期刊文献+
共找到3,037篇文章
< 1 2 152 >
每页显示 20 50 100
Construction land expansion and influencing factors of typical river valley cities in Northeast China: Taking Jilin City as an example
1
作者 LI Ruiqi LI Hong YIN Jingbo 《Global Geology》 2023年第3期189-198,共10页
Jilin City is a typical river valley city in Northeast China.In this paper,the authors studied the spatial and temporal expansion characteristics of the built-up areas in Jilin City from 1990 to 2020 using the analysi... Jilin City is a typical river valley city in Northeast China.In this paper,the authors studied the spatial and temporal expansion characteristics of the built-up areas in Jilin City from 1990 to 2020 using the analysis of expansion speed and strength,fractal dimension,barycenter coordinate transfer index and sector analysis.The ultimate-goal is to analyze the driving and restrictive factors that affect the spatial expansion of river valley cities.The results indicate that(1)the expansion speed of urban land in Jilin City has been re-latively slow in the past 30 years,while only slightly faster in 2010–2020;(2)in the spatial dimension,Jilin City mainly expanded to the south,then to the west,and extensive expansion has resulted in complex mor-phology with little stability and compactness;(3)the expansion is affected by multiple factors,of which the positive factor is industrial development,while the restrictive factors include natural factors,population loss,etc.This study provides a case for the formulation of land use policies and land space planning in river valley cities. 展开更多
关键词 river valley city expansion of construction land influencing factors Jilin City
下载PDF
Analysis of Construction Technology for River Regulation and Bank Protection in Water Conservancy Projects
2
作者 Zheng Yuan 《Journal of World Architecture》 2023年第3期73-76,共4页
There are many problems and deficiencies in traditional bank protection methods,which cause certain damage to the ecological environment of river channels.Recently,the issues of river management,improving bank protect... There are many problems and deficiencies in traditional bank protection methods,which cause certain damage to the ecological environment of river channels.Recently,the issues of river management,improving bank protection technology,formulating reasonable construction measures,and ensuring the smooth and efficient implementation of construction have been receiving increasing attention. 展开更多
关键词 Water conservancy engineering river management Bank protection construction technique
下载PDF
Evaluation of Animal and Plant Resources Status Quo after the Reservoir Construction in Turks River and Protection Measures 被引量:2
3
作者 Tuerxunayi.Aibibulla Nuerbayi.Abudoushalike Adilijiang.Kuerban 《Meteorological and Environmental Research》 CAS 2011年第6期96-98,共3页
[Objective] The aim was to assess the status quo of animal and plant resources in Turks River after the construction of the reservoir.[Method] Through field investigation,document check and sample identification,the d... [Objective] The aim was to assess the status quo of animal and plant resources in Turks River after the construction of the reservoir.[Method] Through field investigation,document check and sample identification,the distribution of animal and plants resources in Turks River after the construction of the reservoir was studied and corresponding protection measures were proposed.[Result] Under the influence of reservoir,there were fifteen types of rare animals,one species of national primary protected animals,seven species of national secondary protected animals,one species of provincial primary protected animals,six species of provincial secondary protected animals;there were twenty one species of rare plants,including two species of national secondary plant,five species of national tertiary protected animals,six types of Xinjiang primary protected plants,two species of Xinjiang secondary protected plants and six types of tertiary protected plants in Xinjiang.Protective policies for the land ecological environment were proposed,including corresponding compensation according to the rules and policies of government,plans being formulated for rare species protection,construction of natural reserves and artificial breeding base,usage of the environment in the reservoir and changes of ecological situation etc.[Conclusion] The study provided basis for the protection of animal and plants resources in Turks. 展开更多
关键词 Turks river Reservoir construction Animal and plant resources China
下载PDF
Influence of concrete differential aging time on the construction phases analysis of the Fenghua River Bridge 被引量:1
4
作者 余报楚 《Journal of Chongqing University》 CAS 2004年第2期34-37,共4页
The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper... The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper, a finite element method (FEM) model is set up to study the effects of concrete differential aging time on the construction phases of the Fenghua River Bridge by calculating the vertical displacement of the folding segment of the middle span and the longitudinal bending moment of Pier 12#. In the model, the girders are classified into 150 changing sections based on the desgn scheme, and their construction is to be carried in 16 phases respectively to build 12 blocks connected by a side folding segment and a middle folding segment, covered with a second dead load and in completion for 20 years. It is found that the internal forces and deformations of the concrete structures at the aging time of 60 d are quite different from those of 0 d aging time while the behaviors of the structures of 120 d aging time is nearly the same as those of 60 d aging time― the differences are so small that can be neglected, suggesting that the creep develops obviously about one month after the cement is hardened and the development fades later on. 展开更多
关键词 the Fenghua river Bridge prepress concrete successional box girder cantilever construction construction control concrete differential aging time
下载PDF
Restoration or Rehabilitation of the Faleme River Affected by Mining Activities: What Methods?
