Roller Compacted Concrete (RCC) has gained favorable recognition in hydropower and water resource dam construction. With optimization in construction technology and materials used for RCC Dams, cost is no longer a maj...Roller Compacted Concrete (RCC) has gained favorable recognition in hydropower and water resource dam construction. With optimization in construction technology and materials used for RCC Dams, cost is no longer a major disadvantage as compared to environmental impact, that is, wildlife habitat disruption. In as much as it has become optimal for investment in hydropower dam construction, the scourge for dam failure is still eminent, which is as a result of excessive seepage compromising the integrity of the mechanical properties of the dam. The aim of the paper is to highlight successful application methods in joint bonding to avoid excessive seepage and reduce the autogenous healing to a few years of operation. In view of optimization, this paper presents a comprehensive study on the influences of interlayer joints bonding quality from RCC mix performances and how it consolidates the RCC layers to withstand the shear strength along the interface, especially on the high dams. The case study is the RCC dam at the 750 MW Kafue Gorge Lower Hydropower Station. The scope of the study reviews the joint type judged by Modified Maturity Factor (MMF) with joint surface long time exposed in regions with dry and high temperature, technical measures of layer bonding quality control under condition of long time joint surface exposure, effects of joints shear strength and impermeability of the RCC layers when under the conditions of plastic and elasticity. The subtle observations made during the dam construction phases were with respect to the optimal use of materials in relation to RCC mix designs and the basis for equipment calibration for monitoring important data that can be referenced during analysis of shear forces acting on the RCC dam over time.展开更多
This research investigated the use of wood ash to partially replace cement or sand in conventional concrete, roller compacted concrete (RCC), and flowable fill. The main focus was to determine how the wood ash additio...This research investigated the use of wood ash to partially replace cement or sand in conventional concrete, roller compacted concrete (RCC), and flowable fill. The main focus was to determine how the wood ash addition affected the main fresh and hardened properties of these materials. It was found that the wood ash could be successfully incorporated into the conventional concrete. In particular, the wood ash addition not only accelerated the setting, but also improved the early and the 28-day compressive strength of concrete that contained the blast furnace slag. It was also observed that the wood ash could be positively added into RCC to facilitate the compaction and reduce the risk of segregation. In addition, the wood ash can be beneficially introduced into the flowable fill mixtures to facilitate flow, to alleviate bleeding and subsidence, as well as to achieve controlled strength especially when combined with the class C or the class F fly ash.展开更多
A new roller compacted concrete dam of Fengman Hydropower Station is to be built in the toe of the old dam,which was identified as a dangerous dam.The new dam during construction would be influenced by the high-speed ...A new roller compacted concrete dam of Fengman Hydropower Station is to be built in the toe of the old dam,which was identified as a dangerous dam.The new dam during construction would be influenced by the high-speed flow discharged from the old dam,which is an important problem to be considered for the first time in China,and which would affect the construction of the whole project.Therefore,a series of erosion experiments were conducted in this article.A high-speed flow erosion test apparatus was developed for the erosion experiments of the new dam materials.The maximum jet velocity goes up to 40 m/s and the section area of the nozzle is 0.0025 m2.In the process of experiments,the equipment shows a good performance.Erosive wear tests for two types of materials used in the new dam,a roller compacted concrete and a distorted concrete with four kinds of ages were carried out with the flow velocity in the range of 30 m/s-35 m/s.Erosion parameters and erosion laws for the two types of concretes with different ages were determined,and a general relationship between the erosion rate and the flow velocity is obtained as:,with the velocity exponent between 3.33 and 3.93.It is concluded that the erosion resistance of the distorted concrete is better than that of the roller compacted concrete and the mechanical properties of the concretes of over 14 d age are influenced slightly by the water impact.The test results might serve as a practical technique guide for the safety of this project during its construction in the flood season.展开更多
The new structure of roller compacted concrete (RCC) arch dams is presented for extremely cold and earthquake prone areas. The influence of construction plans and improved materials on the stresses in the Taxi River ...The new structure of roller compacted concrete (RCC) arch dams is presented for extremely cold and earthquake prone areas. The influence of construction plans and improved materials on the stresses in the Taxi River dam is also given. Earlier impoundment of water is shown to not only benefit the engineering design but also improve the stresses during construction in winter. Low cement content in the concrete and artificial short joints improved the monolithic structure and the transmitted forces. The concrete plug installed in the first cooled part of the arch dam provides excellent force transmission in the arch, which increases the monolith of the earlier arch, reduces the increasing thermal stresses that occur later, and improves the deformation flexibility of the dam.展开更多
Taking account of the fuzzy results of the seepage monitoring analysis of roller compacted concrete(RCC)dam and uncertainties of the individual indicator evaluation,the fuzzy matter-element model of seepage monitoring...Taking account of the fuzzy results of the seepage monitoring analysis of roller compacted concrete(RCC)dam and uncertainties of the individual indicator evaluation,the fuzzy matter-element model of seepage monitoring of RCC dam analysis has been established with the use of the fuzzy matter-element analysis theory and the concept of euclid approach degree.The use of entropy theory can calculate the weighting factor through the disorder utility values of the information reflected by the data itself,which can effectively avoid the problems of weight distribution and uncertainties of subjective judgments of the seepage monitoring analysis of roller compacted concrete dam.And further the example shows that the analysis of entropy-based fuzzy matter-element analysis model of the seepage monitoring of roller compacted concrete dam is in accordance with the actual situation,which verifies the effectiveness of the method.展开更多
文摘Roller Compacted Concrete (RCC) has gained favorable recognition in hydropower and water resource dam construction. With optimization in construction technology and materials used for RCC Dams, cost is no longer a major disadvantage as compared to environmental impact, that is, wildlife habitat disruption. In as much as it has become optimal for investment in hydropower dam construction, the scourge for dam failure is still eminent, which is as a result of excessive seepage compromising the integrity of the mechanical properties of the dam. The aim of the paper is to highlight successful application methods in joint bonding to avoid excessive seepage and reduce the autogenous healing to a few years of operation. In view of optimization, this paper presents a comprehensive study on the influences of interlayer joints bonding quality from RCC mix performances and how it consolidates the RCC layers to withstand the shear strength along the interface, especially on the high dams. The case study is the RCC dam at the 750 MW Kafue Gorge Lower Hydropower Station. The scope of the study reviews the joint type judged by Modified Maturity Factor (MMF) with joint surface long time exposed in regions with dry and high temperature, technical measures of layer bonding quality control under condition of long time joint surface exposure, effects of joints shear strength and impermeability of the RCC layers when under the conditions of plastic and elasticity. The subtle observations made during the dam construction phases were with respect to the optimal use of materials in relation to RCC mix designs and the basis for equipment calibration for monitoring important data that can be referenced during analysis of shear forces acting on the RCC dam over time.
