The Three Gorges Project(TGP)has changed the flow-sediment process in the middle Yangtze River.For navigation purposes,there is an urgent need to study the changes of the river regime over a long-term period and the s...The Three Gorges Project(TGP)has changed the flow-sediment process in the middle Yangtze River.For navigation purposes,there is an urgent need to study the changes of the river regime over a long-term period and the shoal-channel evolution over different seasons since the completion of the TGP.Based on analysis of the measured data and the results of a two-dimensional mathematical model,the changes of the river regime and river bed evolution in the Yaojian reach downstream of the TGP were studied.Results show that a high sediment transport flux helps to keep the main flow in the North Branch,while a low sediment transport flux helps to keep the main flow in the South Branch.Thus,the main branch will not change in the near future because of the low sediment transport load.In this study,the flow-sediment process adjusted by the TGP was restored to the conditions before the TGP,and the river bed evolution under the adjusted and non-adjusted flow-sediment conditions was calculated.After the completion of the TGP,the reservoir storage accelerated the flood recession process and decreased the erosion by 11.9%under the flow-sediment conditions in 2010,and the deposition in the flood season decreased by 56.4%.展开更多
The waterway in the middle and lower reaches of the Yangtze River has long been known as the Golden Waterway and has served as an important link in the construction of the Yangtze River Economic Belt.Therefore,expandi...The waterway in the middle and lower reaches of the Yangtze River has long been known as the Golden Waterway and has served as an important link in the construction of the Yangtze River Economic Belt.Therefore,expanding its dimensions is a significant goal,particularly given the long-range cumulative erosion occurring downstream of the Three Gorges Dam (TGD),which has been concentrated in the dry river channel.With the regulation of the volume from upstream reservoirs and the TGD,the minimum discharge and water level of the river downstream are increasing,and creating favorable conditions for the increase of the depth of the waterway.The discharge compensation effect during the dry season offsets the decline in the water level of the river channel caused by the down-cutting of part of the riverbed,but the minimum navigable water level of the segment near the dam still shows a declining trend.In recent years,several waterway remediation projects have been implemented in the downstream reaches of the TGD and although the waterway depth and width have been increased,the channel dimensions are still insufficient in the Yichang-Anqing reach (with a total length of 1026 km),as compared to the upstream reservoir area and the deep water channel in the downstream tidal reaches.A comprehensive analysis of the water depth and the number and length of shoals in the waterway indicates that its dimensions can be increased to 4.5 m ×200 m and 6.0 m×200 m in the Yichang-Wuhan and Wuhan-Anqing reaches,respectively.This is also feasible given the remediation technologies currently available,but remediation projects need to be coordinated with those for flood prevention and ecological protection.展开更多
基金supported by the National Key Research and Development Program of China(Grants No.2016YFC0402307 and 2016YFC0402103)the National Natural Science Foundation of China(Grant No.51520105014).
文摘The Three Gorges Project(TGP)has changed the flow-sediment process in the middle Yangtze River.For navigation purposes,there is an urgent need to study the changes of the river regime over a long-term period and the shoal-channel evolution over different seasons since the completion of the TGP.Based on analysis of the measured data and the results of a two-dimensional mathematical model,the changes of the river regime and river bed evolution in the Yaojian reach downstream of the TGP were studied.Results show that a high sediment transport flux helps to keep the main flow in the North Branch,while a low sediment transport flux helps to keep the main flow in the South Branch.Thus,the main branch will not change in the near future because of the low sediment transport load.In this study,the flow-sediment process adjusted by the TGP was restored to the conditions before the TGP,and the river bed evolution under the adjusted and non-adjusted flow-sediment conditions was calculated.After the completion of the TGP,the reservoir storage accelerated the flood recession process and decreased the erosion by 11.9%under the flow-sediment conditions in 2010,and the deposition in the flood season decreased by 56.4%.
基金supported by the National Key Research and Development Program of China(Grants No.2016YFC0402306 and 2016YFC0402106)the National Natural Science Foundation of China(Grant No.51809131)+1 种基金the Key Laboratory of Yellow River Sediment Research,Ministry of Water Resources of China(Grant No.2016002)the Fundamental Research Funds for Central Public Welfare Research Institutes(Grants No.TKS160103,TKS180201,and TKS180411)
文摘The waterway in the middle and lower reaches of the Yangtze River has long been known as the Golden Waterway and has served as an important link in the construction of the Yangtze River Economic Belt.Therefore,expanding its dimensions is a significant goal,particularly given the long-range cumulative erosion occurring downstream of the Three Gorges Dam (TGD),which has been concentrated in the dry river channel.With the regulation of the volume from upstream reservoirs and the TGD,the minimum discharge and water level of the river downstream are increasing,and creating favorable conditions for the increase of the depth of the waterway.The discharge compensation effect during the dry season offsets the decline in the water level of the river channel caused by the down-cutting of part of the riverbed,but the minimum navigable water level of the segment near the dam still shows a declining trend.In recent years,several waterway remediation projects have been implemented in the downstream reaches of the TGD and although the waterway depth and width have been increased,the channel dimensions are still insufficient in the Yichang-Anqing reach (with a total length of 1026 km),as compared to the upstream reservoir area and the deep water channel in the downstream tidal reaches.A comprehensive analysis of the water depth and the number and length of shoals in the waterway indicates that its dimensions can be increased to 4.5 m ×200 m and 6.0 m×200 m in the Yichang-Wuhan and Wuhan-Anqing reaches,respectively.This is also feasible given the remediation technologies currently available,but remediation projects need to be coordinated with those for flood prevention and ecological protection.