期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Developing a risk assessment system for gas tunnel disasters in China 被引量:6
1
作者 KANG Xiao-bing LUO Sheng +2 位作者 LI Qing-shan XU Mo LI Qiang 《Journal of Mountain Science》 SCIE CSCD 2017年第9期1751-1762,共12页
Gas disasters always restrict the tunnel constructions in mountain area, which becomes a major geological barrier against the development of underground engineering. China is rich in coal resources and has a large amo... Gas disasters always restrict the tunnel constructions in mountain area, which becomes a major geological barrier against the development of underground engineering. China is rich in coal resources and has a large amount of gas with a wide range of distribution. However, China experienced not only adverse effects on coal mining but also gas disasters in underground engineering construction, such as tunnels and chambers. With the increased number of tunnels passing through coal-bearing strata, the incidence of gas accidents is also rising. Therefore, the significance of preventing and mitigating gas disasters should be emphasized, and an effective risk assessment method for gas disasters should be established. On the basis of research on over 100 gas tunnels in China, a relatively ideal gas disaster risk assessment method and system for tunnels are established through the following measures. Firstly, geo-environmental conditions and gas situations were analyzed during construction. Secondly, qualitative analysis was combined with quantitative analysis. Finally, the influencing factors of gas disasters, including geological conditions, gas,and human factors, were investigated. The gas tunnel risk assessment system includes three levels:(1) the grading assessment of a gas tunnel during the planning stage,(2) the risk assessment of gas tunnel construction during the design and construction stages,(3) the gas tunnel outburst risk assessment during the coal uncovering stage. This system was applied to the dynamic assessment of gas disaster during the construction of the Zipingpu tunnel of Dujiangyan–Wenchuan Highway(in Sichuan, Southwest China). The assessment results were consistent with the actual excavation, which verified the rationality and feasibility of the system. The developed system was believed to be back-up and applied for risk assessment of gas disaster in the underground engineering construction. 展开更多
关键词 Tunnel engineering Gas disasters risk assessment Index system Zipingpu tunnel
下载PDF
Ecological risk assessment of heavy metals in surface seawater and sediment near the outlet of a zinc factory in Huludao City, Liaoning Province, China 被引量:3
2
作者 冯永亮 陈燕珍 +4 位作者 王静 宫玉峰 刘希刚 牟刚 田华 《Chinese Journal of Oceanology and Limnology》 SCIE CAS CSCD 2016年第6期1320-1331,共12页
At present, the methods widely applied to assess ecological risk of heavy metals are essentially single-point estimates in which exposure and toxicity data cannot be fully used and probabilities of adverse biological ... At present, the methods widely applied to assess ecological risk of heavy metals are essentially single-point estimates in which exposure and toxicity data cannot be fully used and probabilities of adverse biological effects cannot be achieved. In this study, based on investigation of concentrations of six heavy metals(As, Hg, Pb, Cd, Cu, and Zn) in the surface seawater and sediment near the outlet of a zinc factory, located in Huludao City, Liaoning Province, China, a tiered approach consisting of several probabilistic options was used to refi ne ecological risk assessment for the individuals. A mixture of various heavy metals was detected in the surface seawater, and potential ecological risk index(PERI) was adopted to assess the potential ecological risk of heavy metals in the surface sediment. The results from all levels of aquatic ecological risk assessment in the tiered framework, ranging from comparison of single effects and exposure values to the use of distribution-based Hazard Quotient obtained through Monte Carlo simulation, are consistent with each other. Briefl y, aquatic Zn and Cu posed a clear ecological risk, while Cd, Pb, Hg, and As in the water column posed potential risk. As expected, combined ecological risk of heavy metal mixture in the surface seawater was proved signifi cantly higher than the risk caused by any individual heavy metal, calculated using the concept of total equivalent concentration. According to PERI, the severity of pollution by the six heavy metals in the surface sediment decreased in the following sequence: Cd>Hg>As>Pb>Cu>Zn, and the total heavy metals in the sediment posed a very high risk to the marine environment. This study provides a useful mathematical framework for ecological risk assessment of heavy metals. 展开更多
关键词 heavy metal ecological risk assessment zinc factory joint probability curve Monte Carlo potential ecological risk index
下载PDF
Constructing an assessment index system for strategic risk management in coal science and technology enterprises
3
作者 Fan Baoying Yuan Yingju 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第4期653-660,共8页
Coal occupies a dominant position in China's national economy and is an essential energy source for future industrial development. To inform the efficient and sustainable development of the coal industry, this paper ... Coal occupies a dominant position in China's national economy and is an essential energy source for future industrial development. To inform the efficient and sustainable development of the coal industry, this paper analyzes the sources of strategic risk for coal science and technology enterprises using 3 first-class indicators, 10 second-level indicators, and 37 observation points established through the existing research literature and experience. Moreover, in accordance to the obtained initial index data, the selected indicators have been tested and screened using reliability and membership degree analyses to remove redundant variables, avoid juxtaposition of risk factors at different levels, and reduce the influ- ence of some tiny risk factors for enterprise strategic risk. Then, factor analysis of external environment factor sub-scale was carried out. Factors are extracted according to a standard characteristic value greater than 1. Variables with high coefficients are classified into one factor category; and finally, 3 first-class indicators. 8 second-level indicators, and 37 observation noints are reconstructed. 展开更多
关键词 Coal science and technology enterprises Strategic risk risk assessment index Constructing
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部