Based on 2022 and 2023 hydrometric data and satellite images (Sentinel 2022, SPOT 2010), this study aims to present the Nokoué Lake and its channels’ re-cent hydromorphological characteristics. Integrating flow,...Based on 2022 and 2023 hydrometric data and satellite images (Sentinel 2022, SPOT 2010), this study aims to present the Nokoué Lake and its channels’ re-cent hydromorphological characteristics. Integrating flow, tributary morphology, and topography data determined specific power values along the axes studied. The values obtained range from 2.69 to 12.92 W/m2 for Ouémé River and 2.46 to 10.99 W/m2 for Sô River. The resulting water erosion on banks and bottoms is of linear, areolar, or gully and claw types. Lake bathymetry varies from -0.5 to -2.6 m (low flow period) and -1 to -4 m;in the Ouémé, Sô, and Totchè rivers, it varies from -5 m to -7 m, reaching -10 m at the Cotonou channel entrance (flood period). Bathymetric profiles reveal varied “U”, “V” and “Intermediate” bottom morphologies, influenced by erosion/sedimentation processes and human activities. The flow facies identified are lentic in the northern tributaries and lotic in the Cotonou and Totchè canals. Spatial analysis identified nine (09) thematic classes. In 2022, the surface area of the water body has increased from 274 km2 at low water to 280 km2 at high water, whereas in 2010 (a recent year of exceptional flooding), the surface area was 270 km2 at low water and 277 km2 at high water. Significant changes in land use are observed between 2010 and 2022. The floodplain area decreased slightly, from 421 km2 in 2010 (year of exceptional flooding) to 419 km2 in 2022. The evolution of land use shows a progressive expansion of the urban environment to the detriment of the natural environment. In the medium to long term, this trend could threaten the hydromorphological balance and even the existence of this important lagoon ecosystem.展开更多
Based on analyzing the limitations of the commonly used back-propagation neural network (BPNN), a wavelet neural network (WNN) is adopted as the nonlinear river channel flood forecasting method replacing the BPNN....Based on analyzing the limitations of the commonly used back-propagation neural network (BPNN), a wavelet neural network (WNN) is adopted as the nonlinear river channel flood forecasting method replacing the BPNN. The WNN has the characteristics of fast convergence and improved capability of nonlinear approximation. For the purpose of adapting the timevarying characteristics of flood routing, the WNN is coupled with an AR real-time correction model. The AR model is utilized to calculate the forecast error. The coefficients of the AR real-time correction model are dynamically updated by an adaptive fading factor recursive least square(RLS) method. The application of the flood forecasting method in the cross section of Xijiang River at Gaoyao shows its effectiveness.展开更多
Quantitative analysis was performed on the filling-scouring process for the river reach within Makou and Tianjiazhen, the middle Yangtze River with the help of GIS and DEM techniques. The research results indicate tha...Quantitative analysis was performed on the filling-scouring process for the river reach within Makou and Tianjiazhen, the middle Yangtze River with the help of GIS and DEM techniques. The research results indicate that the river reach between Makou and Tianjiaz- hen was dominated by the scouring process, and the magnitude of scouring is increasing over time. The intensity of scouring process is more in the deep and narrower river reach than shallower and wider ones. The river reach in the Makou and Tianjiazhen river knot is in frequent scouring and filling process, however the river reach upper to the Makou and lower to the Tianjiazhen river knot is in moderate scouring and filling process. The river reach just upstream or downstream to the river knot (e.g. Makou and Tianjiazhen river knot in this research) is dominated by filling process and the river reach in the river knot is dominated by the scouring process. Research results indicate no changes in the boundary of the river but the scouring and the filling magnitude in specific river channel is strong. The filling and the scouring process of the study river reach is greatly impacted by the sediments and water from the upstream of the study river reach. The construction of the Three Gorges Dam just up- stream to Yichang will cause further decrease of the release of the sediment load to the middle and the lower Yangtze River basin, which will further intensify the scouring process of the river channel in the study river reach.展开更多
A two-dimensional flow numerical model of the tidal reaches, which total length is more than 700 km, is established from Datong to the Yangtze River estuary. The tidal levels, velocities, diversion ratios and dynamic ...A two-dimensional flow numerical model of the tidal reaches, which total length is more than 700 km, is established from Datong to the Yangtze River estuary. The tidal levels, velocities, diversion ratios and dynamic axes before and after the separate regulation of each reach and combined regulation of all reaches are obtained. The comparative analysis shows that the regulation project of a separate reach basically has no impact on velocity distributions and variations of diversion ratios of upper and lower reaches, the variations of dynamic axes are only within the local scope of the project. The regulation project of a separate reach also has less impact on the water level in the lower adjacent reaches, but will make the water levels in the upper reaches rise. After the implementation of the regulation projects for all reaches, the rise of water level in the upstream reaches will have a cumulative impact.展开更多
