River cutoff works have been implemented on Lower Jingjiang section for 30 years. Engineering practices have shown that channel straightening has been the river regulation measure for the permanent control of the mean...River cutoff works have been implemented on Lower Jingjiang section for 30 years. Engineering practices have shown that channel straightening has been the river regulation measure for the permanent control of the meandering Lower Jingjiang section. River cutoff have been carried out in accordance with the evolution property of meandering rivers and these works have brought about expected benefits. It has also been noted that certain aspects in river cutoff had not been fully understood. River cutoff is a dynamic engineering. River channel evolution properties shall be fully understood so as to adroitly guide actions according to circumstances in cutoff works. In addition, river channel evolution observation and engineering effectiveness monitoring should be strengthened with a view to update the designs. The diversion canals for channel shortening are of great importance that will account for the success or failure of river cutoff works. The newly formed river channels and the river regime control works on the adjacent upper and lower reaches are guarantees for river cutoff works to be brought into play in the long run.展开更多
To understand the non-equilibrium morphological adjustment of a river in response to environmental changes,it is essential to(i)accurately identify how past conditions of water and sediment have impacted current morph...To understand the non-equilibrium morphological adjustment of a river in response to environmental changes,it is essential to(i)accurately identify how past conditions of water and sediment have impacted current morphological adjustment of the river,and(ii)establish a corresponding simulation for non-equilibrium conditions.Based on discharge and suspended sediment concentration(SSC)as well as 82 cross-sectional data items for the Huayuankou-Lijin reach of the Lower Yellow River in the period 1965-2015,the process of adjustment of the geometry of the main channel(area,width,depth,and geomorphic coefficient),and its responses to changes in discharge and SSC for different reaches are statistically analyzed.Following this,a delayed response model(DRM)of the geometry of the main channel subjected to variations in discharge and SSC is established using a multi-step analytical model,with the discharge and SSC as the main controlling factors.The results show that the area,width,and depth of the main channel decreased initially,then increased,decreased again,and finally increased again.These features of the geometry of the channel were positively correlated with the 4-year moving average discharge and negatively with the 4-year moving average SSC.The geomorphic coefficient for the Huayuankou-Sunkou reach exhibited a trend of decrease,whereas that of the Sunkou-Lijin reach decreased initially,then increased,decreased again,and finally increased again.Except for the Huayuankou-Gaocun reach in 1965-1999,the coefficient was negatively correlated with the 4-year moving average discharge and positively with SSC.The simulated values of the morphological parameters of the main channel for all sub-reaches obtained using the DRM agreed well with the measured values.This indicates that the DRM can be used to simulate the process of response of the cross-sectional geometry of the main channel to variations in the water and sediment.The results of the model show that the adjustment of the geometry of the main channel was affected by the discharge and the SSC at present(30%)as well as for the previous 7 years(70%).The proposed model offers insights into the mechanism whereby past water and sediment influence the current morphological adjustment of the river,and provides an effective method for predicting the magnitude and trend of the geometry of the main channel under different flow conditions.展开更多
文摘River cutoff works have been implemented on Lower Jingjiang section for 30 years. Engineering practices have shown that channel straightening has been the river regulation measure for the permanent control of the meandering Lower Jingjiang section. River cutoff have been carried out in accordance with the evolution property of meandering rivers and these works have brought about expected benefits. It has also been noted that certain aspects in river cutoff had not been fully understood. River cutoff is a dynamic engineering. River channel evolution properties shall be fully understood so as to adroitly guide actions according to circumstances in cutoff works. In addition, river channel evolution observation and engineering effectiveness monitoring should be strengthened with a view to update the designs. The diversion canals for channel shortening are of great importance that will account for the success or failure of river cutoff works. The newly formed river channels and the river regime control works on the adjacent upper and lower reaches are guarantees for river cutoff works to be brought into play in the long run.
基金Key Program of National Natural Science Foundation of China,No.51639005Central Public-interest Scientific Institution Basal Research Fund of China,No.CKSF2019214/HL,No.CKSF2019411/HL。
文摘To understand the non-equilibrium morphological adjustment of a river in response to environmental changes,it is essential to(i)accurately identify how past conditions of water and sediment have impacted current morphological adjustment of the river,and(ii)establish a corresponding simulation for non-equilibrium conditions.Based on discharge and suspended sediment concentration(SSC)as well as 82 cross-sectional data items for the Huayuankou-Lijin reach of the Lower Yellow River in the period 1965-2015,the process of adjustment of the geometry of the main channel(area,width,depth,and geomorphic coefficient),and its responses to changes in discharge and SSC for different reaches are statistically analyzed.Following this,a delayed response model(DRM)of the geometry of the main channel subjected to variations in discharge and SSC is established using a multi-step analytical model,with the discharge and SSC as the main controlling factors.The results show that the area,width,and depth of the main channel decreased initially,then increased,decreased again,and finally increased again.These features of the geometry of the channel were positively correlated with the 4-year moving average discharge and negatively with the 4-year moving average SSC.The geomorphic coefficient for the Huayuankou-Sunkou reach exhibited a trend of decrease,whereas that of the Sunkou-Lijin reach decreased initially,then increased,decreased again,and finally increased again.Except for the Huayuankou-Gaocun reach in 1965-1999,the coefficient was negatively correlated with the 4-year moving average discharge and positively with SSC.The simulated values of the morphological parameters of the main channel for all sub-reaches obtained using the DRM agreed well with the measured values.This indicates that the DRM can be used to simulate the process of response of the cross-sectional geometry of the main channel to variations in the water and sediment.The results of the model show that the adjustment of the geometry of the main channel was affected by the discharge and the SSC at present(30%)as well as for the previous 7 years(70%).The proposed model offers insights into the mechanism whereby past water and sediment influence the current morphological adjustment of the river,and provides an effective method for predicting the magnitude and trend of the geometry of the main channel under different flow conditions.