文摘This research investigated the use of wood ash to partially replace cement or sand in conventional concrete, roller compacted concrete (RCC), and flowable fill. The main focus was to determine how the wood ash addition affected the main fresh and hardened properties of these materials. It was found that the wood ash could be successfully incorporated into the conventional concrete. In particular, the wood ash addition not only accelerated the setting, but also improved the early and the 28-day compressive strength of concrete that contained the blast furnace slag. It was also observed that the wood ash could be positively added into RCC to facilitate the compaction and reduce the risk of segregation. In addition, the wood ash can be beneficially introduced into the flowable fill mixtures to facilitate flow, to alleviate bleeding and subsidence, as well as to achieve controlled strength especially when combined with the class C or the class F fly ash.
基金supported by the National Natural Science Foundation of China(Grant No.51109143)the 11th Five Year Plan National Key Programs for Science and Technology Development of China(Grant No.2009BAK56B04)the Natural Science Foundation of Jiangsu Province(Grant No.BK2011109).
文摘A new roller compacted concrete dam of Fengman Hydropower Station is to be built in the toe of the old dam,which was identified as a dangerous dam.The new dam during construction would be influenced by the high-speed flow discharged from the old dam,which is an important problem to be considered for the first time in China,and which would affect the construction of the whole project.Therefore,a series of erosion experiments were conducted in this article.A high-speed flow erosion test apparatus was developed for the erosion experiments of the new dam materials.The maximum jet velocity goes up to 40 m/s and the section area of the nozzle is 0.0025 m2.In the process of experiments,the equipment shows a good performance.Erosive wear tests for two types of materials used in the new dam,a roller compacted concrete and a distorted concrete with four kinds of ages were carried out with the flow velocity in the range of 30 m/s-35 m/s.Erosion parameters and erosion laws for the two types of concretes with different ages were determined,and a general relationship between the erosion rate and the flow velocity is obtained as:,with the velocity exponent between 3.33 and 3.93.It is concluded that the erosion resistance of the distorted concrete is better than that of the roller compacted concrete and the mechanical properties of the concretes of over 14 d age are influenced slightly by the water impact.The test results might serve as a practical technique guide for the safety of this project during its construction in the flood season.
文摘The new structure of roller compacted concrete (RCC) arch dams is presented for extremely cold and earthquake prone areas. The influence of construction plans and improved materials on the stresses in the Taxi River dam is also given. Earlier impoundment of water is shown to not only benefit the engineering design but also improve the stresses during construction in winter. Low cement content in the concrete and artificial short joints improved the monolithic structure and the transmitted forces. The concrete plug installed in the first cooled part of the arch dam provides excellent force transmission in the arch, which increases the monolith of the earlier arch, reduces the increasing thermal stresses that occur later, and improves the deformation flexibility of the dam.
基金supported by the National Science and Technology Support Plan of China(Nos.2006BAC14B03,2008BAB29B06,2008BAB29B03)the Jiangsu Province 333Training High-Level Talents Projects(No.2017-B08037)the National Natural Science Foundation of China(Grant Nos.50539010,50539110,50809025,50539030-1-3)。
文摘Taking account of the fuzzy results of the seepage monitoring analysis of roller compacted concrete(RCC)dam and uncertainties of the individual indicator evaluation,the fuzzy matter-element model of seepage monitoring of RCC dam analysis has been established with the use of the fuzzy matter-element analysis theory and the concept of euclid approach degree.The use of entropy theory can calculate the weighting factor through the disorder utility values of the information reflected by the data itself,which can effectively avoid the problems of weight distribution and uncertainties of subjective judgments of the seepage monitoring analysis of roller compacted concrete dam.And further the example shows that the analysis of entropy-based fuzzy matter-element analysis model of the seepage monitoring of roller compacted concrete dam is in accordance with the actual situation,which verifies the effectiveness of the method.