According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research...According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research results achieved in the demonstration stage.It is indicated through analysis that the reservoir sediment deposition and downstream river channel scouring during 8-year impoundment and operation are still within the original forecast,so the original forecasting results are feasible.The further observation and comparison should be conducted because the comparison between the observed data and the original forecast is not so sufficient in time and the prototype observation and related research work should be strengthened in the future.展开更多
Recent years have seen the rapid development of China’s economy and urban construction. In this context, in order to meet the needs of people’s daily production and life for water resources, river channel improvemen...Recent years have seen the rapid development of China’s economy and urban construction. In this context, in order to meet the needs of people’s daily production and life for water resources, river channel improvement has become an important task. However, according to the analysis of objective factors, the way of human governance, which is contrary to the laws of nature, can lead to the destruction of river ecosystems. Based on this, this paper mainly discusses river ecological restoration around river channel improvement.展开更多
The historical formation and development of the abandoned channel of the Yellow River is reviewed and its causes of formation and present condition of prevention and control are analyzed in this paper. Based on this a...The historical formation and development of the abandoned channel of the Yellow River is reviewed and its causes of formation and present condition of prevention and control are analyzed in this paper. Based on this analysis, some ideas about control, critical problems and countermeasures in the next period are proposed with two typical control models as examples. We suggest that in preventing and controlling the wind-drift sandy lands in the region, the emphasis should be to develop, with a greatly expanded effort, a recycling economy. This should realize a combination of two ideas, i.e. integrate combating desertification with a structural adjustment of agricultural and an increase in the income of farmers.展开更多
1 Introduction Morphological analysis on the planform migration structure of meandering river is an important basis for the reconstruction of evolution of paleochannel.Besides,it is a significant method for restoratio...1 Introduction Morphological analysis on the planform migration structure of meandering river is an important basis for the reconstruction of evolution of paleochannel.Besides,it is a significant method for restoration of rivers through the展开更多
Assessing environmental flows (e-flows) for urban rivers is important for water resources planning and river protection, Many e-flow assessment methods have been established based on species' habitat pro- vision re...Assessing environmental flows (e-flows) for urban rivers is important for water resources planning and river protection, Many e-flow assessment methods have been established based on species' habitat pro- vision requirements and pollutant dilution requirements, To avoid flood risk, however, many urban rivers have been transformed into straight, trapezoidal-profiled concrete channels, leading to the disappearance of valuable species, With the construction of water pollution-control projects, pollutant inputs into rivers have been effectively controlled in some urban rivers, For these rivers, the e-flows determined by tradi- tional methods will be very small, and will consequently lead to a low priority being given to river pro- tection in future water resources allocation and management, To more effectively assess the e-flows of channelized urban rivers, we propose three e-flow degrees, according to longitudinal hydrological con- nectivity (high, medium, and low), in addition to the pollutant dilution water requirement determined by the mass-balance equation, In the high connectivity scenario, the intent is for the e-flows to maintain flow velocity, which can ensure the self-purification of rivers and reduce algal blooms; in the medium connectivity scenario, the intent is for the e-flows to permanently maintain the longitudinal hydrological connectivity of rivers that are isolated into several ponds by means of weirs, in order to ensure the exchange of material, energy, and information in rivers; and in the low connectivity scenario, the intent is for the e-flows to intermittently connect isolated ponds every few days (which is designed to further reduce e-flows), The proposed methods have been used in Shiwuli River, China, to demonstrate their effectiveness, The new methods can offer more precise and realistic e-flow results and can effectively direct the construction and management of e-flow supply projects,展开更多
A theoretical model of river channel changes is presented, which shows some nonequilibrium thermodynamic criteria of a river channel to bedding and equilibrium.
