Ensuring adequate access to truck parking is critical to the safe and efficient movement of freight traffic. There are strict federal guidelines for commercial truck driver rest periods. Rest areas and private truck s...Ensuring adequate access to truck parking is critical to the safe and efficient movement of freight traffic. There are strict federal guidelines for commercial truck driver rest periods. Rest areas and private truck stops are the only places for the trucks to stop legally and safely. In locations without sufficient parking areas, trucks often park on interstate ramps, which create safety risks for other interstate motorists. Historically, agencies have employed costly and time intensive manual counting methods, camera surveillance, and driver surveys to assess truck parking. Connected truck data, available in near real-time, offers an efficient alternative to practitioners to assess truck parking patterns and identify areas where there may be insufficient safe parking spaces. This paper presents a case study of interstate I-70 in east central Indiana and documents the observed spatiotemporal impacts of a rest area closure on truck parking on nearby interstate ramps. Results showed that there was a 28% increase in parking on ramps during the rest area closure. Analysis also found that ramps closest to the rest area were most impacted by the closure, seeing a rise in truck parking sessions as high as 2.7 times. Parking duration on the ramps during rest area closure also increased drastically. Although it was expected that this would result in increased parking by trucks on adjacent ramps, this before, during, after scenario provided an ideal scenario to evaluate the robustness of these techniques to assess changing parking characteristics of long-haul commercial trucks. The data analytics and visualization tools presented in this study are scalable nationwide and will aid stakeholders in informed data-driven decision making when allocating resources towards improving the nations commercial vehicle parking infrastructure.展开更多
With the increasing penetration of renewable energy in power system,renewable energy power ramp events(REPREs),dominated by wind power and photovoltaic power,pose significant threats to the secure and stable operation...With the increasing penetration of renewable energy in power system,renewable energy power ramp events(REPREs),dominated by wind power and photovoltaic power,pose significant threats to the secure and stable operation of power systems.This paper presents an early warning method for REPREs based on long short-term memory(LSTM)network and fuzzy logic.First,the warning levels of REPREs are defined by assessing the control costs of various power control measures.Then,the next 4-h power support capability of external grid is estimated by a tie line power predictionmodel,which is constructed based on the LSTMnetwork.Finally,considering the risk attitudes of dispatchers,fuzzy rules are employed to address the boundary value attribution of the early warning interval,improving the rationality of power ramp event early warning.Simulation results demonstrate that the proposed method can generate reasonable early warning levels for REPREs,guiding decision-making for control strategy.展开更多
This paper represents a case study of traffic congestion within a section on Al Seeb Street highway due to the on-ramp merging of vehicles that causes a bottleneck in the mainline road. It studies the efficiency of in...This paper represents a case study of traffic congestion within a section on Al Seeb Street highway due to the on-ramp merging of vehicles that causes a bottleneck in the mainline road. It studies the efficiency of installing ramp metering within a ramp within the selected study zone. This is done by simulating the collected data using Vissim software by drawing three one-hour-long scenarios;the first scenario reflects the data collected for 30 minutes duration and is used as a base scenario to draw the other two scenarios, which are reflected as factored-up scenarios to create a situation observed in the early morning in the study zone at 6:00-7:00 in which slowing down of speeds exist, and breakdown is raised in working days. The two factoring-up scenarios were as follows: one without ramp metering and the other without ramp metering. Each scenario was calibrated and run five times with random seeds, and then the average was considered. The simulation examines the ability of RM to smooth traffic in mainline and reduce queuing on on-ramp roads within the selected study zone by comparing the performance of the network for the scenarios and comparing them in terms of the overall delays, number of stops and the average speeds for the vehicles within the mainline. The results showed a good performance reflected by the scenario with ramp metering with a reduction of the overall delay, a decrease in stops number and an increase of the average speed were achieved. For the base scenario, a visualization (video extracted from Vissim software) was extracted, showing no need to install RM with an associated table showing a number of stops equal to zero with an average speed of 102.74 km/h and a total delay of 6045 seconds. For the second scenario with no RM, a visualization was extracted showing a slowing down of speeds for vehicles within the mainline while vehicles merging from the on-ramp and need to be controlled with a table showing a number of stops equal to 16 and an average speed equal to 58 km/h and a total delay of 916,874 seconds. For the third scenario with RM, a visualization was extracted showing good control of the second scenario with a table showing the number of stops equal to 6, an average speed equal to 61 km/h and a total delay equal to 484,466 seconds. Ten literatures in regard to this study have been reviewed. The data collected are quantitative, which are collected using an indirect manual counting method and then the data is used to feed the software for simulation.展开更多
This paper analyzes the structural design of an urban interchange ramp bridge from four aspects,which are the superstructure,pier structure,foundation structure,and deck structure design to summarize the structural de...This paper analyzes the structural design of an urban interchange ramp bridge from four aspects,which are the superstructure,pier structure,foundation structure,and deck structure design to summarize the structural design ideas of this urban interchange ramp bridge,which can be used as a reference for future construction of the same bridge.展开更多
