The simplified mechanical model and finite element model are established on the basis of the measured results and analysis of the grouting pile deformation monitoring,surface horizontal displacement and vertical displ...The simplified mechanical model and finite element model are established on the basis of the measured results and analysis of the grouting pile deformation monitoring,surface horizontal displacement and vertical displacement monitoring,deep horizontal displacement(inclinometer)monitoring,soil pressure monitoring and seepage pressure monitoring in the lower reaches of Wuan River regulation project in Shishi,Fujian Province.The mechanical behavior and deformation performance of mould-bag pile retaining wall formed after controlled cement grouting in the silty stratum of the test section are analyzed and compared.The results show that the use of controlled cement grouting mould-bag pile technology is to strengthen the soft stratum for sealing water and reinforcement,so that it can rock into a retaining wall,which can both retain soil and seal water with excellent effect.The control of cement grouting technology not only makes the soft soil rock in the range of retaining wall of mould-bag pile,but also makes a wide range of soil around the mould-bag pile squeeze and embed to compaction;and its cohesion and internal friction angle increased,so as to achieve the purpose of reducing soil pressure and improving mechanical and deformation properties of retaining wall.展开更多
A new approach named as steel pile method is innovatively proposed in this study to control severe floor heaves in gob-side entry retaining. It is required that the steel piles be installed in the floor corners with a...A new approach named as steel pile method is innovatively proposed in this study to control severe floor heaves in gob-side entry retaining. It is required that the steel piles be installed in the floor corners with a certain interval before the influence of the dynamic pressure induced by current panel extraction. Using numerical simulation and theoretical analysis, this study investigated the interaction between the steel piles and the floor rocks during the service life of the steel piles, and revealed the mechanism of the steel piles in controlling floor heaves. The effect of the steel pile parameters on the control of floor heaves was presented and elaborated. It is found that the effectiveness of the steel piles in controlling floor heaves can be enhanced with greater installed dip angle, longer length and smaller interval of the steel piles.Compared with traditional methods, e.g., using floor anchor bolts and floor restoration, the advantages using steel pile were successfully defined in terms of controlling effect and economic benefits. It is hoped that the proposed method can contribute to the development of gob-side entry retaining technique.展开更多
为了研究航道开挖对新老护岸结构的影响,依托东宗线航道四改三工程,利用大型土工离心模型试验平台研究航道开挖对老挡墙护岸结构、新施工钢板桩的受力和变形特征的影响,得出航道开挖过程中板桩两侧土压力的分布规律。结果表明,随开挖深...为了研究航道开挖对新老护岸结构的影响,依托东宗线航道四改三工程,利用大型土工离心模型试验平台研究航道开挖对老挡墙护岸结构、新施工钢板桩的受力和变形特征的影响,得出航道开挖过程中板桩两侧土压力的分布规律。结果表明,随开挖深度增加,靠岸侧(主动侧)土压力逐渐减小;受板桩位移、变形及离心模型试验重液影响,临水侧(被动侧)土压力部分减小,底部土压力增大。开挖卸载导致老挡墙呈现向水侧移动且向后翻转的趋势。设计工况的极限开挖深度约为3.6 m,此时钢板桩顶部帽梁的水平位移达到0.069 m;对于6、8和10 m 3种长度的板桩,其极限开挖深度约为0.5~0.6倍桩长,且随着桩长增加极限开挖深度逐渐降低。研究得出不同板桩长度下开挖深度的阈值,可为工程建设提供技术参数。展开更多
基金The work is supported by the National Natural Science Foundation of China(No.51578253)Scientific and Technological Planning Project of Xiamen City(Nos.3502Z20172011 and 3502Z20172014)+1 种基金Scientific and Technological Planning Project of Quanzhou City(No.2018C083R)Reform study of graduate education and teaching of Huaqiao University in 2018(No.18YJG55).
文摘The simplified mechanical model and finite element model are established on the basis of the measured results and analysis of the grouting pile deformation monitoring,surface horizontal displacement and vertical displacement monitoring,deep horizontal displacement(inclinometer)monitoring,soil pressure monitoring and seepage pressure monitoring in the lower reaches of Wuan River regulation project in Shishi,Fujian Province.The mechanical behavior and deformation performance of mould-bag pile retaining wall formed after controlled cement grouting in the silty stratum of the test section are analyzed and compared.The results show that the use of controlled cement grouting mould-bag pile technology is to strengthen the soft stratum for sealing water and reinforcement,so that it can rock into a retaining wall,which can both retain soil and seal water with excellent effect.The control of cement grouting technology not only makes the soft soil rock in the range of retaining wall of mould-bag pile,but also makes a wide range of soil around the mould-bag pile squeeze and embed to compaction;and its cohesion and internal friction angle increased,so as to achieve the purpose of reducing soil pressure and improving mechanical and deformation properties of retaining wall.
基金Financial supports for this work,provided by the National Natural Science Foundation of China(Nos.511204167 and 51574227)Chinese National Programs for Fundamental Research and Development(No.2013CB227905),are gratefully acknowledged
文摘A new approach named as steel pile method is innovatively proposed in this study to control severe floor heaves in gob-side entry retaining. It is required that the steel piles be installed in the floor corners with a certain interval before the influence of the dynamic pressure induced by current panel extraction. Using numerical simulation and theoretical analysis, this study investigated the interaction between the steel piles and the floor rocks during the service life of the steel piles, and revealed the mechanism of the steel piles in controlling floor heaves. The effect of the steel pile parameters on the control of floor heaves was presented and elaborated. It is found that the effectiveness of the steel piles in controlling floor heaves can be enhanced with greater installed dip angle, longer length and smaller interval of the steel piles.Compared with traditional methods, e.g., using floor anchor bolts and floor restoration, the advantages using steel pile were successfully defined in terms of controlling effect and economic benefits. It is hoped that the proposed method can contribute to the development of gob-side entry retaining technique.
文摘为了研究航道开挖对新老护岸结构的影响,依托东宗线航道四改三工程,利用大型土工离心模型试验平台研究航道开挖对老挡墙护岸结构、新施工钢板桩的受力和变形特征的影响,得出航道开挖过程中板桩两侧土压力的分布规律。结果表明,随开挖深度增加,靠岸侧(主动侧)土压力逐渐减小;受板桩位移、变形及离心模型试验重液影响,临水侧(被动侧)土压力部分减小,底部土压力增大。开挖卸载导致老挡墙呈现向水侧移动且向后翻转的趋势。设计工况的极限开挖深度约为3.6 m,此时钢板桩顶部帽梁的水平位移达到0.069 m;对于6、8和10 m 3种长度的板桩,其极限开挖深度约为0.5~0.6倍桩长,且随着桩长增加极限开挖深度逐渐降低。研究得出不同板桩长度下开挖深度的阈值,可为工程建设提供技术参数。