5
作者 Mor Diop Ibrahima Mall +3 位作者 Elhadji Mamadou Sonko Tidiane Diop Birane Niane Cheikh Mbow 《Journal of Water Resource and Protection》 CAS 2024年第4期233-263,共31页
The Faleme River, a West Africa long transboundary stream (625 km) and abundant flow (>1100 million m<sup>3</sup>) is affected by severe erosion because of mining activities that takes place throughout ... The Faleme River, a West Africa long transboundary stream (625 km) and abundant flow (>1100 million m<sup>3</sup>) is affected by severe erosion because of mining activities that takes place throughout the riverbed. To preserve this important watercourse and ensure the sustainability of its services, selecting and implementing appropriates restorations techniques is vital. In this context, the purpose of this paper was to present an overview of the actions and techniques that can be implemented for the restoration/rehabilitation of the Faleme. The methodological approach includes field investigation, water sampling, literature review with cases studies and SWOT analysis of the four methods presented: river dredging, constructed wetlands, floating treatment wetlands and chemical precipitation (coagulation and flocculation). The study confirmed the pollution of the river by suspended solids (TSS > 1100 mg/L) and heavy metals such as iron, zinc, aluminium, and arsenic. For the restoration methods, it was illustrated through description of their mode of operation and through some case studies presented, that all the four methods have proven their effectiveness in treating rivers but have differences in their costs, their sustainability (detrimental to living organisms or causing a second pollution) and social acceptance. They also have weaknesses and issues that must be addressed to ensure success of rehabilitation. For the case of the Faleme river, after analysis, floating treatment wetlands are highly recommended for their low cost, good removal efficiency if the vulnerability of the raft and buoyancy to strong waves and flow is under control. 展开更多
关键词 Faleme river river Restoration constructed Wetlands DREDGING Floating Treatment Wetlands COAGULATION-FLOCCULATION
下载PDF
AREAL DIFFERENTIATION AND CONSTRUCTION OF OASIS AGRICULTURAL ECOSYSTEM IN THE SHIYANG RIVER BASIN
6
作者 张维祥 梁智睿 《Chinese Geographical Science》 SCIE CSCD 1993年第4期71-78,共8页
On the basis of the study on areal differentiation of the natural environment of oasis agriculture ecosystems in the Shiyang River Basin, this paper comparatively analyzes the natural productivities, water economic be... On the basis of the study on areal differentiation of the natural environment of oasis agriculture ecosystems in the Shiyang River Basin, this paper comparatively analyzes the natural productivities, water economic benefits, production efficiency, ecological stabilities and developmental conditions of the Wuwei Oasis agricultural ecosystem in the middle reaches of the river basin and the Minqin Oasis agricultural ecosystem in the lower reaches. Under a same management level and investment of . material and energy, primary productiveness and economic benefits of the former are higher than those of the latter. Construction directions of Wuwei and Minqin oases should be different in order to alleviate the water- use contradiction between the middle and lower reaches. The construction objective of Wuwei Oasis should be efficient irrigated farming production system and Minqin Oasis should become a mixed forestry-pastoral-farming ecosystem taking ecological protection as its major function. 展开更多
