The load compensation equipment for anchor cable named low retraction prestressed anchorage system with twice-tension(referred to as twice-tension anchorage system) is proposed in the paper. Calculation results of loo...The load compensation equipment for anchor cable named low retraction prestressed anchorage system with twice-tension(referred to as twice-tension anchorage system) is proposed in the paper. Calculation results of loop anchorage prestressing loss(PL) values of inner lining(IL)in Yellow River-crossing tunnel under two anchorage systems,including twice- tension anchorage system and HM(Chinese transliteration is huanmao)anchorage system,are introduced. The software ANSYS is selected to realize the three-dimensional(3D) finite element modeling to accomplish simulation and calculation works under the two anchorage systems,respectively. Stress processes of IL under the two working conditions,of which one is completed cable tensioning(CCT) and the other is water in the tunnel with the designed water pressure(DWP),are contrasted and analyzed. Impacts of prestressing forces of anchor cables on structural safety under the two anchorage systems are contrasted. The calculation results show that the twice-tension anchorage system can reduce PL effectively and then increase prestresses of wall concrete(WC). Meanwhile,the anchorage system has the advantages of improving security and stability of tunnel structure,reducing project costs and saving steel consumption. The research work is available to related design and construction of anchor cable,and is worthy of promotion and application.展开更多
The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the...The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the organization of the construction activities in the small and confined area,the horizontal transportation for shield boring and high safety management requirements.A super-long invert lining construction jumbo,as well as the matching California switch,is developed,which provides solution for the confliction between the invert lining construction and the horizontal transportation.The procedure and method for the synchronous operation of the shield boring and the secondary lining are developed by referring to the synchronous construction of the secondary lining during the boring of the TBMs in hard rocks.Due to the adoption of the synchronous operation of the shield boring and the secondary lining,the construction period is shortened and the construction cost is reduced.The paper can provide reference for the synchronous construction of the secondary lining in similar projects in the future.展开更多
In the past decades, many underwater tunnels have been constructed in the mainland of China, and great progress has been made in related tunneling technologies. This paper presents the history and state of the art of ...In the past decades, many underwater tunnels have been constructed in the mainland of China, and great progress has been made in related tunneling technologies. This paper presents the history and state of the art of underwater tunnels in the mainland of China in terms of shield-bored tunnels, drill-and-blast tunnels, and immersed tunnels. Typical underwater tunnels of these types in the mainland of China are described, along with innovative technologies regarding comprehensive geological prediction, grouting-based consolidation, the design and construction of large cross-sectional tunnels with shallow cover in weak strata, cutting tool replacement under limited drainage and reduced pressure conditions, the detection and treatment of boulders, the construction of underwater tunnels in areas with high seismic intensity, and the treatment of serious sedimentation in a foundation channel of immersed tunnels. Some suggestions are made regarding the three potential great strait-crossing tunnels-the Qiongzhou Strait-Crossing Tunnel, Bohai Strait-Crossing Tunnel, and Taiwan Strait-Crossing Tunnel--and issues related to these great strait-crossing tunnels that need further study are proposed.展开更多
基金National Natural Science Foundation of China(No.51079107)Fundamental Research Funds for the Central Universities(No.5082022)
文摘The load compensation equipment for anchor cable named low retraction prestressed anchorage system with twice-tension(referred to as twice-tension anchorage system) is proposed in the paper. Calculation results of loop anchorage prestressing loss(PL) values of inner lining(IL)in Yellow River-crossing tunnel under two anchorage systems,including twice- tension anchorage system and HM(Chinese transliteration is huanmao)anchorage system,are introduced. The software ANSYS is selected to realize the three-dimensional(3D) finite element modeling to accomplish simulation and calculation works under the two anchorage systems,respectively. Stress processes of IL under the two working conditions,of which one is completed cable tensioning(CCT) and the other is water in the tunnel with the designed water pressure(DWP),are contrasted and analyzed. Impacts of prestressing forces of anchor cables on structural safety under the two anchorage systems are contrasted. The calculation results show that the twice-tension anchorage system can reduce PL effectively and then increase prestresses of wall concrete(WC). Meanwhile,the anchorage system has the advantages of improving security and stability of tunnel structure,reducing project costs and saving steel consumption. The research work is available to related design and construction of anchor cable,and is worthy of promotion and application.
文摘The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the organization of the construction activities in the small and confined area,the horizontal transportation for shield boring and high safety management requirements.A super-long invert lining construction jumbo,as well as the matching California switch,is developed,which provides solution for the confliction between the invert lining construction and the horizontal transportation.The procedure and method for the synchronous operation of the shield boring and the secondary lining are developed by referring to the synchronous construction of the secondary lining during the boring of the TBMs in hard rocks.Due to the adoption of the synchronous operation of the shield boring and the secondary lining,the construction period is shortened and the construction cost is reduced.The paper can provide reference for the synchronous construction of the secondary lining in similar projects in the future.
文摘In the past decades, many underwater tunnels have been constructed in the mainland of China, and great progress has been made in related tunneling technologies. This paper presents the history and state of the art of underwater tunnels in the mainland of China in terms of shield-bored tunnels, drill-and-blast tunnels, and immersed tunnels. Typical underwater tunnels of these types in the mainland of China are described, along with innovative technologies regarding comprehensive geological prediction, grouting-based consolidation, the design and construction of large cross-sectional tunnels with shallow cover in weak strata, cutting tool replacement under limited drainage and reduced pressure conditions, the detection and treatment of boulders, the construction of underwater tunnels in areas with high seismic intensity, and the treatment of serious sedimentation in a foundation channel of immersed tunnels. Some suggestions are made regarding the three potential great strait-crossing tunnels-the Qiongzhou Strait-Crossing Tunnel, Bohai Strait-Crossing Tunnel, and Taiwan Strait-Crossing Tunnel--and issues related to these great strait-crossing tunnels that need further study are proposed.