The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments ...The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments have been fulfilled to evaluate the effect of the project on the natural environment. To fill the gap of investigations, a study on flood and suspended sediment transportation and channel changing along the distributary channel of the Huanghe (Yellow) River was conducted during the WSDR project period in 2007. The lower channel was scoured rapidly and the channel became unobstructed gradually several days after the flood peak water was discharged from the Xiaolangdi Reservoir. Within four days after the flood peak at 3 000 m3/s entered the distributary, the channel in the river mouth area was eroded quickly. Both the mean values of area and depth of the main channel were tripled, and the maximum flood carrying capacity increased to 5 500 m3/s or more. Then, the river channel was silted anew in a very short time after completion of the WSDR. Favored by the WSDR project, the fiver status in April 2008 became better than that of the year before. The adjustment ranges of main channel parameters were about 30%, 10%, and 10% at sections C2, Q4, and Q7, respectively. The process of rapid erosion-deposition was more active 15 km away in the channel from the fiver mouth due to the marine influence. It is reasonable for discharging sediment at concentration peak from Xiaolangdi Reservoir at the end of the flood peak. As a result, the sediment peak reached the river mouth about two days later than that of the water current. In addition, the WSDR project has improved the development of the estuarine wetland. Wetland vegetation planted along the river banks restrained the water flow as a strainer and improved the main channel stability. It is suggested to draw water at mean rate of 150 m3/s from the Huanghe River during flood periods, because at the rate the water in the wetland would be stored and replenished in balance. Moreover, we believe that cropland on the river shoal of the lower Huanghe River should be replaced by wetland. These activities should achieve the Huanghe River management strategy of "To concentrate flow to scour sediment, stabilize the main channel, and regulate water and sediment".展开更多
The lower Mississippi River(LMR) has been heavily modified for multiple human purposes such as navigation, flood control, and bank stabilization. However, the LMR simultaneously supports a diverse fish fauna that incl...The lower Mississippi River(LMR) has been heavily modified for multiple human purposes such as navigation, flood control, and bank stabilization. However, the LMR simultaneously supports a diverse fish fauna that includes recreational and commercial fisheries. Due to river training and diversion structures constructed during the past 80 years, the historic characteristics of the LMR have been drastically altered and have likely influenced fishes and fisheries in the system. One common restoration measure used throughout the LMR has been to "notch" wing-dike structures that close secondary(side) river channels. Dike notching allows year-round flows through secondary channels, which enhances habitat diversity and promotes biological productivity at the ecosystem scale. Although notching is presumed good for LMR fishes and other biota, few studies have examined its effects on fish assemblages. In this study, fish assemblages were sampled at seven LMR secondary channels spanning from river kilometer(rkm) 628(Louisiana-Mississippi, U.S.A.) upstream to rkm 1504(Missouri-Kentucky, U.S.A.). Four secondary channels were termed "permanent"(i.e.,with notched dikes) while three secondary channels were termed "temporary"(i.e., without notched dikes).Fishes were sampled by boat-mounted electrofishing conducted during falling and low stages from1995—1997. Fish assemblages differed between permanent and temporary secondary channels, and varied somewhat between falling and low stages. Gizzard shad(Dorosoma cepedianum), threadfin shad(D. petenense), and white bass(Morone chrysops) demonstrated consistent preferences for low-current conditions associated with temporary secondary channels. Conversely, blue catfish(Ictalurus furcatus), flathead catfish(Pylodictis olivaris), and freshwater drum(Aplodinotus grunniens) were more associated with permanent secondary channels. Future restoration strategies in the LMR should consider dike notching and resultant maintenance of permanent secondary channels in selected river reaches. However, temporary secondary channels also contain unique fish species, and also appear to be important sites of riverine primary production. Restoration strategies should consider a balance of both secondary channel types, which should support the greatest biodiversity for the LMR ecosystem.展开更多
