Based on the construction interfaces in rolled control concrete dam(RCCD), the methods were proposed to calculate the influence thickness of construction interfaces and the corresponding physical mechanics parameters....Based on the construction interfaces in rolled control concrete dam(RCCD), the methods were proposed to calculate the influence thickness of construction interfaces and the corresponding physical mechanics parameters. The principle on establishing the coupling model of seepage_field and stress_field for RCCD was presented. A 3_D Finite Element Method(FEM) program was developed. Study shows that such parameters as the thickness of construction interfaces,the elastic ratio and the (Poisson's) ratio obtained by tests and theoretical analysis are more reasonable, the coupling model of seepage_field and stress_field for RCCD may indicate the coupling effect between the two fields scientifically, and the developed 3_D FEM program can reflect the effect of the construction interfaces more adequately. According to the study, many scientific opinions are given both to analyze the influence of the construction interfaces to the (dam's) characteristic, and to reveal the interaction between the stress_field and the seepage_field.展开更多
The effect zones of layer face for RCC (rolled control concrete) dam have gradual change characteristics. Based on the analysis thought of complex material, a model was built to analyze above principle of RCC dam by...The effect zones of layer face for RCC (rolled control concrete) dam have gradual change characteristics. Based on the analysis thought of complex material, a model was built to analyze above principle of RCC dam by use of series-wound and shunt-wound connection. Some methods were proposed to determine the instantaneous Young's modulus, delayed Young's modulus and viscosity coefficient of effect zones of layer face. Above models and methods were used to mine the principle of gradual change of key calculation parameters which can response the characteristics of effect zones. The principle of gradual change was described. A model was established to analyze the threedimensional viscoelastic problem of RCC dam. Above programs were developed. The examples show that the proposed models and methods to determine the key calculation parameters of effect zones can reflect the status of RCC dam accurately.展开更多
Based on raw data from dams damaged in the Wenchuan earthquake, including many that were severely damaged, characteristics and factors that influenced the damage are discussed in this paper. Findings from this study i...Based on raw data from dams damaged in the Wenchuan earthquake, including many that were severely damaged, characteristics and factors that influenced the damage are discussed in this paper. Findings from this study include: severely damaged dams were densely distributed along the seismologic fault; small dams, especially small earth-rock dams, had the most serious damage that was caused by a variety of factors; the most serious damage was caused by seismic waves; damage was aggregated by aftershocks; and the extent of the damage patterns increased with the seismic intensity. Damage patterns varied in different intensity zones and cracking was the most common type of damage. Most of the dams had a good base with relatively high bearing capacity, and the walls of the earth-rock dams were mostly of clay soil. This type of base and body material mitigated some of the damage to dams. Reservoir maintenance and other factors also have a significant impact on the seismic safety of the dam. Finally, some recommendations to reduce seismic damage to dams are proposed.展开更多
A scheme for identifying rolling layers in roller-compacted concrete (RCC) dam automatically was presented. First, a conceptual model was developed. Second, by using a computational geometry method, the auto identific...A scheme for identifying rolling layers in roller-compacted concrete (RCC) dam automatically was presented. First, a conceptual model was developed. Second, by using a computational geometry method, the auto identification of rolling layers and auto matching between rolling compaction machines and rolling layers were realized based on spatial control points. An application to the construction of Guandi RCC dam showed that the auto identification of rolling layers played an important role in ensuring the engineering quality.展开更多
In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis c...In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis curve is also considered when the earth is under cyclic load. The research work can make the calculation results of plastic collapse more accurate by including the effect of the post-earthquake degree of plastic deformation on the stability of the earth-rock dam, and the dam safety factor decreases from 2.50 to 1.90 after the magnitude-8 earthquake. Moreover, the research work will also improve the design of the earth-rock dam under abnormal operating conditions.展开更多
