Several models of multi-criteria decision-making(MCDM)have identified the optimal alternative electrical energy sources to supply certain load in an isolated region in Al-Minya City,Egypt.The load demand consists of w...Several models of multi-criteria decision-making(MCDM)have identified the optimal alternative electrical energy sources to supply certain load in an isolated region in Al-Minya City,Egypt.The load demand consists of water pumping system with a water desalination unit.Various options containing three different power sources:only DG,PV-B system,and hybrid PV-DG-B,two different sizes of reverse osmosis(RO)units;RO-250 and RO-500,two strategies of energy management;load following(LF)and cycle charging(CC),and two sizes of DG;5 and 10 kW were taken into account.Eight attributes,including operating cost,renewable fraction,initial cost,the cost of energy,excess energy,unmet load,breakeven grid extension distance,and the amount of CO_(2),were used during the evaluation process.To estimate these parameters,HOMER®software was employed to perform both the simulation and optimization process.Four different weight estimation methods were considered;no priority of criteria,based on a pairwise comparisons matrix of the criteria,CRITIC-method,and entropy-based method.The main findings(output results)confirmed that the optimal option for the case study was hybrid PV-DG-B with the following specification:5 kW DG,RO-500,and load following control strategy.Under this condition,the annual operating cost and initial costs were$5546 and$161022,respectively,whereas the cost of energy was 0.077$/kWh.The excess energy and unmet loads were 40998 and 2371 kWh,respectively.The breakeven grid extension distance and the amount of CO_(2) were 3.31 km and 5171 kg per year,respectively.Compared with DG only,the amount of CO_(2) has been sharply reduced by 113939 kg per year.展开更多
文摘Several models of multi-criteria decision-making(MCDM)have identified the optimal alternative electrical energy sources to supply certain load in an isolated region in Al-Minya City,Egypt.The load demand consists of water pumping system with a water desalination unit.Various options containing three different power sources:only DG,PV-B system,and hybrid PV-DG-B,two different sizes of reverse osmosis(RO)units;RO-250 and RO-500,two strategies of energy management;load following(LF)and cycle charging(CC),and two sizes of DG;5 and 10 kW were taken into account.Eight attributes,including operating cost,renewable fraction,initial cost,the cost of energy,excess energy,unmet load,breakeven grid extension distance,and the amount of CO_(2),were used during the evaluation process.To estimate these parameters,HOMER®software was employed to perform both the simulation and optimization process.Four different weight estimation methods were considered;no priority of criteria,based on a pairwise comparisons matrix of the criteria,CRITIC-method,and entropy-based method.The main findings(output results)confirmed that the optimal option for the case study was hybrid PV-DG-B with the following specification:5 kW DG,RO-500,and load following control strategy.Under this condition,the annual operating cost and initial costs were$5546 and$161022,respectively,whereas the cost of energy was 0.077$/kWh.The excess energy and unmet loads were 40998 and 2371 kWh,respectively.The breakeven grid extension distance and the amount of CO_(2) were 3.31 km and 5171 kg per year,respectively.Compared with DG only,the amount of CO_(2) has been sharply reduced by 113939 kg per year.