There are three major types of tidal channels along the coast of the Huanghe (Yellow) River Delta: tidal inlets, tidal creeks, and tidal channels developed from abandoned river channels. The tidal inlets develop mainl...There are three major types of tidal channels along the coast of the Huanghe (Yellow) River Delta: tidal inlets, tidal creeks, and tidal channels developed from abandoned river channels. The tidal inlets develop mainly in two areas with weak erosion and barrier islands. The tidal channels formed from abandoned river channels mainly developed in the area of the new delta lobes formed since 1934. Tidal creeks developed in the intertidal zone and distributed along almost all parts of the Huanghe River Delta coast, but their scales and features are different.展开更多
On September 10, 2015, unprecedented flood was occurred in Kinugawa River basin located on eastern Japan. It inundated 40 km2 of flood plain in Joso city, Ibaraki Prefecture, and more than 4000 people there called for...On September 10, 2015, unprecedented flood was occurred in Kinugawa River basin located on eastern Japan. It inundated 40 km2 of flood plain in Joso city, Ibaraki Prefecture, and more than 4000 people there called for help despite supposedly having sufficient time to evacuate. Some said that small initial flood before main severe flood arrived made them make a mistake in deciding whether to evacuate or stay there, despite having to actually evacuate in reality. This study focused on flood behaviour in this area, in particular, the effect of a small drainage channel lying on the flood plain which caused fast flood diffusion in case of occurring huge overflowing. Field investigations starting on time of the disaster with high-resolution positioning system were conducted to obtain spatial maps of flood depth and height. For appropriate modelling of the effect of small channel, we applied simulation model coupling 1-dimensional (1D) and 2-dimensional (2D) hydraulic scheme on the field and compared results from the 1D/2D coupled model and model without 1D scheme. The models provided information that the flood could reach 4 hours earlier to the city central of Joso city comparing in case of model without 1D scheme. The water depth rose irregularly and it was more confusing and difficult for the victims to make appropriate evacuation act.展开更多
Flood is occurring more frequently in Kuching nowadays due to the impact of climate change and rapid urbanization. The only discharge outlet for Sarawak River Basin currently is at Kuching Barrage and Shiplock. Sarawa...Flood is occurring more frequently in Kuching nowadays due to the impact of climate change and rapid urbanization. The only discharge outlet for Sarawak River Basin currently is at Kuching Barrage and Shiplock. Sarawak State Government had decided to build Matang Bypass Channel from Sarawak River’s “Oxbow” to Batang Salak River for mitigating the flooding issues within Sarawak River Basin. Matang Bypass Channel had a bottom width of 250 m, 500 m reserve width and 8 Km in length. Flow behaviour with two discharge outlets during low tides are unknown yet. Therefore, this research is carried out to study Sarawak River flow behaviour after construction of Matang Bypass Channel using InfoWorks River Simulation (RS). Rainfall data used is January 2018. Four scenarios investigated are 1) Open two gates at Matang Bypass Channel opens and all gates at Kuching Barrage, 2) Open all gates at Matang Bypass Channel and Kuching Barrage, 3) Open gates at Matang Bypass Channel, but close all gates at Kuching Barrage, 4) Close all gates at Matang Bypass Channel, but open all gates at Kuching Barrage. Results revealed that when water gates are opened, sea water has the potential to backflow into Sarawak River basin through Kuching Barrage since sea level at Kuching Barrage discharge outlet is always 0.5 m higher than Matang Bypass Channel discharge outlet. When the gates at Matang Bypass Channel are fully opened and Kuching Barrage are closed, Kuching Barrage will retain the excess water and the river water will only be discharged into ocean through Matang Bypass Channel. In contrast, as the gates at Matang Bypass Channel are closed and at Kuching Barrage are fully opened, Matang Bypass Channel will store the excess water and river water will be discharged through Kuching Barrage alone.展开更多
