The total horizontal and vertical forces acting on a partially-perforated caisson breakwater and their phase difference are investigated in this study. The perforated breakwater sits on the rubble tilled foundation, a...The total horizontal and vertical forces acting on a partially-perforated caisson breakwater and their phase difference are investigated in this study. The perforated breakwater sits on the rubble tilled foundation, and has a rock-filled core. An analytical solution is developed based on the eigenfunction expansion and matching method to solve the wave field around the breakwater. The finite element method is used for simulating the wave-induced tlow in the rabble-filled foundation. Experiments are also conducted to study the wave forces on the perforated caissons. Numerical predictions of the present model are compared with experimental resuhs. The phase differences between the total horizontal and vertical forces are particularly analyzed by means of experimental and numerical results. The major factors that affect the wave forces are examined.展开更多
The theory and method of system integration for the real-time monitoring of core rock-fill dam filling con- struction quality are studied in this paper. First, the importance analysis of system integration factors is ...The theory and method of system integration for the real-time monitoring of core rock-fill dam filling con- struction quality are studied in this paper. First, the importance analysis of system integration factors is carried out with the analytic hierarchy process. Then, according to the analysis result of integration factors, the conceptual model of system integration is built based on function integration, index integration, technology integration and information integration, the index structure of core rock-fill dam filling construction quality control is constructed and the method of function integration and technology integration is studied. The mathematical model of process monitoring is built according to monitoring objective, process and indexes. Research results have been applied in Nuozhadu core rock-fill dam construction management, realizing system integration through building appropriate monitoring work flow and comprehensive information platform of digital dam.展开更多
An optimal allocation of earth is of great significance to reduce the project cost and duration in the construction of rock-fill dams. The earth allocation is a dynamic system affected by various time-space constraint...An optimal allocation of earth is of great significance to reduce the project cost and duration in the construction of rock-fill dams. The earth allocation is a dynamic system affected by various time-space constraints. Based on previous studies, a new method of optimizing this dynamic system as a static one is presented. In order to build a generalized and flexible model of the problem, some man-made constraints were investigated in building the mathematic model. Linear programming and simplex method are introduced to solve the optimization problem of earth allocation. A case study in a large-scale rock-fill dam construction project is presented to demonstrate the proposed method and its successful application shows the feasibility and effectiveness of the method.展开更多
This study focuses on the analytical prediction of subsurface settlement induced by shield tunnelling in sandy cobble stratum considering the volumetric deformation modes of the soil above the tunnel crown.A series of...This study focuses on the analytical prediction of subsurface settlement induced by shield tunnelling in sandy cobble stratum considering the volumetric deformation modes of the soil above the tunnel crown.A series of numerical analyses is performed to examine the effects of cover depth ratio(C/D),tunnel volume loss rate(h t)and volumetric block proportion(VBP)on the characteristics of subsurface settle-ment trough and soil volume loss.Considering the ground loss variation with depth,three modes are deduced from the volumetric deformation responses of the soil above the tunnel crown.Then,analytical solutions to predict subsurface settlement for each mode are presented using stochastic medium theory.The influences of C/D,h t and VBP on the key parameters(i.e.B and N)in the analytical expressions are discussed to determine the fitting formulae of B and N.Finally,the proposed analytical solutions are validated by the comparisons with the results of model test and numerical simulation.Results show that the fitting formulae provide a convenient and reliable way to evaluate the key parameters.Besides,the analytical solutions are reasonable and available in predicting the subsurface settlement induced by shield tunnelling in sandy cobble stratum.展开更多
The leakage occurs during operation of the dam in Liuhuanggou reservoir. It’s a threat to the safety of the people’s lives and property in downstream. In order to eliminate the hidden danger of reservoir, ensure the...The leakage occurs during operation of the dam in Liuhuanggou reservoir. It’s a threat to the safety of the people’s lives and property in downstream. In order to eliminate the hidden danger of reservoir, ensure the safety of the dam, play better the function of flood control and water storage of the reservoir etc., we apply the 3D electrical resistivity tomography detecting technology and volume rendering image processing technology, make the measurement in field, process the data and combine the field survey to find out the leakage channels inside the dam. The results show that the 3D resistivity images appear the low resistivity zone corresponding with the leakage channels. There are two main leakage channels that come from different location inside the dam. It is feasible to diagnose the leakage in earth rock-fill dam by applying 3D electrical resistivity tomography.展开更多
