Stability is always the most important problem after high slope was excavated.The study analyzed the stress and strain inside the slope by Finite Element Method(FEM) and carried through stress distribution and failure...Stability is always the most important problem after high slope was excavated.The study analyzed the stress and strain inside the slope by Finite Element Method(FEM) and carried through stress distribution and failure zone,then analyzed the stability of the slope using three different methods and came to the conclusion that it is in unstable condition,so the designed retaining wall was put forward which makes the slope stable.展开更多
Based on the study of the slope with gently granular structure in Xingqiao open mine, a new safety cleaning bank mode for steep slope mining was developed, including setting up dint cut, and forming natural retaining ...Based on the study of the slope with gently granular structure in Xingqiao open mine, a new safety cleaning bank mode for steep slope mining was developed, including setting up dint cut, and forming natural retaining wall based on the character of gentle incline slope. It can effectively eliminate the impact of sliding body on the bottom working place and slope body, reduce the dilution of ore, keep rainwater from upper steps away, decrease influence of the weak intermediate layer, and cut cost of disposal waste rock. The safety and reliability of the mode were analyzed and verified from 3 aspects: static load calculation, ANSYS simulation of dynamic loading and spot experiment. The result of static loading calculation shows that the retaining wall can support accumulation and extrusion of granular body, and the glide or overturn disaster will not take place. The simulations of dynamic loading show that the retaining wall remains stable until sliding body collapses from 360 m (10 sublevels). Only one new safety cleaning bank in each 15 sublevels can fully meet the need of engineering. The new mode sustains steep slope (mining,) increases the angle of ultimate slope, and reduces invalid overburden amount of rock by 3%5%. The result of spot experiment has verified the exactness of the above calculations and simulations.展开更多
文摘Stability is always the most important problem after high slope was excavated.The study analyzed the stress and strain inside the slope by Finite Element Method(FEM) and carried through stress distribution and failure zone,then analyzed the stability of the slope using three different methods and came to the conclusion that it is in unstable condition,so the designed retaining wall was put forward which makes the slope stable.
文摘Based on the study of the slope with gently granular structure in Xingqiao open mine, a new safety cleaning bank mode for steep slope mining was developed, including setting up dint cut, and forming natural retaining wall based on the character of gentle incline slope. It can effectively eliminate the impact of sliding body on the bottom working place and slope body, reduce the dilution of ore, keep rainwater from upper steps away, decrease influence of the weak intermediate layer, and cut cost of disposal waste rock. The safety and reliability of the mode were analyzed and verified from 3 aspects: static load calculation, ANSYS simulation of dynamic loading and spot experiment. The result of static loading calculation shows that the retaining wall can support accumulation and extrusion of granular body, and the glide or overturn disaster will not take place. The simulations of dynamic loading show that the retaining wall remains stable until sliding body collapses from 360 m (10 sublevels). Only one new safety cleaning bank in each 15 sublevels can fully meet the need of engineering. The new mode sustains steep slope (mining,) increases the angle of ultimate slope, and reduces invalid overburden amount of rock by 3%5%. The result of spot experiment has verified the exactness of the above calculations and simulations.