To establish the movement relationship for the roof breaking under shallow mining conditions, the mechanical model of the roof rock beam was built, then the structure instability process of the roof rock beam was anal...To establish the movement relationship for the roof breaking under shallow mining conditions, the mechanical model of the roof rock beam was built, then the structure instability process of the roof rock beam was analyzed. The changing criterion of the vertical displacement was established and the relationship between the deflection and the rotary motion of roof block was determined. Regarding a mining face in Shangwan Mine, the responsing laws of the deflection and horizontal thrust of the roof rock beam were obtained through FLAC3D numerical analysis. The results show that the structure instability of the cracked roof rock beam depends on the interaction between the vertical load and the horizontal thrust.For the roof rock beam, when the vertical load keeps constant, the horizontal thrust fluctuating rises with increasing deflection. The horizontal thrust increases constantly with the deeper buried depth and the smaller span.展开更多
This paper explores the deformation mechanism and control technology of roof pre-splitting for gob-side entries in hard roof full-mechanized longwall caving panel(LTCC).The investigation utilizes a comprehensive appro...This paper explores the deformation mechanism and control technology of roof pre-splitting for gob-side entries in hard roof full-mechanized longwall caving panel(LTCC).The investigation utilizes a comprehensive approach that integrates field monitoring,theoretical analysis,and numerical simulation.Theoretical analysis has illuminated the influence of the length of the lateral cantilever beam of the main roof(LCBM)above the roadway on the stability of the gob-side entry behind the panel.Numerical simulations have further revealed that the longer LCBM results in heightened vertical stress within the coal pillar,developed cracks around the roadway,and more pronounced damage to the roadway.Moreover,numerical simulations also demonstrate the potential of roof pre-splitting technology in optimizing the fracture position of the hard roof.This technology significantly reduces the length of the LCBM,thereby alleviating stress concentration in the coal pillars and integrated coal rib while minimizing the destruction of the gob-side entry.Therefore,this manuscript first proposes the use of roof pre-splitting technology to control roadway deformation,and automatically retain the entry within a hard roof LTCC panel.Field implementation has demonstrated that the proposed automatically retained entry by roof pre-splitting technology effectively reduces gob-side entry deformation and achieves automatically retained entry.展开更多
Based upon characteristic movement features of the overlying strata in solid backfill mining and in-situ observations,an associated model representing a roadway support system has been developed.Based on the Winkler f...Based upon characteristic movement features of the overlying strata in solid backfill mining and in-situ observations,an associated model representing a roadway support system has been developed.Based on the Winkler foundation and beam model,the current study presents a static analysis of the model,thus permitting acquisition of a theoretical formula pertaining to roof convergence.Through use of working face 6304-1(Jisan Colliery) as the research setting,the association between roof convergence magnitude and both packwall strength and width have been elucidated.Based upon observed conditions at the working face,realistic packwall parameters have been formulated,with numerical simulation results and field application results indicating that design parameters garnered from the developed formula successfully adapted to local geological movement and deformation.Accordingly,roadway deformation was shown to be within the permissible range,thus satisfying mine production requirements.The proposed method in the current study may give a design basis for pack design in the context of SBM under similar conditions.展开更多
基金supported by the National Natural Science Foundation of China (Nos. 51474188, 51074140, and 51774112)the Natural Science Foundation of Hebei Province of China (No. E2014203012)+4 种基金the International Cooperation Project of Henan Science and Technology Department (No. 182102410060)International Cooperative Talent Project of Henan Province (No. 2016GH22)the Doctoral Fund of Henan Polytechnic University of China (No. B2015-67)the Research Fund of State and Local Joint Engineering Laboratory for Gas Drainage & Ground Control of Deep Mines (Henan Polytechnic niversity)of China (No. G201614)Taihang Scholars Program
文摘To establish the movement relationship for the roof breaking under shallow mining conditions, the mechanical model of the roof rock beam was built, then the structure instability process of the roof rock beam was analyzed. The changing criterion of the vertical displacement was established and the relationship between the deflection and the rotary motion of roof block was determined. Regarding a mining face in Shangwan Mine, the responsing laws of the deflection and horizontal thrust of the roof rock beam were obtained through FLAC3D numerical analysis. The results show that the structure instability of the cracked roof rock beam depends on the interaction between the vertical load and the horizontal thrust.For the roof rock beam, when the vertical load keeps constant, the horizontal thrust fluctuating rises with increasing deflection. The horizontal thrust increases constantly with the deeper buried depth and the smaller span.
基金Project(52104139)supported by the National Natural Science Foundation of China Youth Science FoundationProject(SKLGDUEK2132)supported by the State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining and Technology/China University of Mining and Technology-BeijingProjects([2020]2Y030,[2020]2Y019,[2020j3007,[2020]3008,and[2022j0il]supported by the Guizhou Province Science and Technology Planning,China Project(2022B01051)supported by the Key Research and Development Special Tasks of Xinjiang,China。
文摘This paper explores the deformation mechanism and control technology of roof pre-splitting for gob-side entries in hard roof full-mechanized longwall caving panel(LTCC).The investigation utilizes a comprehensive approach that integrates field monitoring,theoretical analysis,and numerical simulation.Theoretical analysis has illuminated the influence of the length of the lateral cantilever beam of the main roof(LCBM)above the roadway on the stability of the gob-side entry behind the panel.Numerical simulations have further revealed that the longer LCBM results in heightened vertical stress within the coal pillar,developed cracks around the roadway,and more pronounced damage to the roadway.Moreover,numerical simulations also demonstrate the potential of roof pre-splitting technology in optimizing the fracture position of the hard roof.This technology significantly reduces the length of the LCBM,thereby alleviating stress concentration in the coal pillars and integrated coal rib while minimizing the destruction of the gob-side entry.Therefore,this manuscript first proposes the use of roof pre-splitting technology to control roadway deformation,and automatically retain the entry within a hard roof LTCC panel.Field implementation has demonstrated that the proposed automatically retained entry by roof pre-splitting technology effectively reduces gob-side entry deformation and achieves automatically retained entry.
基金financial support from the Fundamental Research Funds for the Central Universities(China University of Mining and Technology)under Grant 2014ZDPY02Qing Lan Project
文摘Based upon characteristic movement features of the overlying strata in solid backfill mining and in-situ observations,an associated model representing a roadway support system has been developed.Based on the Winkler foundation and beam model,the current study presents a static analysis of the model,thus permitting acquisition of a theoretical formula pertaining to roof convergence.Through use of working face 6304-1(Jisan Colliery) as the research setting,the association between roof convergence magnitude and both packwall strength and width have been elucidated.Based upon observed conditions at the working face,realistic packwall parameters have been formulated,with numerical simulation results and field application results indicating that design parameters garnered from the developed formula successfully adapted to local geological movement and deformation.Accordingly,roadway deformation was shown to be within the permissible range,thus satisfying mine production requirements.The proposed method in the current study may give a design basis for pack design in the context of SBM under similar conditions.