This paper compares the different inversion results of three different earth rock-fill dam models with the actual leakage passages by performing isotope tracing tests and resistivity tomographic tests. The accuracy of...This paper compares the different inversion results of three different earth rock-fill dam models with the actual leakage passages by performing isotope tracing tests and resistivity tomographic tests. The accuracy of the experimental results is evaluated, and the characteristics of these two methods are analyzed. As a result, some significant references are offered for earth rock-fill dam’s hidden defects detection. The experimental results show that the leakage and the direction of the seepage can be judged by isotope tracing tests, meanwhile, the degree of the leakage can be confirmed through the determination of the horizontal seepage velocity and the vertical seepage velocity, but it is difficult to properly determine the position of leakage passages and the range of leakage. Relatively speaking, the positions of the leakage passages can be accurately and directly displayed through resistivity tomographic tests. The experiment results show that the resistivity tomographic method is much better than isotope tracing method with regard to earth rock-fill dam’s hidden defects detection, and the resistivity tomographic method expresses much more convenience and much higher precision than isotope tracing method.展开更多
Based on the APDL (ANSYS Parametric Design Language) and combined with the actual project related to parameters of filling material, imported Duncan-Chang constitutive model which has been widely applied in soil mas...Based on the APDL (ANSYS Parametric Design Language) and combined with the actual project related to parameters of filling material, imported Duncan-Chang constitutive model which has been widely applied in soil mass and rock-fill in the ANSYS software. With the three-dimensional nonlinear finite element analysis by the mid-point incremental method, what have been computed are the deformation and stress analysis ofNa Ba reservoir CFRD (Concrete Face Rock-fill Dam) in filling period. The calculation results provide practical reference for the dam during construction safety filling stress and deformation analysis and real-time monitoring.展开更多
Ground hydraulic fracturing plays a crucial role in controlling the far-field hard roof,making it imperative to identify the most suitable target stratum for effective control.Physical experiments are conducted based ...Ground hydraulic fracturing plays a crucial role in controlling the far-field hard roof,making it imperative to identify the most suitable target stratum for effective control.Physical experiments are conducted based on engineering properties to simulate the gradual collapse of the roof during longwall top coal caving(LTCC).A numerical model is established using the material point method(MPM)and the strain-softening damage constitutive model according to the structure of the physical model.Numerical simulations are conducted to analyze the LTCC process under different hard roofs for ground hydraulic fracturing.The results show that ground hydraulic fracturing releases the energy and stress of the target stratum,resulting in a substantial lag in the fracturing of the overburden before collapse occurs in the hydraulic fracturing stratum.Ground hydraulic fracturing of a low hard roof reduces the lag effect of hydraulic fractures,dissipates the energy consumed by the fracture of the hard roof,and reduces the abutment stress.Therefore,it is advisable to prioritize the selection of the lower hard roof as the target stratum.展开更多
Shortly after tunneling,problems such as primary-support through cracks and clearance infringement are found in the shallow-buried section of tunnel No.4 of the Jakarta-Bandung High Speed Railway(Jakarta-Bandung HSR),...Shortly after tunneling,problems such as primary-support through cracks and clearance infringement are found in the shallow-buried section of tunnel No.4 of the Jakarta-Bandung High Speed Railway(Jakarta-Bandung HSR),and orthogonal cracks can be found on the earth surface in front of the working face,which brings great challenges to the tunnel construction.In view of the above engineering problems,the sliding surface is speculated according to the geological and field conditions,and the impact of landslides is applied in the model in the form of external load.The paper uses the numerical simulation method to analyze and compare the impact of landslides on the tunnel structure and deformation,and puts forward the reinforcement measures.The conclusions of the studies are:(1)under the influence of heavy rainfall,the strength index of volcanic deposit clay stratum drops sharply,and meanwhile the multiple factors including tunnel excavation are liable to cause sliding of the front slope;(2)parallel landslide in front of the tunnel has a great impact on the tunnel,so setting-up of pre-reinforcement measures to control landslide shall be the focus of similar projects during design;(3)the deformation and stress of the tunnel structure can be significantly controlled for safe construction by strengthening the shallow-buried tunnel with pile foundation and longitudinal and transverse beam frames during landslide.展开更多
Mining causes stress redistribution and stratum movement.In this paper,a numerical model was built according to the geological conditions in the 12th coal mine in Pingdingshan city to study the strata movement and the...Mining causes stress redistribution and stratum movement.In this paper,a numerical model was built according to the geological conditions in the 12th coal mine in Pingdingshan city to study the strata movement and the evolution of stress when mining two overlapping longwall panels,named panels#14 and#15.The strata close to the mined panel move directly towards the gob,while the strata that are farther away swing back and forth during the mining process.The directed movement and swinging can break the transverse boreholes for gas extraction;a surface borehole should not be within the range of directional movement.The stress evolution suggested that the mining of the lower panel#15 after the upper panel#14 would further increase the de-stressed range,while the stress concentration around the mined panel would be increased.Hard strata usually carry a greater stress than adjacent rocks and soft coal seams.The stress in a hard stratum increases greatly,and the stress decreases greatly in the coal seams below the hard stratum.This study supplies a reference for similar coal mines and is useful for determining the de-stressed range and transverse borehole arrangement for gas extraction.展开更多
When an extremely thick rock bed exists above a protected coal seam in the bending zone given the condition of a mining protective seam, this extremely thick rock bed controls the movement of the entire overlying stra...When an extremely thick rock bed exists above a protected coal seam in the bending zone given the condition of a mining protective seam, this extremely thick rock bed controls the movement of the entire overlying stratum. This extremely thick rock bed, called a "main key stratum", will not subside nor break for a long time, causing lower fractures and bed separations not to close and gas can migrate to the bed separation areas along the fractures. These bed separations become gas enrichment areas. By analyzing the rule of fracture evolution and gas migration under the main key stratum after the deep protective coal seam has been mined, we propose a new gas drainage method which uses bore holes, drilled through rock and coal seams at great depths for draining pressure relief gas. In this method, the bores are located at a high level suction roadway (we can also drill them in the drilling field located high in an air gateway). Given the practice in the Haizi mine, the gas drainage rate can reach 73% in the middie coal group, with a gas drainage radius over 100 m.展开更多
The torsional vibration of a rigid plate resting on saturated stratum overlaying bedrock has been analysed for the first time. The dynamic governing differential equations for saturated poroelastic medium are solved b...The torsional vibration of a rigid plate resting on saturated stratum overlaying bedrock has been analysed for the first time. The dynamic governing differential equations for saturated poroelastic medium are solved by employing the technology of Hankel transform. By taking into account the boundary conditions, the dual integral equations of torsional vibration of a rigid circular plate are established, which are further converted into a Fredholm integral equation of the second kind. Subsequently, the dynamic compliance coefficients of the foundation on saturated stratum, the contact shear stress under the foundation and the angular amplitude of the foundation are evaluated. Numerical results indicate that, when the dimensionless height is bigger than 5, saturated stratum overlaying bedrock can be treated as saturated half space approximately. When the dimensionless frequency is low, the permeability of the soil must be taken into account. Furthermore, when the vibration frequency is a constant, the height of the saturated stratum has a slight effect on the dimensionless contact shear stress under the foundation.展开更多
文摘The total horizontal and vertical forces acting on a partially-perforated caisson breakwater and their phase difference are investigated in this study. The perforated breakwater sits on the rubble tilled foundation, and has a rock-filled core. An analytical solution is developed based on the eigenfunction expansion and matching method to solve the wave field around the breakwater. The finite element method is used for simulating the wave-induced tlow in the rabble-filled foundation. Experiments are also conducted to study the wave forces on the perforated caissons. Numerical predictions of the present model are compared with experimental resuhs. The phase differences between the total horizontal and vertical forces are particularly analyzed by means of experimental and numerical results. The major factors that affect the wave forces are examined.
基金National Key Technology R&D Program in the 12th Five Year Plan of China (No. 2011BAB10B06)Independent Innovation Foundation of Tianjin University (No. 1102119)
文摘The theory and method of system integration for the real-time monitoring of core rock-fill dam filling con- struction quality are studied in this paper. First, the importance analysis of system integration factors is carried out with the analytic hierarchy process. Then, according to the analysis result of integration factors, the conceptual model of system integration is built based on function integration, index integration, technology integration and information integration, the index structure of core rock-fill dam filling construction quality control is constructed and the method of function integration and technology integration is studied. The mathematical model of process monitoring is built according to monitoring objective, process and indexes. Research results have been applied in Nuozhadu core rock-fill dam construction management, realizing system integration through building appropriate monitoring work flow and comprehensive information platform of digital dam.
文摘An optimal allocation of earth is of great significance to reduce the project cost and duration in the construction of rock-fill dams. The earth allocation is a dynamic system affected by various time-space constraints. Based on previous studies, a new method of optimizing this dynamic system as a static one is presented. In order to build a generalized and flexible model of the problem, some man-made constraints were investigated in building the mathematic model. Linear programming and simplex method are introduced to solve the optimization problem of earth allocation. A case study in a large-scale rock-fill dam construction project is presented to demonstrate the proposed method and its successful application shows the feasibility and effectiveness of the method.
基金This study was supported by the National Natural Science Foundation of China(Grant Nos.51538001 and 51978019).
文摘This study focuses on the analytical prediction of subsurface settlement induced by shield tunnelling in sandy cobble stratum considering the volumetric deformation modes of the soil above the tunnel crown.A series of numerical analyses is performed to examine the effects of cover depth ratio(C/D),tunnel volume loss rate(h t)and volumetric block proportion(VBP)on the characteristics of subsurface settle-ment trough and soil volume loss.Considering the ground loss variation with depth,three modes are deduced from the volumetric deformation responses of the soil above the tunnel crown.Then,analytical solutions to predict subsurface settlement for each mode are presented using stochastic medium theory.The influences of C/D,h t and VBP on the key parameters(i.e.B and N)in the analytical expressions are discussed to determine the fitting formulae of B and N.Finally,the proposed analytical solutions are validated by the comparisons with the results of model test and numerical simulation.Results show that the fitting formulae provide a convenient and reliable way to evaluate the key parameters.Besides,the analytical solutions are reasonable and available in predicting the subsurface settlement induced by shield tunnelling in sandy cobble stratum.
文摘The leakage occurs during operation of the dam in Liuhuanggou reservoir. It’s a threat to the safety of the people’s lives and property in downstream. In order to eliminate the hidden danger of reservoir, ensure the safety of the dam, play better the function of flood control and water storage of the reservoir etc., we apply the 3D electrical resistivity tomography detecting technology and volume rendering image processing technology, make the measurement in field, process the data and combine the field survey to find out the leakage channels inside the dam. The results show that the 3D resistivity images appear the low resistivity zone corresponding with the leakage channels. There are two main leakage channels that come from different location inside the dam. It is feasible to diagnose the leakage in earth rock-fill dam by applying 3D electrical resistivity tomography.
文摘This paper compares the different inversion results of three different earth rock-fill dam models with the actual leakage passages by performing isotope tracing tests and resistivity tomographic tests. The accuracy of the experimental results is evaluated, and the characteristics of these two methods are analyzed. As a result, some significant references are offered for earth rock-fill dam’s hidden defects detection. The experimental results show that the leakage and the direction of the seepage can be judged by isotope tracing tests, meanwhile, the degree of the leakage can be confirmed through the determination of the horizontal seepage velocity and the vertical seepage velocity, but it is difficult to properly determine the position of leakage passages and the range of leakage. Relatively speaking, the positions of the leakage passages can be accurately and directly displayed through resistivity tomographic tests. The experiment results show that the resistivity tomographic method is much better than isotope tracing method with regard to earth rock-fill dam’s hidden defects detection, and the resistivity tomographic method expresses much more convenience and much higher precision than isotope tracing method.
文摘Based on the APDL (ANSYS Parametric Design Language) and combined with the actual project related to parameters of filling material, imported Duncan-Chang constitutive model which has been widely applied in soil mass and rock-fill in the ANSYS software. With the three-dimensional nonlinear finite element analysis by the mid-point incremental method, what have been computed are the deformation and stress analysis ofNa Ba reservoir CFRD (Concrete Face Rock-fill Dam) in filling period. The calculation results provide practical reference for the dam during construction safety filling stress and deformation analysis and real-time monitoring.
基金the National Natural Science Foundation of China(No.51974042)National Key Research and Development Program of China(No.2023YFC3009005).
文摘Ground hydraulic fracturing plays a crucial role in controlling the far-field hard roof,making it imperative to identify the most suitable target stratum for effective control.Physical experiments are conducted based on engineering properties to simulate the gradual collapse of the roof during longwall top coal caving(LTCC).A numerical model is established using the material point method(MPM)and the strain-softening damage constitutive model according to the structure of the physical model.Numerical simulations are conducted to analyze the LTCC process under different hard roofs for ground hydraulic fracturing.The results show that ground hydraulic fracturing releases the energy and stress of the target stratum,resulting in a substantial lag in the fracturing of the overburden before collapse occurs in the hydraulic fracturing stratum.Ground hydraulic fracturing of a low hard roof reduces the lag effect of hydraulic fractures,dissipates the energy consumed by the fracture of the hard roof,and reduces the abutment stress.Therefore,it is advisable to prioritize the selection of the lower hard roof as the target stratum.
文摘Shortly after tunneling,problems such as primary-support through cracks and clearance infringement are found in the shallow-buried section of tunnel No.4 of the Jakarta-Bandung High Speed Railway(Jakarta-Bandung HSR),and orthogonal cracks can be found on the earth surface in front of the working face,which brings great challenges to the tunnel construction.In view of the above engineering problems,the sliding surface is speculated according to the geological and field conditions,and the impact of landslides is applied in the model in the form of external load.The paper uses the numerical simulation method to analyze and compare the impact of landslides on the tunnel structure and deformation,and puts forward the reinforcement measures.The conclusions of the studies are:(1)under the influence of heavy rainfall,the strength index of volcanic deposit clay stratum drops sharply,and meanwhile the multiple factors including tunnel excavation are liable to cause sliding of the front slope;(2)parallel landslide in front of the tunnel has a great impact on the tunnel,so setting-up of pre-reinforcement measures to control landslide shall be the focus of similar projects during design;(3)the deformation and stress of the tunnel structure can be significantly controlled for safe construction by strengthening the shallow-buried tunnel with pile foundation and longitudinal and transverse beam frames during landslide.
基金the National Key R&D Program of China(No.2016YFC0801402)the National Natural Science Foundation of China(No.51874291).
文摘Mining causes stress redistribution and stratum movement.In this paper,a numerical model was built according to the geological conditions in the 12th coal mine in Pingdingshan city to study the strata movement and the evolution of stress when mining two overlapping longwall panels,named panels#14 and#15.The strata close to the mined panel move directly towards the gob,while the strata that are farther away swing back and forth during the mining process.The directed movement and swinging can break the transverse boreholes for gas extraction;a surface borehole should not be within the range of directional movement.The stress evolution suggested that the mining of the lower panel#15 after the upper panel#14 would further increase the de-stressed range,while the stress concentration around the mined panel would be increased.Hard strata usually carry a greater stress than adjacent rocks and soft coal seams.The stress in a hard stratum increases greatly,and the stress decreases greatly in the coal seams below the hard stratum.This study supplies a reference for similar coal mines and is useful for determining the de-stressed range and transverse borehole arrangement for gas extraction.
基金Projects 2005CB221503 supported by the National Basic Research Program of China70533050 and 50674089 by the National Natural Science Foundation of China2005BA813B-3-06 by the National Tenth 5-Year Key Scientific and Technological Project
文摘When an extremely thick rock bed exists above a protected coal seam in the bending zone given the condition of a mining protective seam, this extremely thick rock bed controls the movement of the entire overlying stratum. This extremely thick rock bed, called a "main key stratum", will not subside nor break for a long time, causing lower fractures and bed separations not to close and gas can migrate to the bed separation areas along the fractures. These bed separations become gas enrichment areas. By analyzing the rule of fracture evolution and gas migration under the main key stratum after the deep protective coal seam has been mined, we propose a new gas drainage method which uses bore holes, drilled through rock and coal seams at great depths for draining pressure relief gas. In this method, the bores are located at a high level suction roadway (we can also drill them in the drilling field located high in an air gateway). Given the practice in the Haizi mine, the gas drainage rate can reach 73% in the middie coal group, with a gas drainage radius over 100 m.
基金Project supported by the National Natural Science Foundation of China (No. 50478081).
文摘The torsional vibration of a rigid plate resting on saturated stratum overlaying bedrock has been analysed for the first time. The dynamic governing differential equations for saturated poroelastic medium are solved by employing the technology of Hankel transform. By taking into account the boundary conditions, the dual integral equations of torsional vibration of a rigid circular plate are established, which are further converted into a Fredholm integral equation of the second kind. Subsequently, the dynamic compliance coefficients of the foundation on saturated stratum, the contact shear stress under the foundation and the angular amplitude of the foundation are evaluated. Numerical results indicate that, when the dimensionless height is bigger than 5, saturated stratum overlaying bedrock can be treated as saturated half space approximately. When the dimensionless frequency is low, the permeability of the soil must be taken into account. Furthermore, when the vibration frequency is a constant, the height of the saturated stratum has a slight effect on the dimensionless contact shear stress under the foundation.