Haulage networks are vital to underground mining operations as they constitute the arteries through which blasted ore is transported to surface. In the sublevel stoping method and its variations, haulage drifts are ex...Haulage networks are vital to underground mining operations as they constitute the arteries through which blasted ore is transported to surface. In the sublevel stoping method and its variations, haulage drifts are excavated in advance near the ore block that will be mined out. Numerical modeling is a technique that is frequently employed to assess the redistribution of mining-induced stresses, and to compare the impact of different stope sequence scenarios on haulage network stability. In this study,typical geological settings in the Canadian Shield were replicated in a numerical model with a steeplydipping tabular orebody striking EW. All other formations trended in the same direction except for two dykes on either side of the orebody with a WNW-ESE strike. Rock mass properties and in situ stress measurements from a case study mine were used to calibrate the model. Drifts and crosscuts were excavated in the footwall and two stope sequence scenarios-a diminishing pillar and a center-out one-were implemented in 24 mining stages. A combined volumetric-numerical analysis was conducted for two active levels by comparing the extent of unstable rock mass at each stage using shear,compressive, and tensile instability criteria. Comparisons were made between the orebody and the host rock, between the footwall and hanging wall, and between the two stope sequence scenarios. It was determined that in general, the center-out option provided a larger volume of instability with the shear criterion when compared to the diminishing pillar one(625,477 m~3 compared to 586,774 m~3 in the orebody; 588 m~3 compared to 403 m~3 in the host rock). However, the reverse was true for tensile(134,298 m~3 compared to 128,834 m~3 in the orebody; 91,347 m~3 compared to 67,655 m~3 in the host rock)instability where the diminishing pillar option had the more voluminous share.展开更多
In order to seek the economical, practical and effective method of obtaining the thickness of broken rock zone, an emerging intelligent prediction method with adaptive neuro-fuzzy inference system (ANFIS) was introduc...In order to seek the economical, practical and effective method of obtaining the thickness of broken rock zone, an emerging intelligent prediction method with adaptive neuro-fuzzy inference system (ANFIS) was introduced into the thickness prediction. And the software with functions of creating and applying prediction systems was devel- oped on the platform of MATLAB6.5. The software was used to predict the broken rock zone thickness of drifts at Li- angbei coal mine, Xinlong Company of Coal Industry in Xuchang city of Henan province. The results show that the predicted values accord well with the in situ measured ones. Thereby the validity of the software is validated and it provides a new approach to obtaining the broken zone thickness.展开更多
This paper outlines a methodology to assess the seismic drift of reinforced concrete buildings with limited structural and geotechnical information. Based on the latest and the most advanced research on predicting pot...This paper outlines a methodology to assess the seismic drift of reinforced concrete buildings with limited structural and geotechnical information. Based on the latest and the most advanced research on predicting potential near-field and far field earthquakes affecting Hong Kong, the engineering response spectra for both rock and soil sites are derived. A new step-by-step procedure for displacement-based seismic hazard assessment of building structures is proposed to determine the maximum inter-storey drift demand for reinforced concrete buildings. The primary information required for this assessment is only the depth of the soft soil above bedrock and the height of the building. This procedure is further extended to assess the maximum chord rotation angle demand for the coupling beam of coupled shear wall or frame wall structures, which may be very critical when subjected to earthquake forces. An example is provided to illustrate calibration of the assessment procedure by using actual engineering structural models.展开更多
基金financially supported by the Natural Science and Engineering Research Council of Canada(NSERC) with grant No.223079
文摘Haulage networks are vital to underground mining operations as they constitute the arteries through which blasted ore is transported to surface. In the sublevel stoping method and its variations, haulage drifts are excavated in advance near the ore block that will be mined out. Numerical modeling is a technique that is frequently employed to assess the redistribution of mining-induced stresses, and to compare the impact of different stope sequence scenarios on haulage network stability. In this study,typical geological settings in the Canadian Shield were replicated in a numerical model with a steeplydipping tabular orebody striking EW. All other formations trended in the same direction except for two dykes on either side of the orebody with a WNW-ESE strike. Rock mass properties and in situ stress measurements from a case study mine were used to calibrate the model. Drifts and crosscuts were excavated in the footwall and two stope sequence scenarios-a diminishing pillar and a center-out one-were implemented in 24 mining stages. A combined volumetric-numerical analysis was conducted for two active levels by comparing the extent of unstable rock mass at each stage using shear,compressive, and tensile instability criteria. Comparisons were made between the orebody and the host rock, between the footwall and hanging wall, and between the two stope sequence scenarios. It was determined that in general, the center-out option provided a larger volume of instability with the shear criterion when compared to the diminishing pillar one(625,477 m~3 compared to 586,774 m~3 in the orebody; 588 m~3 compared to 403 m~3 in the host rock). However, the reverse was true for tensile(134,298 m~3 compared to 128,834 m~3 in the orebody; 91,347 m~3 compared to 67,655 m~3 in the host rock)instability where the diminishing pillar option had the more voluminous share.
基金Projects 50474063 and 50490273 supported by National Natural Science Foundation of China
文摘In order to seek the economical, practical and effective method of obtaining the thickness of broken rock zone, an emerging intelligent prediction method with adaptive neuro-fuzzy inference system (ANFIS) was introduced into the thickness prediction. And the software with functions of creating and applying prediction systems was devel- oped on the platform of MATLAB6.5. The software was used to predict the broken rock zone thickness of drifts at Li- angbei coal mine, Xinlong Company of Coal Industry in Xuchang city of Henan province. The results show that the predicted values accord well with the in situ measured ones. Thereby the validity of the software is validated and it provides a new approach to obtaining the broken zone thickness.
基金the Research Grants Council of Hong Kong Under Project No. HKU 7023/99E and HKU 7002/00EThe Ministry of Science and Technology of PRC and The Bureau of Science and Technology of Guangzhou Under Project No. 2004CCA03300 and No.2004Z1-E0051
文摘This paper outlines a methodology to assess the seismic drift of reinforced concrete buildings with limited structural and geotechnical information. Based on the latest and the most advanced research on predicting potential near-field and far field earthquakes affecting Hong Kong, the engineering response spectra for both rock and soil sites are derived. A new step-by-step procedure for displacement-based seismic hazard assessment of building structures is proposed to determine the maximum inter-storey drift demand for reinforced concrete buildings. The primary information required for this assessment is only the depth of the soft soil above bedrock and the height of the building. This procedure is further extended to assess the maximum chord rotation angle demand for the coupling beam of coupled shear wall or frame wall structures, which may be very critical when subjected to earthquake forces. An example is provided to illustrate calibration of the assessment procedure by using actual engineering structural models.