During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progres...During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progresses.Accurate identification of the risk factors,as well as clearing any possible effect that any risk factors might have on the construction project is the key and foundation to our cooperative control of the construction goals.According to the construction planning of earth-rock dam,the hall3 D structure was used to identify the potential changes of risk factors,and the possible means of any risk factors to interfere with the construction goals.The dynamic risk assessment index system is established by deploying the WBS-RBS(work breakdown structurerisk breakdown structure)method,aiming at the construction goals of earth-rock dam.The case study shows that the index system is very effective at risk management of earth-rock dam during construction,and relatively practicable.展开更多
Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- d...Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- dropower projects, the life-cycle risk management system of high earth-rock dam project for Nuozhadu project was developed. The system mainly includes digital dam, three-dimensional design, construction quality monito- ring, safety assessment and warning, etc, to integrally manage and analyze the dam design, constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safe- ty quality monitoring in the project life cycle, and provided the basic platform for the scientific management of the construction and operation safety of high earth-rock dam. Application in Nuozhadu earth-rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality, and provided a new way for the quality safety control of high earth-rock dam.展开更多
The electromagnetic dam (EMD) in twin-roll strip caster was simulated with FEM. The results show that the direction and magnitude of Lorentz force distributing in the EMD changed in a period. The negative part is ab...The electromagnetic dam (EMD) in twin-roll strip caster was simulated with FEM. The results show that the direction and magnitude of Lorentz force distributing in the EMD changed in a period. The negative part is about 30% of the positive part, and the acting time of the negative force is about 40% of a period. In order to prevent the liquid steel from leaking efficiently, the distance between two poles should be the same from the top to the bottom of the EMD, otherwise the magnetic induction will be very small at the top and large at the bottom.展开更多
Reducing wear on a side dam can prolong the casting operation life of a twin-roll strip casting process,thus reducing production cost and improving casting stability.To lengthen the service life of the side dam,it is ...Reducing wear on a side dam can prolong the casting operation life of a twin-roll strip casting process,thus reducing production cost and improving casting stability.To lengthen the service life of the side dam,it is necessary to understand the wear performance of the side dam material.To investigate the wear behavior mechanism of the side dam,in this study,the UMT-2 friction and wear tester was used to determine the relationship between the wear rate of the side-dam material and various parameters.Based on the roughness of the contact area between the side dam and the end of the casting rolls as well as on the amount of deformation of the side dam,which was derived using a thermal-deformation simulation model,the reasons for the uneven wear of the side dam were obtained.展开更多
文摘Based on the construction interfaces in rolled control concrete dam(RCCD), the methods were proposed to calculate the influence thickness of construction interfaces and the corresponding physical mechanics parameters. The principle on establishing the coupling model of seepage_field and stress_field for RCCD was presented. A 3_D Finite Element Method(FEM) program was developed. Study shows that such parameters as the thickness of construction interfaces,the elastic ratio and the (Poisson's) ratio obtained by tests and theoretical analysis are more reasonable, the coupling model of seepage_field and stress_field for RCCD may indicate the coupling effect between the two fields scientifically, and the developed 3_D FEM program can reflect the effect of the construction interfaces more adequately. According to the study, many scientific opinions are given both to analyze the influence of the construction interfaces to the (dam's) characteristic, and to reveal the interaction between the stress_field and the seepage_field.
基金Project supported by the National Natural Science Foundation of China (Nos.50579010, 50539010)the National Basic Research Program of China (973 Program) (No.2002CB412707)the National Basic Research Program of Ministry of Water Resources, China (No.CT200612)
文摘The effect zones of layer face for RCC (rolled control concrete) dam have gradual change characteristics. Based on the analysis thought of complex material, a model was built to analyze above principle of RCC dam by use of series-wound and shunt-wound connection. Some methods were proposed to determine the instantaneous Young's modulus, delayed Young's modulus and viscosity coefficient of effect zones of layer face. Above models and methods were used to mine the principle of gradual change of key calculation parameters which can response the characteristics of effect zones. The principle of gradual change was described. A model was established to analyze the threedimensional viscoelastic problem of RCC dam. Above programs were developed. The examples show that the proposed models and methods to determine the key calculation parameters of effect zones can reflect the status of RCC dam accurately.