An improved divided channel method has been proposed by modelling a parameter using the function of depth ratio for a multi-stage compound channel. Experimental data suggest that as the flow depth increases over the s...An improved divided channel method has been proposed by modelling a parameter using the function of depth ratio for a multi-stage compound channel. Experimental data suggest that as the flow depth increases over the second stage floodplain, fractional contribution of the main channel and first stage floodplain under bankfull height plays a pivotal role in shear layer and momentum distribution. Therefore, a new mathematical model has been suggested for estimating the stage-discharge relationship for staged channels of more than one floodplain using the 1D technique of overall roughness correction. .展开更多
文摘Based on 2022 and 2023 hydrometric data and satellite images (Sentinel 2022, SPOT 2010), this study aims to present the Nokoué Lake and its channels’ re-cent hydromorphological characteristics. Integrating flow, tributary morphology, and topography data determined specific power values along the axes studied. The values obtained range from 2.69 to 12.92 W/m2 for Ouémé River and 2.46 to 10.99 W/m2 for Sô River. The resulting water erosion on banks and bottoms is of linear, areolar, or gully and claw types. Lake bathymetry varies from -0.5 to -2.6 m (low flow period) and -1 to -4 m;in the Ouémé, Sô, and Totchè rivers, it varies from -5 m to -7 m, reaching -10 m at the Cotonou channel entrance (flood period). Bathymetric profiles reveal varied “U”, “V” and “Intermediate” bottom morphologies, influenced by erosion/sedimentation processes and human activities. The flow facies identified are lentic in the northern tributaries and lotic in the Cotonou and Totchè canals. Spatial analysis identified nine (09) thematic classes. In 2022, the surface area of the water body has increased from 274 km2 at low water to 280 km2 at high water, whereas in 2010 (a recent year of exceptional flooding), the surface area was 270 km2 at low water and 277 km2 at high water. Significant changes in land use are observed between 2010 and 2022. The floodplain area decreased slightly, from 421 km2 in 2010 (year of exceptional flooding) to 419 km2 in 2022. The evolution of land use shows a progressive expansion of the urban environment to the detriment of the natural environment. In the medium to long term, this trend could threaten the hydromorphological balance and even the existence of this important lagoon ecosystem.
基金The National Natural Science Foundation of China(No.50479017).
文摘Based on analyzing the limitations of the commonly used back-propagation neural network (BPNN), a wavelet neural network (WNN) is adopted as the nonlinear river channel flood forecasting method replacing the BPNN. The WNN has the characteristics of fast convergence and improved capability of nonlinear approximation. For the purpose of adapting the timevarying characteristics of flood routing, the WNN is coupled with an AR real-time correction model. The AR model is utilized to calculate the forecast error. The coefficients of the AR real-time correction model are dynamically updated by an adaptive fading factor recursive least square(RLS) method. The application of the flood forecasting method in the cross section of Xijiang River at Gaoyao shows its effectiveness.
基金The research was financially supported by the Laboratory for Climate Studies, National Climate Center, China Meteorological Administration, No.CCSF2007-35 Supported by the Research Grants Council of the Hong Kong Special Administrative Region, China, No.CUHK4627/05H
文摘Quantitative analysis was performed on the filling-scouring process for the river reach within Makou and Tianjiazhen, the middle Yangtze River with the help of GIS and DEM techniques. The research results indicate that the river reach between Makou and Tianjiaz- hen was dominated by the scouring process, and the magnitude of scouring is increasing over time. The intensity of scouring process is more in the deep and narrower river reach than shallower and wider ones. The river reach in the Makou and Tianjiazhen river knot is in frequent scouring and filling process, however the river reach upper to the Makou and lower to the Tianjiazhen river knot is in moderate scouring and filling process. The river reach just upstream or downstream to the river knot (e.g. Makou and Tianjiazhen river knot in this research) is dominated by filling process and the river reach in the river knot is dominated by the scouring process. Research results indicate no changes in the boundary of the river but the scouring and the filling magnitude in specific river channel is strong. The filling and the scouring process of the study river reach is greatly impacted by the sediments and water from the upstream of the study river reach. The construction of the Three Gorges Dam just up- stream to Yichang will cause further decrease of the release of the sediment load to the middle and the lower Yangtze River basin, which will further intensify the scouring process of the river channel in the study river reach.