关键词 OASIS AGRICULTURAL ECOSYSTEM areal DIFFERENTIATION OASIS construction the Shiyang river Basin
下载PDF
Connotations and Evaluation System of Urban Eco-River Construction
7
作者 CHENG Nanning YANG Haiyan +1 位作者 HUANG Li HU Wei 《Journal of Landscape Research》 2012年第10期27-29,共3页
Eco-river construction is an important part of the urban river renovation, and also a hot research topic for the present river renovation. From the perspective of functional features of urban rivers, connotations of e... Eco-river construction is an important part of the urban river renovation, and also a hot research topic for the present river renovation. From the perspective of functional features of urban rivers, connotations of ecological river construction were further explored, evaluation index system was established on the basis of objective layer, criterion layer and index layer, so as to provide theoretical guidance and technical references for the ecological construction of urban rivers. 展开更多
关键词 Eco-river river construction CONNOTATION EVALUATION system
下载PDF
Heritage Corridor Construction:New Idea for Protection of Heritage along the Right Bank of the Yalu River
8
作者 TIAN Xiaoshu 《Journal of Landscape Research》 2016年第6期107-110,114,共5页
This paper analyzed feasibility,mode,and significance of heritage corridor construction along the right bank of the Yalu River.It stated that the region along the right bank of the Yalu River conforms to characteristi... This paper analyzed feasibility,mode,and significance of heritage corridor construction along the right bank of the Yalu River.It stated that the region along the right bank of the Yalu River conforms to characteristics of heritage corridor and is suitable for heritage corridor theory.For Liaoning and Jilin provinces integrating their tourism into the One Belt and One Road strategy,and promoting harmonious use of regional tourist resources,vigorous development of tourism,and targeted poverty alleviation through tourism,the heritage corridor construction is of profound significance. 展开更多
关键词 Right bank of the Yalu river HERITAGE Heritage corridor construction Protection and use
下载PDF
The Second Large Hydropower Project on Lancana River Starts Construction
9
《Electricity》 1997年第3期7-7,共1页
关键词 PROJECT The Second Large Hydropower Project on Lancana river Starts construction
下载PDF
Activities of Urease and Phosphatase in Integrated Vertical Flow Constructed Wetland and Purification Effect of Black and Malodorous River 被引量:3
10
作者 崔伟 张勇 黄民生 《Agricultural Science & Technology》 CAS 2011年第8期1186-1190,共5页
[Objective]The activities of urease and phosphatase in integrated vertical flow constructed wetland and purification effect of black and malodorous river were studied.[Method]Honeycomb stone and soft filler were used ... [Objective]The activities of urease and phosphatase in integrated vertical flow constructed wetland and purification effect of black and malodorous river were studied.[Method]Honeycomb stone and soft filler were used as matrix,the biological grid integrated vertical flow constructed wetland system was built to strengthen treatment for black and malodorous river,and the activities of urease and phosphatase of two fillers in different functional areas of constructed wetland were tested to study the film formation property of two fillers in different functional areas.