways Stability analysis Gently inclined coal seam Control technology
下载PDF
Gas drainage from different mine of drainage systems for deep coal areas: optimal placement seams with high gas emissions 被引量:10
3
作者 Ping Lu Ping Li +3 位作者 Jian Chen Chuijin Zhang Junhua Xue Tao Yu 《International Journal of Coal Science & Technology》 EI 2015年第1期84-90,共7页
The techniques of stress relief mining in low-permeability coal seams and pillarless gob side retained roadway entry using Y-type ventilation and gas drainage systems were developed to control gas outbursts and applie... The techniques of stress relief mining in low-permeability coal seams and pillarless gob side retained roadway entry using Y-type ventilation and gas drainage systems were developed to control gas outbursts and applied successfully. However, as the mining depth increasing, parts of the gas drainage system are not suitable for mines with high gas emissions. Because larger mining depths cause higher ground stresses, it becomes extremely difficult to maintain long gob side roadways. The greater deformation suffered by the roadway is not favorable lor borehole drilling for continuous gas drainage. To solve these problems, Y-type ventilation and gas drainage systems installed from a roof roadway were designed for drainage optimization. This system was designed based on a gas-enrichment zone analysis developed from mining the 11-2 coal seam in the Zhuji Mine at Huainan, Anhui Province, China. The method of Y-type gas extraction from different mine areas was applied to the panel 1112(1) in the Zhuji Mine. The absolute gas emission rate was up to 116.3 m^3/min with an average flow of 69.1 m^3/min at an average drainage concentration of nearly 85 %. After the Y-type method was adopted, the concentration of gas in the return air was 0.15 %-0.64 %, averaging 0.39 % with a ventilation rate of 2100-2750 m^3/min. The gas management system proved to be efficient, and the effective gas control allowed safe production to continue . 展开更多
关键词 Gas drainage Different gas sources Y-type ventilation Gob side retained roadway Gas emission Gas-enrichment zone
下载PDF
Technique of coal mining and gas extraction without coal pillar in multi-seam with low permeability 被引量:5
4
作者 YUAN Liang 《Journal of Coal Science & Engineering(China)》 2009年第2期120-128,共9页
Aimed at the low mining efficiency in deep multi-seams because of high crustalstress,high gas content,low permeability,the compound 'three soft' roof and the trouble-somesafety situation encountered in deep le... Aimed at the low mining efficiency in deep multi-seams because of high crustalstress,high gas content,low permeability,the compound 'three soft' roof and the trouble-somesafety situation encountered in deep level coal exploitation,proposed a new idea ofgob-side retaining without a coal-pillar and Y-style ventilation in the first-mined key pressure-relieved coal seam and a new method of coal mining and gas extraction.The followingwere discovered:the dynamic evolution law of the crannies in the roof is influenced bymining,the formative rule of 'the vertical cranny-abundant area' along the gob-side,thedistribution of air pressure field in the gob,and the flowing rule of pressure-relieved gas ina Y-style ventilation system.The study also established a theoretic basis for a new miningmethod of coal mining and gas extraction which is used to extract the pressure-relievedgas by roadway retaining boreholes instead of roadway boreholes.Studied and resolvedmany difficult key problems,such as,fast roadway retaining at the gob-side without a coalpillar,Y-style ventilation and extraction of pressure-relieved gas by roadway retainingboreholes,and so on.The study innovated and integrated a whole set of technical systemsfor coal and pressure relief gas extraction.The method of the pressure-relieved gasextraction by roadway retaining had been successfully applied in 6 typical working faces inthe Huainan and Huaibei mining areas.The research can provide a scientific and reliabletechnical support and a demonstration for coal mining and gas extraction in gaseous deepmulti-seams with low permeability. 展开更多
关键词 coal seam with low permeability without coal-pillar gob-side roadway retaining roadway retaining and borehole drilling coal mining and gas extraction
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部