基金financially supported by the Major Project"Golden Waterway Capacity Enhancement Technology"of Ministry of Transport of China(Grant No.201132874640)
文摘A two-dimensional flow numerical model of the tidal reaches, which total length is more than 700 km, is established from Datong to the Yangtze River estuary. The tidal levels, velocities, diversion ratios and dynamic axes before and after the separate regulation of each reach and combined regulation of all reaches are obtained. The comparative analysis shows that the regulation project of a separate reach basically has no impact on velocity distributions and variations of diversion ratios of upper and lower reaches, the variations of dynamic axes are only within the local scope of the project. The regulation project of a separate reach also has less impact on the water level in the lower adjacent reaches, but will make the water levels in the upper reaches rise. After the implementation of the regulation projects for all reaches, the rise of water level in the upstream reaches will have a cumulative impact.
基金support from the Technology Pillar Program during the"Eleventh Five-year Plan"Period (No.2006BAB05B02No.2006BAB05B03) are acknowledged
文摘According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research results achieved in the demonstration stage.It is indicated through analysis that the reservoir sediment deposition and downstream river channel scouring during 8-year impoundment and operation are still within the original forecast,so the original forecasting results are feasible.The further observation and comparison should be conducted because the comparison between the observed data and the original forecast is not so sufficient in time and the prototype observation and related research work should be strengthened in the future.
基金Sponsored by Nanchong Science and Technology Project(18SXHZ0006)
文摘Recent years have seen the rapid development of China’s economy and urban construction. In this context, in order to meet the needs of people’s daily production and life for water resources, river channel improvement has become an important task. However, according to the analysis of objective factors, the way of human governance, which is contrary to the laws of nature, can lead to the destruction of river ecosystems. Based on this, this paper mainly discusses river ecological restoration around river channel improvement.
文摘The historical formation and development of the abandoned channel of the Yellow River is reviewed and its causes of formation and present condition of prevention and control are analyzed in this paper. Based on this analysis, some ideas about control, critical problems and countermeasures in the next period are proposed with two typical control models as examples. We suggest that in preventing and controlling the wind-drift sandy lands in the region, the emphasis should be to develop, with a greatly expanded effort, a recycling economy. This should realize a combination of two ideas, i.e. integrate combating desertification with a structural adjustment of agricultural and an increase in the income of farmers.
基金supported by National Natural Sciences Fund (No. 41372125)Fund of Ministry of Education of Hubei Province (No. Q20121210)
文摘1 Introduction Morphological analysis on the planform migration structure of meandering river is an important basis for the reconstruction of evolution of paleochannel.Besides,it is a significant method for restoration of rivers through the
文摘Assessing environmental flows (e-flows) for urban rivers is important for water resources planning and river protection, Many e-flow assessment methods have been established based on species' habitat pro- vision requirements and pollutant dilution requirements, To avoid flood risk, however, many urban rivers have been transformed into straight, trapezoidal-profiled concrete channels, leading to the disappearance of valuable species, With the construction of water pollution-control projects, pollutant inputs into rivers have been effectively controlled in some urban rivers, For these rivers, the e-flows determined by tradi- tional methods will be very small, and will consequently lead to a low priority being given to river pro- tection in future water resources allocation and management, To more effectively assess the e-flows of channelized urban rivers, we propose three e-flow degrees, according to longitudinal hydrological con- nectivity (high, medium, and low), in addition to the pollutant dilution water requirement determined by the mass-balance equation, In the high connectivity scenario, the intent is for the e-flows to maintain flow velocity, which can ensure the self-purification of rivers and reduce algal blooms; in the medium connectivity scenario, the intent is for the e-flows to permanently maintain the longitudinal hydrological connectivity of rivers that are isolated into several ponds by means of weirs, in order to ensure the exchange of material, energy, and information in rivers; and in the low connectivity scenario, the intent is for the e-flows to intermittently connect isolated ponds every few days (which is designed to further reduce e-flows), The proposed methods have been used in Shiwuli River, China, to demonstrate their effectiveness, The new methods can offer more precise and realistic e-flow results and can effectively direct the construction and management of e-flow supply projects,
文摘A theoretical model of river channel changes is presented, which shows some nonequilibrium thermodynamic criteria of a river channel to bedding and equilibrium.