[Result]Both urease and phosphatase activities on biofilm of soft filler were significantly higher than on biofilm of honeycomb stone filler;indicating that choosing soft filler was more advantageous to the growth of biofilm;and urease activity had significant correlation with total nitrogen removal rate,while phosphatase activity had no significant correlation with total phosphorus removal rate.[Conclusion]This study provided evidences for utilizing the activities of urease and phosphatase to evaluate the purification effect of black and malodorous river and choose appropriate filler. 展开更多
关键词 Integrated vertical flow constructed wetland UREASE PHOSPHATASE Black and malodorous river Purification effect
下载PDF
Performance of Subsurface Constructed Wetland in River Rehabilitation 被引量:33
11
作者 王万宾 段亮 田自强 《Agricultural Science & Technology》 CAS 2009年第2期149-153,共5页
[ Objective] This study was to research the treatment effect of different media in undercurrent wetland on contamination, so as to pro- vide reference for rehabitating water body of river along small towns. [ Method ]... [ Objective] This study was to research the treatment effect of different media in undercurrent wetland on contamination, so as to pro- vide reference for rehabitating water body of river along small towns. [ Method ] Three different media of gravel, cobblestone and shale were used to rehabilitate water quality of contaminated river. [ Result ] Gravel, cobblestone and shale all performed well in removing TN, TP and CODw,, in contaminated water, of which gravel stuffed undercurrent wetland run best, averagely removing 49.4% TN, 34.7% and 48. 5% COD~, respectively. [ Conclusion] Undercurrent constructed wetland can effectively improve the water quality of contaminated river, and it is cheaper in cost and simpler in operation, thus suitable for generalizing in small towns of China. 展开更多
关键词 Undercurrent constructed wetland Contaminated river GRAVEL COBBLESTONE SHALE
下载PDF
Treatment Efficiencies of Constructed Wetlands for Eutrophic Landscape River Water 被引量:51
12
作者 HE Sheng-Bing YAN Li KONG Hai-Nan LIU Zhi-Ming WU De-Yi HU Zhan-Bo 《Pedosphere》 SCIE CAS CSCD 2007年第4期522-528,共7页
The efficiencies of two types of constructed wetlands for the treatment of low-concentration polluted eutrophic land- scape river water were studied in the western section of the Qingyuan River at the Minhang campus o... The efficiencies of two types of constructed wetlands for the treatment of low-concentration polluted eutrophic land- scape river water were studied in the western section of the Qingyuan River at the Minhang campus of Shanghai Jiaotong University.The first wetland was a single-stage system using gravel as a filtration medium,and the second was a three- stage system filled with combinations of gravel,zeolite,and fly ash.Results from parallel operations of the wetlands showed that the three-stage constructed wetland could remove organics,nitrogen, and phosphorus successfully.At the same time,it could also decrease ammoniacal odour in the effluent.Compared to the single-stage constructed wetland,it had better nutrient removal efficiencies with a higher removal of 19.37%-65.27% for total phosphorus (TP) and 21.56%- 62.94% for total nitrogen (TN),respectively,during the operation period of 14 weeks.In terms of removal of chemical oxygen demand (COD), turbidity,and blue-green algae,these two wetland systems had equivalent performances.It was also found that in the western section of the test river,in which the two constructed wetlands were located, the water quality was much better than that in the eastern and middle sections without constructed wetland because COD,TN, and TP were all in a relatively lower level and the eutrophication could be prevented completely in the western section. 展开更多
