期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Research on the Resistance of Cutting Mechanism of Mining Longitudinal Roadheader
1
作者 Mengjiao NIU Yong ZHAO Yongliang YUAN 《Mechanical Engineering Science》 2024年第1期8-12,共5页
In order to accurately obtain the dynamic characteristics of the cutting mechanism of the mining longitudinal roadheader,combined with the working principle of the mining longitudinal roadheader,the theoretical analys... In order to accurately obtain the dynamic characteristics of the cutting mechanism of the mining longitudinal roadheader,combined with the working principle of the mining longitudinal roadheader,the theoretical analysis and derivation are carried out in detail.By using ADAMS to simulate,the resistance curve and torque curve of the cutting mechanism in different directions are obtained.The results show that ADAMS can effectively predict the excavation resistance and torque of the cutting mechanism of mining longitudinal roadheader,which has certain reference value for future optimization design. 展开更多
关键词 longitudinal roadheader cutting mechanism dynamic characteristics DYNAMICS
下载PDF
Prediction of roadheaders' performance using artificial neural network approaches (MLP and KOSFM) 被引量:9
2
作者 Arash Ebrahimabadi Mohammad Azimipour Ali Bahreini 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2015年第5期573-583,共11页
A pplication o f m echanical excavators is one o f th e m o st com m only used excavation m eth o d s because itcan bring th e p ro ject m ore productivity, accuracy and safety. A m ong th e m echanical excavators, ro... A pplication o f m echanical excavators is one o f th e m o st com m only used excavation m eth o d s because itcan bring th e p ro ject m ore productivity, accuracy and safety. A m ong th e m echanical excavators, roadhead ers are m echanical m iners w h ich have b een extensively u se d in tu n n elin g , m ining an d civil indu stries. Perform ance pred ictio n is an im p o rta n t issue for successful ro a d h e a d e r application andgenerally deals w ith m achine selection, p ro d u ctio n rate an d b it consu m p tio n . The m ain aim o f thisresearch is to investigate th e c u ttin g p erfo rm an ce (in stan tan eo u s c u ttin g rates (ICRs)) o f m ed iu m -d u tyro ad h ead ers by using artificial neural n etw o rk (ANN) approach. T here are d ifferent categories forANNs, b u t based o n train in g alg o rith m th e re are tw o m ain k in d s: supervised and u n su p erv ised . Them u lti-lay er p ercep tro n (MLP) an d K ohonen self-organizing feature m ap (KSOFM) are th e m o st w idelyused neu ral netw o rk s for supervised an d u n su p erv ised ones, respectively. For gaining this goal, ad atab ase w as prim arily provided from ro ad h e a d e rs' p erfo rm an ce an d geom echanical characteristics o frock form ations in tu n n els and d rift galleries in Tabas coal m ine, th e larg est an d th e only fullymech an ized coal m ine in Iran. T hen th e datab ase w as analyzed in o rd e r to yield th e m ost im p o rtan tfactor for ICR by using relatively im p o rta n t factor in w hich G arson eq u atio n w as utilized. The MLPn etw o rk w as train ed by 3 in p u t p ara m e te rs including rock m ass pro p erties, rock quality d esignation(RQD), in tact rock p ro p erties such as uniaxial com pressive stre n g th (UCS) an d Brazilian ten sile stren g th(BTS), and o n e o u tp u t p a ra m e te r (ICR). In o rd e r to have m ore v alidation o n MLP o u tp u ts, KSOFM visualizationw as applied. The m ean square e rro r (MSE) an d regression coefficient (R ) o f MLP w e re found tobe 5.49 an d 0.97, respectively. M oreover, KSOFM n etw o rk has a m ap size o f 8 x 5 and final qu an tizatio nan d topographic erro rs w e re 0.383 an d 0.032, respectively. The results show th a t MLP neural n etw orkshave a strong capability to p red ict an d ev alu ate th e perfo rm an ce o f m ed iu m -d u ty ro ad h ead ers in coalm easu re rocks. Furtherm ore, it is concluded th a t KSOFM neural n etw o rk is an efficient w ay for u n d e rstand in g system beh av io r an d know ledge extraction. Finally, it is indicated th a t UCS has m ore influenceo n ICR b y applying th e b e st train ed MLP n etw o rk w eig h ts in G arson eq u atio n w h ich is also confirm ed byKSOFM. 展开更多
关键词 Artificial neural network(ANN) Performance prediction roadheader Instantaneous cutting rate(ICR) Tabas coal mine project
下载PDF
Evaluation of boring machine performance with special reference to geomechanical characteristics 被引量:1
3
作者 K. Goshtasbi M. Monjezi P. Tourgoli 《International Journal of Minerals,Metallurgy and Materials》 SCIE EI CAS CSCD 2009年第6期615-619,共5页
The duration of tunneling projects mostly depends on the performance of boring machines. The performance of boring machines is a function of advance rate, which depends on the machine characterizations and geomechanic... The duration of tunneling projects mostly depends on the performance of boring machines. The performance of boring machines is a function of advance rate, which depends on the machine characterizations and geomechanical properties of rock mass. There were various theoretical and empirical models for estimating the advance rate. In this paper, after determining the geomechanical properties of rock mass encountered in the Isfahan metro tunnel, the performance of the roadheader and tunnel boring machine (TBM) were then evaluated using various models. The calculation results show that the average instantaneous cutting rate of the roadheader in sandstone and shale are 42.8 and 74.5 m^3/h respectively. However the actual values in practice are 34.2 and 51.3 m^3/h. The operational cutting rate of the roadheader in sandstone and shale are 8.2 and 9.7 m^3/h respectively, but the actual values are 6.5 and 6.7 m^3/h. The penetration rate of the TBM in shale is predicted to be 50-60 mm/round. 展开更多
关键词 performance prediction roadheader cutting rate specific energy tunnel boring machine penetration rate
下载PDF
First Coal Mining and Roadheading Robot Developed in China
4
作者 Xu Shifan Hao Jifei and He Fenghou (China University of Mining & Technology) 《China Coal》 1997年第S1期31-33,共3页
关键词 FIGURE First Coal Mining and Roadheading Robot Developed in China
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部