基金Supported by National Key Basic Research Program of China (No. 2005CB422304)National Natural Science Foundation of China (No.40872167)
文摘The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments have been fulfilled to evaluate the effect of the project on the natural environment. To fill the gap of investigations, a study on flood and suspended sediment transportation and channel changing along the distributary channel of the Huanghe (Yellow) River was conducted during the WSDR project period in 2007. The lower channel was scoured rapidly and the channel became unobstructed gradually several days after the flood peak water was discharged from the Xiaolangdi Reservoir. Within four days after the flood peak at 3 000 m3/s entered the distributary, the channel in the river mouth area was eroded quickly. Both the mean values of area and depth of the main channel were tripled, and the maximum flood carrying capacity increased to 5 500 m3/s or more. Then, the river channel was silted anew in a very short time after completion of the WSDR. Favored by the WSDR project, the fiver status in April 2008 became better than that of the year before. The adjustment ranges of main channel parameters were about 30%, 10%, and 10% at sections C2, Q4, and Q7, respectively. The process of rapid erosion-deposition was more active 15 km away in the channel from the fiver mouth due to the marine influence. It is reasonable for discharging sediment at concentration peak from Xiaolangdi Reservoir at the end of the flood peak. As a result, the sediment peak reached the river mouth about two days later than that of the water current. In addition, the WSDR project has improved the development of the estuarine wetland. Wetland vegetation planted along the river banks restrained the water flow as a strainer and improved the main channel stability. It is suggested to draw water at mean rate of 150 m3/s from the Huanghe River during flood periods, because at the rate the water in the wetland would be stored and replenished in balance. Moreover, we believe that cropland on the river shoal of the lower Huanghe River should be replaced by wetland. These activities should achieve the Huanghe River management strategy of "To concentrate flow to scour sediment, stabilize the main channel, and regulate water and sediment".
基金Supported by the Financial from the U.S.Army Corps of Engineers-Lower Mississippi Valley Division,Vicksburg,Mississippi,U.S.A.
文摘The lower Mississippi River(LMR) has been heavily modified for multiple human purposes such as navigation, flood control, and bank stabilization. However, the LMR simultaneously supports a diverse fish fauna that includes recreational and commercial fisheries. Due to river training and diversion structures constructed during the past 80 years, the historic characteristics of the LMR have been drastically altered and have likely influenced fishes and fisheries in the system. One common restoration measure used throughout the LMR has been to "notch" wing-dike structures that close secondary(side) river channels. Dike notching allows year-round flows through secondary channels, which enhances habitat diversity and promotes biological productivity at the ecosystem scale. Although notching is presumed good for LMR fishes and other biota, few studies have examined its effects on fish assemblages. In this study, fish assemblages were sampled at seven LMR secondary channels spanning from river kilometer(rkm) 628(Louisiana-Mississippi, U.S.A.) upstream to rkm 1504(Missouri-Kentucky, U.S.A.). Four secondary channels were termed "permanent"(i.e.,with notched dikes) while three secondary channels were termed "temporary"(i.e., without notched dikes).Fishes were sampled by boat-mounted electrofishing conducted during falling and low stages from1995—1997. Fish assemblages differed between permanent and temporary secondary channels, and varied somewhat between falling and low stages. Gizzard shad(Dorosoma cepedianum), threadfin shad(D. petenense), and white bass(Morone chrysops) demonstrated consistent preferences for low-current conditions associated with temporary secondary channels. Conversely, blue catfish(Ictalurus furcatus), flathead catfish(Pylodictis olivaris), and freshwater drum(Aplodinotus grunniens) were more associated with permanent secondary channels. Future restoration strategies in the LMR should consider dike notching and resultant maintenance of permanent secondary channels in selected river reaches. However, temporary secondary channels also contain unique fish species, and also appear to be important sites of riverine primary production. Restoration strategies should consider a balance of both secondary channel types, which should support the greatest biodiversity for the LMR ecosystem.
文摘There are three major types of tidal channels along the coast of the Huanghe (Yellow) River Delta: tidal inlets, tidal creeks, and tidal channels developed from abandoned river channels. The tidal inlets develop mainly in two areas with weak erosion and barrier islands. The tidal channels formed from abandoned river channels mainly developed in the area of the new delta lobes formed since 1934. Tidal creeks developed in the intertidal zone and distributed along almost all parts of the Huanghe River Delta coast, but their scales and features are different.
文摘On September 10, 2015, unprecedented flood was occurred in Kinugawa River basin located on eastern Japan. It inundated 40 km2 of flood plain in Joso city, Ibaraki Prefecture, and more than 4000 people there called for help despite supposedly having sufficient time to evacuate. Some said that small initial flood before main severe flood arrived made them make a mistake in deciding whether to evacuate or stay there, despite having to actually evacuate in reality. This study focused on flood behaviour in this area, in particular, the effect of a small drainage channel lying on the flood plain which caused fast flood diffusion in case of occurring huge overflowing. Field investigations starting on time of the disaster with high-resolution positioning system were conducted to obtain spatial maps of flood depth and height. For appropriate modelling of the effect of small channel, we applied simulation model coupling 1-dimensional (1D) and 2-dimensional (2D) hydraulic scheme on the field and compared results from the 1D/2D coupled model and model without 1D scheme. The models provided information that the flood could reach 4 hours earlier to the city central of Joso city comparing in case of model without 1D scheme. The water depth rose irregularly and it was more confusing and difficult for the victims to make appropriate evacuation act.
文摘Flood is occurring more frequently in Kuching nowadays due to the impact of climate change and rapid urbanization. The only discharge outlet for Sarawak River Basin currently is at Kuching Barrage and Shiplock. Sarawak State Government had decided to build Matang Bypass Channel from Sarawak River’s “Oxbow” to Batang Salak River for mitigating the flooding issues within Sarawak River Basin. Matang Bypass Channel had a bottom width of 250 m, 500 m reserve width and 8 Km in length. Flow behaviour with two discharge outlets during low tides are unknown yet. Therefore, this research is carried out to study Sarawak River flow behaviour after construction of Matang Bypass Channel using InfoWorks River Simulation (RS). Rainfall data used is January 2018. Four scenarios investigated are 1) Open two gates at Matang Bypass Channel opens and all gates at Kuching Barrage, 2) Open all gates at Matang Bypass Channel and Kuching Barrage, 3) Open gates at Matang Bypass Channel, but close all gates at Kuching Barrage, 4) Close all gates at Matang Bypass Channel, but open all gates at Kuching Barrage. Results revealed that when water gates are opened, sea water has the potential to backflow into Sarawak River basin through Kuching Barrage since sea level at Kuching Barrage discharge outlet is always 0.5 m higher than Matang Bypass Channel discharge outlet. When the gates at Matang Bypass Channel are fully opened and Kuching Barrage are closed, Kuching Barrage will retain the excess water and the river water will only be discharged into ocean through Matang Bypass Channel. In contrast, as the gates at Matang Bypass Channel are closed and at Kuching Barrage are fully opened, Matang Bypass Channel will store the excess water and river water will be discharged through Kuching Barrage alone.
文摘An improved divided channel method has been proposed by modelling a parameter using the function of depth ratio for a multi-stage compound channel. Experimental data suggest that as the flow depth increases over the second stage floodplain, fractional contribution of the main channel and first stage floodplain under bankfull height plays a pivotal role in shear layer and momentum distribution. Therefore, a new mathematical model has been suggested for estimating the stage-discharge relationship for staged channels of more than one floodplain using the 1D technique of overall roughness correction. .