关键词 constructed wetland eutrophic landscape river water treatment
下载PDF
Efficiency and mechanism of pretreatment on water supply in reservoirs of Yellow River by subsurface constructed wetlands 被引量:1
13
作者 杨旭 于水利 +3 位作者 赵焱 严晓菊 修春海 王冬光 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2009年第5期652-655,共4页
In order to improve the source water quality of drinking water and mitigate the load of drinking water treatment plant, a pilot test was conducted with integrated horizontal flow constructed wetlands to pretreat the w... In order to improve the source water quality of drinking water and mitigate the load of drinking water treatment plant, a pilot test was conducted with integrated horizontal flow constructed wetlands to pretreat the water supply in the reservoirs of Yellow River. Resuhs show that under the hydraulic loading rate of 4 m^3/( m^2 · d), the average removal rates of chemical oxygen demand (COD), total nitrogen (TN), ammonium nitrogen ( NH4 ^+ - N), nitrate nitrogen ( NO3 ^- - N), nitrite - nitrogen ( NO2^ - - N) and total phosphorus (TP) in the horizontal flow constructed wetlands are 49. 68% , 53.01%, 48.48%, 53.61% , 62. 57% and 49. 56%, re- spectively. The study on purifying mechanism of the constructed wetlands indicates that the disposal of contamination by subsurface wetlands is the combined actions of physical chemistry, plants and microorganism. 展开更多
关键词 constructed wetland water supply in reservoirs of Yellow river PRETREATMENT efficiency and mechanism
下载PDF
Surface flow constructed wetland with composite plant bed for pretreatment of micro-polluted Yellow River raw water in China
14
作者 杨旭 于水利 +3 位作者 严晓菊 赵焱 修春海 张洪洋 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2008年第3期426-429,共4页
In order to investigate the feasibility of pretreating the micro-polluted Yellow River raw water by constructed wetland, an experiment was conducted using a surface flow constructed wetland with composite plant bed. T... In order to investigate the feasibility of pretreating the micro-polluted Yellow River raw water by constructed wetland, an experiment was conducted using a surface flow constructed wetland with composite plant bed. The contamination removal efficiency and their trends in the wetland treatment system were studied under different hydraulic loading rates(HLR). The contamination removal efficiencies were compared according to the seasonal change under optimum HLR. The result shows that in the same season, under different hydraulic loadings ranging from 2 to 6 m3/(m2·d) at the same period, the best HLR is 4 m3/(m2·d) in the experimental system. The average removal rates of COD, TN, ammoniacal nitrogen(NH4+-N), and TP in the constructed wetland are 38.37%, 45.97%, 39.86% and 41.69%, respectively. According to China Standard for Surface Water Resources (GB3838-2002), mean effluent of COD, TN, NH4+-N and TP can nearly reach Grade Ⅲ, GradeⅤ, GradeⅠand GradeⅠ, respectively. Furthermore, treatment efficiency of the system in summer is obvious higher than that in other seasons. The expenditure of constructing the constructed wetland with the average treating capacity of 176 m3/d and lifetime of 20 years is 17075.00 RMB. The average disposal cost is summed up to 0.17 RMB/m3, which shows that the pretreatment of the micro-polluted Yellow River raw water by constructed wetland is feasible. 展开更多
