In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expan...In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expansion of highway construction,power supply,and distribution has led to several challenges in mechanical and electrical engineering technology.Ensuring the safe,stable,and cost-effective operation of the power supply and distribution system to meet the diverse requirements of highway operations has become a pressing issue.This article takes an example of a highway electromechanical engineering power supply and distribution construction project to provide insight into the construction process of highway electromechanical engineering power supply and distribution technology.展开更多
The continuous development of the power industry has had a positive impact on thermal power plants,helping them maintain a good production form.In the use of steam turbine equipment in thermal power plants,to prolong ...The continuous development of the power industry has had a positive impact on thermal power plants,helping them maintain a good production form.In the use of steam turbine equipment in thermal power plants,to prolong its lifespan and avoid safety hazards,it is necessary to pay attention to strengthening maintenance and construction organization,better implementing effective organizational work,and effectively applying steam turbine equipment to ensure the sustainable development of thermal power plants.This article discusses the concept of equipment maintenance from the perspective of steam turbine equipment in thermal power plants,analyzes the current situation of equipment maintenance,and proposes a specific construction organization to provide a reference for steam turbine equipment maintenance.展开更多
This paper describes the planned power transmission from west to east through three channels. It presents the main characteristics of these three channels and the problems need to be solved.
The authors want to changed the web link of the software platform in this Briefing.Page 97,section 'INTRODUCTION',the web link of SHEsis is changed from http://www.nhgg.org/analysis tohttp://analysis.bio-x.
Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Thir...Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Third Qinshan Nuclear Power Company(TQNPC)persisted in independent innovation management during the project construction,commissioning and self-dependent operation,efficiently realizing the three controls of the project,i.e.quality control,schedule control and investment control,and persisted in technical improvement on the basis of digestion and absorption of CANDU-6 technology to improve the unit safety and reliability.The project construction practice has helped China's nuclear power project management to becomeprogrammed,computerized,standardized and internationalized management from the existing basis.After completion of the project,with unit safe and steady operation as the prerequisite,TQNPC performed several technical modifications and innovations to continuously improve the unit performance.In the area of staff development,TQNPC paid much attention to cultivation of corporate culture,strengthed staff training and built up a good circulating mechanism with staff training and project construction promoting each other.Further to "Zero Breakthrough" and a new step forward of locolization successfully realized in Qinshan Nuclear Power Plant and Nuclear Power Qinshan Joint Venture Company,the improvement and developemnt of nuclear power project management level in Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant provided reference for promotion of nuclear power development in China and standardized management of introducing large imported project.展开更多
Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertaint...Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertainty of each index value under the market environment,fuzzy numbers are used to describe qualitative indicators and interval numbers are used to describe quantitative ones.Taking into account decision-maker’s subjective risk attitudes,a multi-criteria decision-making(MCDM)method based on improved prospect theory is proposed.First,the[−1,1]RGPBIT operator is proposed to normalize the original data,to obtain the best andworst schemes of PGCPs.Furthermore,the correlation coefficients between interval/fuzzy numbers and the best/worst schemes are defined and introduced to the prospect theory to improve its value function and loss function,and the positive and negative prospect value matrices of the project are obtained.Then,the optimization model with the maximum comprehensive prospect value is constructed,the optimal attribute weight is determined,and the PGCPs are ranked accordingly.Taking four PGCPs of the IEEERTS-79 node system as examples,an illustration of the feasibility and effectiveness of the proposed method is provided.展开更多
It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime...It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.展开更多