基金Special Scientific Found for Seismic Industry Under Grant No.201008005
文摘Based on raw data from dams damaged in the Wenchuan earthquake, including many that were severely damaged, characteristics and factors that influenced the damage are discussed in this paper. Findings from this study include: severely damaged dams were densely distributed along the seismologic fault; small dams, especially small earth-rock dams, had the most serious damage that was caused by a variety of factors; the most serious damage was caused by seismic waves; damage was aggregated by aftershocks; and the extent of the damage patterns increased with the seismic intensity. Damage patterns varied in different intensity zones and cracking was the most common type of damage. Most of the dams had a good base with relatively high bearing capacity, and the walls of the earth-rock dams were mostly of clay soil. This type of base and body material mitigated some of the damage to dams. Reservoir maintenance and other factors also have a significant impact on the seismic safety of the dam. Finally, some recommendations to reduce seismic damage to dams are proposed.
基金Supported by Foundation for Innovative Research Groups of National Natural Science Foundation of China (No. 51021004)National Natural Science Foundation of China (No. 50879056)Key Project in the National Science and Technology Pillar Program during the Eleventh Five-Year Plan Period(No. 2008BAB29B05)
文摘A scheme for identifying rolling layers in roller-compacted concrete (RCC) dam automatically was presented. First, a conceptual model was developed. Second, by using a computational geometry method, the auto identification of rolling layers and auto matching between rolling compaction machines and rolling layers were realized based on spatial control points. An application to the construction of Guandi RCC dam showed that the auto identification of rolling layers played an important role in ensuring the engineering quality.
文摘In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis curve is also considered when the earth is under cyclic load. The research work can make the calculation results of plastic collapse more accurate by including the effect of the post-earthquake degree of plastic deformation on the stability of the earth-rock dam, and the dam safety factor decreases from 2.50 to 1.90 after the magnitude-8 earthquake. Moreover, the research work will also improve the design of the earth-rock dam under abnormal operating conditions.
基金National Natural Science Foundation of China(No.51379192)
文摘During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progresses.Accurate identification of the risk factors,as well as clearing any possible effect that any risk factors might have on the construction project is the key and foundation to our cooperative control of the construction goals.According to the construction planning of earth-rock dam,the hall3 D structure was used to identify the potential changes of risk factors,and the possible means of any risk factors to interfere with the construction goals.The dynamic risk assessment index system is established by deploying the WBS-RBS(work breakdown structurerisk breakdown structure)method,aiming at the construction goals of earth-rock dam.The case study shows that the index system is very effective at risk management of earth-rock dam during construction,and relatively practicable.
文摘Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- dropower projects, the life-cycle risk management system of high earth-rock dam project for Nuozhadu project was developed. The system mainly includes digital dam, three-dimensional design, construction quality monito- ring, safety assessment and warning, etc, to integrally manage and analyze the dam design, constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safe- ty quality monitoring in the project life cycle, and provided the basic platform for the scientific management of the construction and operation safety of high earth-rock dam. Application in Nuozhadu earth-rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality, and provided a new way for the quality safety control of high earth-rock dam.
文摘The electromagnetic dam (EMD) in twin-roll strip caster was simulated with FEM. The results show that the direction and magnitude of Lorentz force distributing in the EMD changed in a period. The negative part is about 30% of the positive part, and the acting time of the negative force is about 40% of a period. In order to prevent the liquid steel from leaking efficiently, the distance between two poles should be the same from the top to the bottom of the EMD, otherwise the magnetic induction will be very small at the top and large at the bottom.
文摘Reducing wear on a side dam can prolong the casting operation life of a twin-roll strip casting process,thus reducing production cost and improving casting stability.To lengthen the service life of the side dam,it is necessary to understand the wear performance of the side dam material.To investigate the wear behavior mechanism of the side dam,in this study,the UMT-2 friction and wear tester was used to determine the relationship between the wear rate of the side-dam material and various parameters.Based on the roughness of the contact area between the side dam and the end of the casting rolls as well as on the amount of deformation of the side dam,which was derived using a thermal-deformation simulation model,the reasons for the uneven wear of the side dam were obtained.