关键词 constructed wetland composite plant bed surface flow PRETREATMENT micro-polluted Yellow river raw Water
下载PDF
Purification Effect of Constructed Wetlands for Treating River Water Flowing from Phosphate Mine Areas into Fuxian Lake
15
作者 WANG Lin KE Fan +2 位作者 FENG Mu-hua SUN Pei-shi ZHU Hui-xian 《Meteorological and Environmental Research》 2012年第7期38-41,共4页
[ Objective] The study aimed at discussing the purification effect of constructed wetlands for treating river water flowing from phosphate mine areas into Fuxian Lake. [Method] The running parameters of the constructe... [ Objective] The study aimed at discussing the purification effect of constructed wetlands for treating river water flowing from phosphate mine areas into Fuxian Lake. [Method] The running parameters of the constructed wetlands were investigated for one year, and the purification effect of the constructed wetlands for treating the sewage from phosphate mine areas was analyzed. [Result] With the aid of the constructed wet- land, the average removal rates of total nitrogen (TN), total phosphorus (TP) and CODcr were 52%, 32% and 54%, and the removal effects were best when the designed hydraulic load was 0.67 m3/( m2 · d). Running stably for six years, the constructed wetlands had advantages of no power, low resistance and high removal rate. [ Conclusion] The constructed wetlands reduced the load of pollutants from phosphate mine areas into Fuxian Lake effectivelv, which Dlaved important roles in the Drotection of water aualitv of Fuxian Lake. 展开更多
关键词 Fuxian Lake Dongda river Phosphate removing constructed wetlands China
下载PDF
River Sand Characterization for Its Use in Concrete: A Revue
16
作者 Muhindo Wa Muhindo Abdias Manjia Marcelline Blanche +3 位作者 Ursula Joyce Pettang Nana Henry Fonbeyin Abanda Ngapgue François Pettang Chrispin 《Open Journal of Civil Engineering》 2023年第2期353-366,共14页
Despite the gradual professionalization of the construction sector as well as the abundance of sand mining sites offered by the North Kivu, Democratic Republic of Congo Region, ignorance of materials by local builders... Despite the gradual professionalization of the construction sector as well as the abundance of sand mining sites offered by the North Kivu, Democratic Republic of Congo Region, ignorance of materials by local builders persists. This is the case of quarries extracting river sand used to make concrete and mortar. However, the dosages of the various constituents are most often chosen on the basis of experience without any prior characterization of this material. This paper presents a comprehensive review of the characterization of river sand for its use in concrete in DRC. The origin and global use of river sand in construction are presented in percentage terms to highlight the importance of river sand as a construction material. The physical properties of river sand, including particle size distribution, bulk density, absolute density, and cleanliness are discussed in detail. The paper examines the effect of variations in river sand properties on concrete behavior, including density and compressive strength. Overall, this paper emphasizes the need to properly characterize river sand before using it in construction to ensure durable, high-quality structures. This will avoid the problems that are observed in particular a bad behavior of the coating on the walls;cracks and crumbling of the beams, lintels, posts and even the ruin of the structures. 展开更多