China needs to develop a strong national power grid which takes ultra-high-voltage (UHV) transmission systems as its core. The grid is expected to adopt 1000-kV-class AC and ± 800-kV DC transmission systems. In v...China needs to develop a strong national power grid which takes ultra-high-voltage (UHV) transmission systems as its core. The grid is expected to adopt 1000-kV-class AC and ± 800-kV DC transmission systems. In view of significant achievements in technological research and considerable progress in UHV manufacturing technology, China is capable of developing UHV systems. In order to promote the construction of UHV systems,China Electric Power Research Institute and other institutions have initiated first-phase research activities of UHV transmission technologies. The main contents involve research on UHV transmission technology and its economy,developing and manufacturing abilities on UHV equipment, prospective of UHV network frame and selection of demonstration projects, etc.展开更多
This paper describes briefly the results of construction and retrofit of rural power networks in West China's 12 provinces (regions). A large number of power lines and sub stations were newly built and updated. Th...This paper describes briefly the results of construction and retrofit of rural power networks in West China's 12 provinces (regions). A large number of power lines and sub stations were newly built and updated. The rate of power penetration of townships, villages and peasant households was grown significantly. The rate of line loss dropped great ly. Power-supply reliability was improved clearly. The 'same network, same price' of urban and rural residential con sumption was brought about, and sales price to peasant households lowered substantially.展开更多
On April 25, the Hainan Changjiang nuclear power project, jointly invested by China National Nuclear Corporation (CNNC) and China Huaneng Group with 51% and 49% shares, respectively, formally
In China, the trading of construction land quotas has undergone an institutional evolution process characterized by gradual deregulation.In 2021, the Central Committee of the Communist Party of China(CPC) resolved to ...In China, the trading of construction land quotas has undergone an institutional evolution process characterized by gradual deregulation.In 2021, the Central Committee of the Communist Party of China(CPC) resolved to develop a national cross-regional trading mechanism for construction land quotas.Construction land quotas, which have attributes of both public power and private rights, share certain common grounds with the rights of land development, dumping and carbon emission.To build a national trading market for construction land quotas, it is necessary to make clarifications and innovations in macro-level ideas, meso-level mechanisms, and micro-level designs.展开更多
In consideration of high investment, large scope, longperiod and arduous tasks of rural power garid construction andretrofit, this paper analyzes the present state of China’s ruralpower grids and the difficulties on ...In consideration of high investment, large scope, longperiod and arduous tasks of rural power garid construction andretrofit, this paper analyzes the present state of China’s ruralpower grids and the difficulties on the construction and retrofit,for which some technical proposals are put forward.展开更多
According to the National Meeting on Power Construction and Cost Control held in Beijing on 26th August 1996, the target for power construction in the period of 9th Five- year Plan is set-up as follows:
文摘In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expansion of highway construction,power supply,and distribution has led to several challenges in mechanical and electrical engineering technology.Ensuring the safe,stable,and cost-effective operation of the power supply and distribution system to meet the diverse requirements of highway operations has become a pressing issue.This article takes an example of a highway electromechanical engineering power supply and distribution construction project to provide insight into the construction process of highway electromechanical engineering power supply and distribution technology.
文摘The continuous development of the power industry has had a positive impact on thermal power plants,helping them maintain a good production form.In the use of steam turbine equipment in thermal power plants,to prolong its lifespan and avoid safety hazards,it is necessary to pay attention to strengthening maintenance and construction organization,better implementing effective organizational work,and effectively applying steam turbine equipment to ensure the sustainable development of thermal power plants.This article discusses the concept of equipment maintenance from the perspective of steam turbine equipment in thermal power plants,analyzes the current situation of equipment maintenance,and proposes a specific construction organization to provide a reference for steam turbine equipment maintenance.
文摘This paper describes the planned power transmission from west to east through three channels. It presents the main characteristics of these three channels and the problems need to be solved.
文摘The authors want to changed the web link of the software platform in this Briefing.Page 97,section 'INTRODUCTION',the web link of SHEsis is changed from http://www.nhgg.org/analysis tohttp://analysis.bio-x.
