In order to evaluate objectively and accurately the integrity, safety and operating conditions in real time for the Nanjing Yangtze River Bridge, a large structural safety monitoring system was described. The monitori...In order to evaluate objectively and accurately the integrity, safety and operating conditions in real time for the Nanjing Yangtze River Bridge, a large structural safety monitoring system was described. The monitoring system is composed of three parts: sensor system, signal sampling and processing system, and safety monitoring and assessment system. Combining theoretical analysis with measured data analysis, main monitoring contents and layout of measuring points were determined. The vibration response monitoring was significantly investigated. The main contents of safety monitoring on vibration response monitoring are vibration of the main body of the Nanjing Yangtze river bridge, collision avoidance of the bridge piers, vibration of girders on high piers for the bridge approach and earthquake. As a field laboratory, the safety monitorying system also provides information to investigate the unknown and indeterminate problems on bridge structures and specific environment around bridges.展开更多
The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper...The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper, a finite element method (FEM) model is set up to study the effects of concrete differential aging time on the construction phases of the Fenghua River Bridge by calculating the vertical displacement of the folding segment of the middle span and the longitudinal bending moment of Pier 12#. In the model, the girders are classified into 150 changing sections based on the desgn scheme, and their construction is to be carried in 16 phases respectively to build 12 blocks connected by a side folding segment and a middle folding segment, covered with a second dead load and in completion for 20 years. It is found that the internal forces and deformations of the concrete structures at the aging time of 60 d are quite different from those of 0 d aging time while the behaviors of the structures of 120 d aging time is nearly the same as those of 60 d aging time― the differences are so small that can be neglected, suggesting that the creep develops obviously about one month after the cement is hardened and the development fades later on.展开更多
Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge de...Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.展开更多
Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technica...Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technically mature besides beautiful appearance. Straight web plates of the steel box girder in longitudinal direction are proposed in order to ensure the integrity of the steel box girder, and to keep the stress of the steel box girder continuous in the middle pylon, as well as to reduce the gradient of the middle pylon columns. The cross section of the box girder has one box with three cells. Solid-web diaphragm plate with good integrity and high torsional stiffness is adopted. The lifting lugs are utilized in the anchors of suspender cable. In this paper, selection of the cross section of the steel box girder, the general structure design, local structure design and main structure calculation results of Taizhou Yangtze River Bridge are introduced emphatically.展开更多
After the anti-collision facility construction of Wanzhou Yangtze River Highway Bridge, the conditions of navigation in bridge area are complex. In order to study the navigation conditions of the reach and layout opti...After the anti-collision facility construction of Wanzhou Yangtze River Highway Bridge, the conditions of navigation in bridge area are complex. In order to study the navigation conditions of the reach and layout optimization measures, ensuring the safety of the ship navigation test has been carried out on the ship model navigation in the bridge area. According to the requirements of the maximum safety limit of the ship model test, the paper puts forward the best route, the control method and the difficulty of navigation through the analysis of the test results, and finally gives the recommendations and suggestions.展开更多
文摘In order to evaluate objectively and accurately the integrity, safety and operating conditions in real time for the Nanjing Yangtze River Bridge, a large structural safety monitoring system was described. The monitoring system is composed of three parts: sensor system, signal sampling and processing system, and safety monitoring and assessment system. Combining theoretical analysis with measured data analysis, main monitoring contents and layout of measuring points were determined. The vibration response monitoring was significantly investigated. The main contents of safety monitoring on vibration response monitoring are vibration of the main body of the Nanjing Yangtze river bridge, collision avoidance of the bridge piers, vibration of girders on high piers for the bridge approach and earthquake. As a field laboratory, the safety monitorying system also provides information to investigate the unknown and indeterminate problems on bridge structures and specific environment around bridges.
文摘The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper, a finite element method (FEM) model is set up to study the effects of concrete differential aging time on the construction phases of the Fenghua River Bridge by calculating the vertical displacement of the folding segment of the middle span and the longitudinal bending moment of Pier 12#. In the model, the girders are classified into 150 changing sections based on the desgn scheme, and their construction is to be carried in 16 phases respectively to build 12 blocks connected by a side folding segment and a middle folding segment, covered with a second dead load and in completion for 20 years. It is found that the internal forces and deformations of the concrete structures at the aging time of 60 d are quite different from those of 0 d aging time while the behaviors of the structures of 120 d aging time is nearly the same as those of 60 d aging time― the differences are so small that can be neglected, suggesting that the creep develops obviously about one month after the cement is hardened and the development fades later on.
文摘Changqing Yellow River Super-long Bridge of Zhengzhou-Ji'nan HSR is a partial cable-stayed bridge with concrete main girder and a unit length of 1,080 m.Studies are carried out on the key technologies of bridge design,and the main conclusions are as follows:The whole unit adopts the supporting system of tower pier consolidation and tower-beam separation,and each pier is provided with seismic mitigation and isolation bearing;shaped-steel reinforced concrete bridge tower is adopted to bring into full play the tensile performance of steel and the compressive performance of concrete,and avoid the construction challenges of setting up multi-layer and multi-stirrup reinforcement while improving the bearing capacity of section;a new type of double-side and bi-directional anti-skid anchorage device is adopted for the cable saddle of wire divider pipe in order to withstand the unbalanced cable force,and verify the reliability of the anti-skid anchorage device by solid model test;and large-segment cantilever pouring design is adopted for the main girder with a maximum segment length of 8 m to effectively shorten the construction period of the bridge.
基金National Science and Technology Support Program of China ( No. 2009BAG15B01) Key Programs for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-170)
文摘Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technically mature besides beautiful appearance. Straight web plates of the steel box girder in longitudinal direction are proposed in order to ensure the integrity of the steel box girder, and to keep the stress of the steel box girder continuous in the middle pylon, as well as to reduce the gradient of the middle pylon columns. The cross section of the box girder has one box with three cells. Solid-web diaphragm plate with good integrity and high torsional stiffness is adopted. The lifting lugs are utilized in the anchors of suspender cable. In this paper, selection of the cross section of the steel box girder, the general structure design, local structure design and main structure calculation results of Taizhou Yangtze River Bridge are introduced emphatically.
文摘After the anti-collision facility construction of Wanzhou Yangtze River Highway Bridge, the conditions of navigation in bridge area are complex. In order to study the navigation conditions of the reach and layout optimization measures, ensuring the safety of the ship navigation test has been carried out on the ship model navigation in the bridge area. According to the requirements of the maximum safety limit of the ship model test, the paper puts forward the best route, the control method and the difficulty of navigation through the analysis of the test results, and finally gives the recommendations and suggestions.