关键词 CHARACTERIZATION river Sand CONCRETE construction Material STRUCTURE
下载PDF
科技自立自强视域下国家创新体系效能建设与提升——以长三角区域为例 被引量:4
17
作者 赵菁奇 金露露 张文君 《华东经济管理》 CSSCI 北大核心 2024年第1期26-36,共11页
国家创新体系效能建设与提升对实现高水平科技自立自强至关重要。文章以长三角区域为例,运用VIKOR方法评价长三角区域创新体系的整体效能,以实现高水平科技自立自强为目标构建了区域创新体系效能评价模型。研究表明:长三角区域创新体系... 国家创新体系效能建设与提升对实现高水平科技自立自强至关重要。文章以长三角区域为例,运用VIKOR方法评价长三角区域创新体系的整体效能,以实现高水平科技自立自强为目标构建了区域创新体系效能评价模型。研究表明:长三角区域创新体系效能自2016年以来呈逐年递增趋势;影响各省市创新体系效能建设与提升的因素不同,R&D经费支出对上海市有影响,创新平台对江苏省影响最大,研发机构—企业协同创新影响浙江省创新体系效能,对安徽省而言则是高校—企业协同创新。文章为提升长三角区域创新体系效能找到了着力点,并对创新体系效能建设与提升提出政策建议。 展开更多
关键词 国家创新体系 长三角区域 效能建设与提升
下载PDF
长江经济带岩溶塌陷分布、成因及其对工程建设的影响 被引量:2
18
作者 戴建玲 雷明堂 +13 位作者 蒋小珍 ZHOU Wanfang 蒙彦 吴远斌 管振德 贾龙 殷仁朝 潘宗源 尹欧 陈英姿 杨涛 雷柱平 黄敬军 杨荣康 《中国地质》 CAS CSCD 北大核心 2024年第1期184-202,共19页
[研究目的]岩溶塌陷是长江经济带主要环境地质问题之一,开展长江经济带岩溶塌陷分布、成因及其对工程建设的影响研究,对长江经济带立体综合交通走廊建设和新型城镇化建设地质环境安全保障具有重要意义。[研究方法]本文系统梳理了长江经... [研究目的]岩溶塌陷是长江经济带主要环境地质问题之一,开展长江经济带岩溶塌陷分布、成因及其对工程建设的影响研究,对长江经济带立体综合交通走廊建设和新型城镇化建设地质环境安全保障具有重要意义。[研究方法]本文系统梳理了长江经济带岩溶塌陷研究成果,从岩溶环境特征、岩溶塌陷的成因类型和机制、发育及分布规律、对工程建设的影响及防控措施几个方面进行论述。[研究结果]研究结果表明,长江经济带岩溶塌陷易发区面积约25.4万km^(2),有记录的岩溶塌陷灾害2146处,矿山疏干排水、抽水、工程施工等是这一地区岩溶塌陷的主要诱发因素。长江经济带岩溶塌陷具有以下发育分布规律:一是具有区域性和地带性的分布特征;二是发育地层一般为均匀状纯碳酸盐岩,沿断裂破碎带、褶皱轴部裂隙发育带、可溶岩与非可溶岩接触地带等岩溶洞隙密集发育带分布;三是多发生在岩溶地下水强径流带、河流两岸等地下水位变化幅度大、水动力条件易发生急剧变化的地段;四是多发生在人类工程活动强烈的地区,塌陷的规模取决于人类活动的性质和强度。为了降低岩溶塌陷对工程建设和安全运营影响,本文同时提出了相关建议和对策。[结论]长江经济带岩溶塌陷分布广、危害大,高易发区内线性工程、重要城市群等规划建设应对这一环境地质问题引起重视,该研究成果可为长江经济带国土空间规划、地质灾害防治提供基础支撑和理论依据。 展开更多
关键词 岩溶塌陷 地质灾害 分布 成因 工程建设 地质调查工程 长江经济带
下载PDF
长江经济带生态文明建设水平变化特征与影响因素分析 被引量:1
19
作者 帅红 吴珍 李鑫 《湖南师范大学自然科学学报》 CAS 北大核心 2024年第2期52-61,共10页
长江经济带生态文明建设水平的高低关系到长江流域绿色协调发展能力,深刻影响我国生态安全格局。从生态经济、生态环境、生态社会3个层面构建评价指标体系,使用改进TOPSIS方法模型测算长江经济带生态文明建设水平,利用地理加权回归模型(... 长江经济带生态文明建设水平的高低关系到长江流域绿色协调发展能力,深刻影响我国生态安全格局。从生态经济、生态环境、生态社会3个层面构建评价指标体系,使用改进TOPSIS方法模型测算长江经济带生态文明建设水平,利用地理加权回归模型(GWR)分析其影响因子。研究结果表明:(1)在2011—2020年,长江经济带生态文明建设水平整体上呈上升趋势,由东向西沿轴线逐步扩散。(2)各子系统建设水平异质性特征显著,生态经济建设水平东部高于西部,以长江下游地区和省会城市为核心向周围辐射发展;生态环境水平在各省会及其周边城市增长较快,而工业发展型城市有不同程度的降低。生态社会水平高值区集中分布在江浙沪地区,低值区分散分布于中上游各省会城市。(3)地形、常住人口城镇化水平、第三产业占比、恩格尔系数、科技财政支出占比均正向影响了研究区生态文明建设水平,每万人在校大学生数对生态文明建设水平呈弱负相关。 展开更多
关键词 长江经济带 生态文明建设水平 基于熵权改进TOPSIS和GWR模型
下载PDF
内河中游区大型沉管隧道建造关键新技术——以襄阳鱼梁洲隧道为例
20
作者 王勇 徐国平 +5 位作者 李勇 刘明虎 孙晓伟 冯先导 任耀谱 许昱 《隧道建设(中英文)》 CSCD 北大核心 2024年第4期810-825,共16页
为解决内河中游区沉管隧道建造面临的河床冲刷强、强透水地层深厚、防洪要求高等问题,依托襄阳鱼梁洲沉管隧道工程,通过工程调研、理论分析、物模试验、数值模拟、现场测试等手段,对内河沉管隧道建造关键技术进行创新及应用,首次形成如... 为解决内河中游区沉管隧道建造面临的河床冲刷强、强透水地层深厚、防洪要求高等问题,依托襄阳鱼梁洲沉管隧道工程,通过工程调研、理论分析、物模试验、数值模拟、现场测试等手段,对内河沉管隧道建造关键技术进行创新及应用,首次形成如下创新成果:1)提出沉管隧道冲刷安全量化评价方法,给出沉管结构横向稳定性安全系数等5项评价指标及其评价标准体系,填补了沉管隧道防冲安全量化评价方法的空白;2)研发利用管周摩擦力抵抗止水带回弹力的摩擦止推型最终接头,解决常规陆域接头需设置大型圬工结构的问题;3)研发并量产可满足0.3 MPa外水压水密性、100年设计使用寿命的沉管接头外侧止水带国产化产品,其百年应力松弛衰减率仅25.5%,预测使用寿命144年,使中国实现沉管隧道全产业链技术的国产化;4)提出整体式管节不设后浇带全断面顺浇预制工法,实现沉管结构预制工效提高52%、结构接缝减少61%、浇筑裂缝减少60%;5)在内河沉管隧道中采用先铺卵石垫层基础,并研发出全浮式高精度先铺卵石基床整平船;6)研发应用沉管无焊接装配式端封门和柔性水袋压载水系统,可实现舾装设施的便捷循环使用和施工效率的提升。 展开更多
关键词 大型沉管隧道建造 内河中游区 襄阳鱼梁洲隧道 强冲刷 砂卵石
下载PDF
上一页 1 2 152 下一页 到第
使用帮助 返回顶部