文摘Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Third Qinshan Nuclear Power Company(TQNPC)persisted in independent innovation management during the project construction,commissioning and self-dependent operation,efficiently realizing the three controls of the project,i.e.quality control,schedule control and investment control,and persisted in technical improvement on the basis of digestion and absorption of CANDU-6 technology to improve the unit safety and reliability.The project construction practice has helped China's nuclear power project management to becomeprogrammed,computerized,standardized and internationalized management from the existing basis.After completion of the project,with unit safe and steady operation as the prerequisite,TQNPC performed several technical modifications and innovations to continuously improve the unit performance.In the area of staff development,TQNPC paid much attention to cultivation of corporate culture,strengthed staff training and built up a good circulating mechanism with staff training and project construction promoting each other.Further to "Zero Breakthrough" and a new step forward of locolization successfully realized in Qinshan Nuclear Power Plant and Nuclear Power Qinshan Joint Venture Company,the improvement and developemnt of nuclear power project management level in Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant provided reference for promotion of nuclear power development in China and standardized management of introducing large imported project.
文摘Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertainty of each index value under the market environment,fuzzy numbers are used to describe qualitative indicators and interval numbers are used to describe quantitative ones.Taking into account decision-maker’s subjective risk attitudes,a multi-criteria decision-making(MCDM)method based on improved prospect theory is proposed.First,the[−1,1]RGPBIT operator is proposed to normalize the original data,to obtain the best andworst schemes of PGCPs.Furthermore,the correlation coefficients between interval/fuzzy numbers and the best/worst schemes are defined and introduced to the prospect theory to improve its value function and loss function,and the positive and negative prospect value matrices of the project are obtained.Then,the optimization model with the maximum comprehensive prospect value is constructed,the optimal attribute weight is determined,and the PGCPs are ranked accordingly.Taking four PGCPs of the IEEERTS-79 node system as examples,an illustration of the feasibility and effectiveness of the proposed method is provided.
文摘It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.
文摘China needs to develop a strong national power grid which takes ultra-high-voltage (UHV) transmission systems as its core. The grid is expected to adopt 1000-kV-class AC and ± 800-kV DC transmission systems. In view of significant achievements in technological research and considerable progress in UHV manufacturing technology, China is capable of developing UHV systems. In order to promote the construction of UHV systems,China Electric Power Research Institute and other institutions have initiated first-phase research activities of UHV transmission technologies. The main contents involve research on UHV transmission technology and its economy,developing and manufacturing abilities on UHV equipment, prospective of UHV network frame and selection of demonstration projects, etc.
文摘This paper describes briefly the results of construction and retrofit of rural power networks in West China's 12 provinces (regions). A large number of power lines and sub stations were newly built and updated. The rate of power penetration of townships, villages and peasant households was grown significantly. The rate of line loss dropped great ly. Power-supply reliability was improved clearly. The 'same network, same price' of urban and rural residential con sumption was brought about, and sales price to peasant households lowered substantially.
文摘On April 25, the Hainan Changjiang nuclear power project, jointly invested by China National Nuclear Corporation (CNNC) and China Huaneng Group with 51% and 49% shares, respectively, formally
基金a phased research achievement of Sichuan's social science programming project in 2019 titled“Overall Planning of Public Power and Expression of Private Rights in Inter-provincial Trading of Construction Land Quotas of Impoverished Regions”(project number:SC19B093)。
文摘In China, the trading of construction land quotas has undergone an institutional evolution process characterized by gradual deregulation.In 2021, the Central Committee of the Communist Party of China(CPC) resolved to develop a national cross-regional trading mechanism for construction land quotas.Construction land quotas, which have attributes of both public power and private rights, share certain common grounds with the rights of land development, dumping and carbon emission.To build a national trading market for construction land quotas, it is necessary to make clarifications and innovations in macro-level ideas, meso-level mechanisms, and micro-level designs.
文摘In consideration of high investment, large scope, longperiod and arduous tasks of rural power garid construction andretrofit, this paper analyzes the present state of China’s ruralpower grids and the difficulties on the construction and retrofit,for which some technical proposals are put forward.
文摘According to the National Meeting on Power Construction and Cost Control held in Beijing on 26th August 1996, the target for power construction in the period of 9th Five- year Plan is set-up as follows: