期刊文献+
共找到7篇文章
< 1 >
每页显示 20 50 100
Prediction of Concrete Faced Rock Fill Dams Settlements Using Genetic Programming Algorithm 被引量:3
1
作者 Seyed Morteza Marandi Seyed Mahmood VaeziNejad Elyas Khavari 《International Journal of Geosciences》 2012年第3期601-609,共9页
In the present study a Genetic Programing model (GP) proposed for the prediction of relative crest settlement of concrete faced rock fill dams. To this end information of 30 large dams constructed in seven countries a... In the present study a Genetic Programing model (GP) proposed for the prediction of relative crest settlement of concrete faced rock fill dams. To this end information of 30 large dams constructed in seven countries across the world is gathered with their reported settlements. The results showed that the GP model is able to estimate the dam settlement properly based on four properties, void ratio of dam’s body (e), height (H), vertical deformation modulus (Ev) and shape factor (Sc) of the dam. For verification of the model applicability, obtained results compared with other research methods such as Clements’s formula and the finite element model. The comparison showed that in all cases the GP model led to be more accurate than those of performed in literature. Also a proper compatibility between the GP model and the finite element model was perceived. 展开更多
关键词 concrete FACED rock-fill damS Settlement Genetic Programming ALGORITHM Finite Element Model
下载PDF
叶巴滩堆石混凝土二道坝温度应力仿真分析及温控措施研究
2
作者 赵厚然 徐艳杰 +2 位作者 赵恒 梁婷 金峰 《水资源与水工程学报》 CSCD 北大核心 2024年第2期167-173,182,共8页
对位于高海拔地区的叶巴滩堆石混凝土二道坝工程开展全坝段温度应力仿真分析,重点研究大坝横缝分缝措施和混凝土表面保温措施对坝体温度应力的影响。结果表明:结构分缝措施可以降低坝体内部拉应力,设置1条横缝即可有效控制坝体内部高拉... 对位于高海拔地区的叶巴滩堆石混凝土二道坝工程开展全坝段温度应力仿真分析,重点研究大坝横缝分缝措施和混凝土表面保温措施对坝体温度应力的影响。结果表明:结构分缝措施可以降低坝体内部拉应力,设置1条横缝即可有效控制坝体内部高拉应力区范围,并使应力极值降低约0.8 MPa;混凝土表面保温措施可在秋冬季节显著降低大坝表层混凝土温降幅度,减小表层温度应力水平,使应力极值降低约0.6 MPa;叶巴滩二道坝设置1条横缝并采取表面保温可满足施工期温控要求。 展开更多
关键词 堆石混凝土坝 温度应力 横缝 表面保温 高寒高海拔地区
下载PDF
堆石混凝土坝概述及下一代混凝土坝施工技术展望
3
作者 Feng Jin Duruo Huang +1 位作者 Michel Lino Hu Zhou 《Engineering》 SCIE EI CAS CSCD 2024年第1期99-105,共7页
Over the past few decades,one of the most significant advances in dam construction has been the inven-tion of the rock-filled concrete(RFC)dam,which is constructed by pouring high-performance self-compacting concrete(... Over the past few decades,one of the most significant advances in dam construction has been the inven-tion of the rock-filled concrete(RFC)dam,which is constructed by pouring high-performance self-compacting concrete(HSCC)to fill the voids in preplaced large rocks.The innovative use of large rocks in dam construction provides engineers with a material that requires less cement consumption and hydration heat while enhancing construction efficiency and environmental friendliness.However,two fundamental scientific issues related to RFC need to be addressed:namely,the pouring compactness and the effect of large rocks on the mechanical and physical properties of RFC.This article provides a timely review of fundamental research and innovations in the design,construction,and quality control of RFCdams.Prospects for next-generation concrete dams are discussed from the perspectives of envi-ronmental friendliness,intrinsic safety,and labor savings. 展开更多
关键词 rock-filled concrete dam Pouring compactness Effect of large rocks Intelligent quality control Unmanned dam construction
下载PDF
Key technical problems of extra-high concrete faced rock-fill dam 被引量:2
4
作者 MA HongQi1? & CAO KeMing2 1Yunnan Huaneng Lancang River Hydropower Co., Ltd., Kunming 650011, China 2East China Investigation, Design & Research Institute, Hangzhou 310014, China 《Science China(Technological Sciences)》 SCIE EI CAS 2007年第z1期20-33,共14页
This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete ... This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete faced rock-fill dams. This paper has raised the key technical problems which need to study for construction of 300 m-height-scale concrete faced rock-fill dams based on the main experiences on the extra-high concrete faced rock-fill dams built after the year of 2000. 展开更多
关键词 concrete FACED rock-fill dam extra-high dam KEY TECHNOLOGY
原文传递
Influence of soft rock-fill material as dam embankment with central bituminous concrete membrane
5
作者 Peter TSCHERNUTTER 《Frontiers of Structural and Civil Engineering》 SCIE EI 2011年第1期63-70,共8页
This paper demonstrates the difficulties in determining the relevant material parameters for a valuation of the deformation behavior of the up-and downstream dam shell by means of an embankment dam of medium height.La... This paper demonstrates the difficulties in determining the relevant material parameters for a valuation of the deformation behavior of the up-and downstream dam shell by means of an embankment dam of medium height.Laboratory as well as field tests on solid rock-fill material were performed before the beginning of construction.During the construction the properties of the available rock-fill changed from solid to soft materials.This gave rise to the necessity of adjusting the dam design of the downstream dam shoulder.Several times higher dam settlements as well as significant differential settlements between the up-and downstream dam shell were observed during construction and operation.Apart from this situation,the dam has been operated for nearly 20 years and the behavior of the water barrier has been very good. 展开更多
关键词 embankment dam bituminous concrete membrane rock-fill material properties deformation behavior
原文传递
堆石混凝土系列技术在西部水电工程中的应用 被引量:14
6
作者 金峰 周虎 +1 位作者 李玲玉 黄杜若 《水电与抽水蓄能》 2021年第1期16-22,共7页
堆石混凝土技术可以充分利用当地石料,环境友好,经济性好,工艺简单,建造速度快,已在工程中得到快速推广应用。截至2020年底,已新建、在建堆石混凝土大坝114座,其中,重力坝104座,拱坝10座,最大坝高90m。基于堆石混凝土基础研究,相继发明... 堆石混凝土技术可以充分利用当地石料,环境友好,经济性好,工艺简单,建造速度快,已在工程中得到快速推广应用。截至2020年底,已新建、在建堆石混凝土大坝114座,其中,重力坝104座,拱坝10座,最大坝高90m。基于堆石混凝土基础研究,相继发明的水下自护混凝土与自流控制灌浆技术,可以在水下施工、地基处理、大坝加固等诸多领域应用。本文介绍了堆石混凝土系列新技术在佰佳、沙坪二级、野三河、龙背湾、斜卡等西部水电工程中的应用,可以为工程技术人员提供参考。 展开更多
关键词 堆石混凝土 水下自护混凝土 自流控制灌浆 大坝 除险加固
下载PDF
利用堆石混凝土替代浆砌石实施坝体施工的技术难点与应用前景分析 被引量:12
7
作者 张磊 《水利水电技术》 CSCD 北大核心 2010年第7期49-52,56,共5页
利用堆石混凝土替代砂浆砌筑技术实施浆砌石坝体施工,提高了坝体施工的机械化程度,加快了施工进度;减少了人为因素影响,对保证工程质量有利。但通过现场测试取得的堆石混凝土抗剪断指标很少,当前一般参照浆砌石坝体的相关抗剪经验... 利用堆石混凝土替代砂浆砌筑技术实施浆砌石坝体施工,提高了坝体施工的机械化程度,加快了施工进度;减少了人为因素影响,对保证工程质量有利。但通过现场测试取得的堆石混凝土抗剪断指标很少,当前一般参照浆砌石坝体的相关抗剪经验资料进行工程设计,可能导致坝体断面不尽合理;施工中如何保证石料的上坝质量和强度、确保上下层面的衔接质量、机械上料对已完坝体不产生较大不利影响等是堆石混凝土代替浆砌石在坝体施工中得以推广的关键。 展开更多
关键词 自密实混凝土 堆石混凝土 浆砌石坝 应用前景
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部