This article explores the fundamentals of small-radius curved ramp bridges.It covers the selection of box girder spans,support methods,and forms,along with design optimization techniques for this type of bridge struct...This article explores the fundamentals of small-radius curved ramp bridges.It covers the selection of box girder spans,support methods,and forms,along with design optimization techniques for this type of bridge structure.The purpose of this paper is to provide robust support for enhancing the design quality of these bridges and ensuring their efficacy in real-world applications.展开更多
文摘Ensuring adequate access to truck parking is critical to the safe and efficient movement of freight traffic. There are strict federal guidelines for commercial truck driver rest periods. Rest areas and private truck stops are the only places for the trucks to stop legally and safely. In locations without sufficient parking areas, trucks often park on interstate ramps, which create safety risks for other interstate motorists. Historically, agencies have employed costly and time intensive manual counting methods, camera surveillance, and driver surveys to assess truck parking. Connected truck data, available in near real-time, offers an efficient alternative to practitioners to assess truck parking patterns and identify areas where there may be insufficient safe parking spaces. This paper presents a case study of interstate I-70 in east central Indiana and documents the observed spatiotemporal impacts of a rest area closure on truck parking on nearby interstate ramps. Results showed that there was a 28% increase in parking on ramps during the rest area closure. Analysis also found that ramps closest to the rest area were most impacted by the closure, seeing a rise in truck parking sessions as high as 2.7 times. Parking duration on the ramps during rest area closure also increased drastically. Although it was expected that this would result in increased parking by trucks on adjacent ramps, this before, during, after scenario provided an ideal scenario to evaluate the robustness of these techniques to assess changing parking characteristics of long-haul commercial trucks. The data analytics and visualization tools presented in this study are scalable nationwide and will aid stakeholders in informed data-driven decision making when allocating resources towards improving the nations commercial vehicle parking infrastructure.
基金funded by State Grid Shandong Electric Power Company Technology Project(520626220110).
文摘With the increasing penetration of renewable energy in power system,renewable energy power ramp events(REPREs),dominated by wind power and photovoltaic power,pose significant threats to the secure and stable operation of power systems.This paper presents an early warning method for REPREs based on long short-term memory(LSTM)network and fuzzy logic.First,the warning levels of REPREs are defined by assessing the control costs of various power control measures.Then,the next 4-h power support capability of external grid is estimated by a tie line power predictionmodel,which is constructed based on the LSTMnetwork.Finally,considering the risk attitudes of dispatchers,fuzzy rules are employed to address the boundary value attribution of the early warning interval,improving the rationality of power ramp event early warning.Simulation results demonstrate that the proposed method can generate reasonable early warning levels for REPREs,guiding decision-making for control strategy.
文摘This paper represents a case study of traffic congestion within a section on Al Seeb Street highway due to the on-ramp merging of vehicles that causes a bottleneck in the mainline road. It studies the efficiency of installing ramp metering within a ramp within the selected study zone. This is done by simulating the collected data using Vissim software by drawing three one-hour-long scenarios;the first scenario reflects the data collected for 30 minutes duration and is used as a base scenario to draw the other two scenarios, which are reflected as factored-up scenarios to create a situation observed in the early morning in the study zone at 6:00-7:00 in which slowing down of speeds exist, and breakdown is raised in working days. The two factoring-up scenarios were as follows: one without ramp metering and the other without ramp metering. Each scenario was calibrated and run five times with random seeds, and then the average was considered. The simulation examines the ability of RM to smooth traffic in mainline and reduce queuing on on-ramp roads within the selected study zone by comparing the performance of the network for the scenarios and comparing them in terms of the overall delays, number of stops and the average speeds for the vehicles within the mainline. The results showed a good performance reflected by the scenario with ramp metering with a reduction of the overall delay, a decrease in stops number and an increase of the average speed were achieved. For the base scenario, a visualization (video extracted from Vissim software) was extracted, showing no need to install RM with an associated table showing a number of stops equal to zero with an average speed of 102.74 km/h and a total delay of 6045 seconds. For the second scenario with no RM, a visualization was extracted showing a slowing down of speeds for vehicles within the mainline while vehicles merging from the on-ramp and need to be controlled with a table showing a number of stops equal to 16 and an average speed equal to 58 km/h and a total delay of 916,874 seconds. For the third scenario with RM, a visualization was extracted showing good control of the second scenario with a table showing the number of stops equal to 6, an average speed equal to 61 km/h and a total delay equal to 484,466 seconds. Ten literatures in regard to this study have been reviewed. The data collected are quantitative, which are collected using an indirect manual counting method and then the data is used to feed the software for simulation.
文摘This paper analyzes the structural design of an urban interchange ramp bridge from four aspects,which are the superstructure,pier structure,foundation structure,and deck structure design to summarize the structural design ideas of this urban interchange ramp bridge,which can be used as a reference for future construction of the same bridge.
文摘This article explores the fundamentals of small-radius curved ramp bridges.It covers the selection of box girder spans,support methods,and forms,along with design optimization techniques for this type of bridge structure.The purpose of this paper is to provide robust support for enhancing the design quality of these bridges and ensuring their efficacy in real-world applications.