Composite active control system of roof and side truss cable for large section coal roadway in fold coal pillar area 被引量:5
1
作者 Sheng-Rong XIE Er-Peng LI Fu-Lian HE Shou-Bao ZHANG Guang-Chao ZHANG Mao-Yu PANG 《Journal of Coal Science & Engineering(China)》 2013年第2期126-132,共7页
In order to solve the surrounding rock control problem of large section gangue replacement roadway under complicated conditions, this paper analyzed the impact to the roadway controlling produced by the geological con... In order to solve the surrounding rock control problem of large section gangue replacement roadway under complicated conditions, this paper analyzed the impact to the roadway controlling produced by the geological conditions such as high ground stress, folded structure tilted roof asymmetry and soft wall rock, and built the tilt layered roof structural mechanics model to clarify the increase span mechanism of the weak coal instability. Then, we proposed the combined control system including roof inclined truss cable, coal-side cable-channel steel and intensive bolt support. And then by building the structural mechanics model of roof inclined truss cable system, the support principle was described. Besides, according to this model, we deduced the calculation formula of cable anchoring force and its tensile stress. Finally surrounding rock control technology of large section roadway in fold coal pillar area was formed. Field practice shows that the greatest roof convergence of gangue replacement roadway is 158 mm and coal-side deformation is 243 mm. Roadway deformation is controlled effectively and technical support is provided for replacement mining. 展开更多
关键词 fold coal pillar area increase span mechanism roof inclined truss cable system coal-side cable-channel steel structural mechanics model
下载PDF
Structural behaviors of steel roof truss exposed to pool fire 被引量:1
2
作者 陈长坤 张威 《Journal of Central South University》 SCIE EI CAS 2012年第7期2054-2060,共7页
Experimental research was conducted to study the structural behaviors of a steel roof truss model without fire-proof coating under pool fire conditions. The data of temperature distribution and displacements of typica... Experimental research was conducted to study the structural behaviors of a steel roof truss model without fire-proof coating under pool fire conditions. The data of temperature distribution and displacements of typical members were obtained. It is found that the temperature distribution of environment inside the structure, which is found to be in accordance with the multi-zone model with height, has a decisive effect on the tempera^tre evolution of steel members. Besides, it can also be observed that due to the restriction and coordination among the truss members in the localized fire, the maximum relative deflection, which occurs at the mid-span of the top chord, is relatively slight and has not exceeded 1 mm under experimental conditions. On the other hand, the column experiences a notable thermal expansion during the test. Then, a finite element model is presented and validated by the test results. 展开更多
关键词 steel roof truss fire test multi-zone model finite element analysis
下载PDF
Vertical load capacities of roof truss cross members
3
作者 Gearhart David F. Mohamed Khaled Morsy 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第3期517-520,共4页
Trusses used for roof support in coal mines are constructed of two grouted bolts installed at opposing forty-five degree angles into the roof and a cross member that ties the angled bolts together. The load on the cro... Trusses used for roof support in coal mines are constructed of two grouted bolts installed at opposing forty-five degree angles into the roof and a cross member that ties the angled bolts together. The load on the cross member is vertical, which is transverse to the longitudinal axis, and therefore the cross member is loaded in the weakest direction. Laboratory tests were conducted to determine the vertical load capacity and deflection of three different types of cross members. Single-point load tests, with the load applied in the center of the specimen and double-point load tests, with a span of 2.4 m, were conducted. For the single-point load configuration, the yield of the 25 mm solid bar cross member was nominally 98 kN of vertical load, achieved at 42 cm of deflection. For cable cross members, yield was not achieved even after 45 cm of deflection. Peak vertical loads were about 89 kN for 17 mm cables and67 kN for the 15 mm cables. For the double-point load configurations, the 25 mm solid bar cross members yielded at 150 kN of vertical load and 25 cm of deflection. At 25 cm of deflection individual cable strands started breaking at 133 and 111 kN of vertical load for the 17 and 15 mm cable cross members respectively. 展开更多
关键词 roof truss Coal mining Ground control Load capacity roof support
下载PDF
A new cable truss support system for coal roadways affected by dynamic pressure 被引量:7
4
作者 Hong Yan Fulian He 《International Journal of Mining Science and Technology》 SCIE EI 2012年第5期613-617,共5页
The support of coal roadways is seriously affected by intense dynamic pressures.This can lead to problems with large deformation of the roof and the two side walls of coal roadways.Rapid convergence of the walls and r... The support of coal roadways is seriously affected by intense dynamic pressures.This can lead to problems with large deformation of the roof and the two side walls of coal roadways.Rapid convergence of the walls and roof,a high damage rate to the bolts and cables,or even abrupt roof collapse or rib spalling can occur during the service period of these coal roadways.Analyzing the main support measures used in China leads to a proposed new cable truss supporting system.Thorough study of the entire structure shows the superiority of this design for roadways suffering under dynamic pressure.A corresponding mechanical model of the rock surrounding the cable truss system is described in this paper and formulas for calculating pre-tightening forces of the truss cable,and the minimum anchoring forces,were deduced.The new support system was applied to a typical roadway affected by intensive dynamic pressure that is located in the Xinyuan Coal Mine.The results show that the largest subsidence of the roof was 97 mm,the convergence of the two sides was less than 248 mm,and the average depth of the loose,fractured layer was only 6.12 mm.This proves that the new support system is feasible and effective. 展开更多
关键词 Dynamic pressure roof collapse Cable truss Pre-tightening force