An approach to operational risk modeling and estimation of safety levels for deep water work class remotely operated vehicle-A case study with reference to ROSUB 6000
1
作者 N.Vedachalam R.Ramesh +2 位作者 V.B.N.Jyothi G.A.Ramadass M.A.Atmanand 《Journal of Ocean Engineering and Science》 SCIE 2016年第2期109-118,共10页
This paper presents a quantitative approach to operational risk modeling and estimation of safety integrity levels,required for the deep water electric work class remotely operated vehicle with reference to ROSUB6000 ... This paper presents a quantitative approach to operational risk modeling and estimation of safety integrity levels,required for the deep water electric work class remotely operated vehicle with reference to ROSUB6000 developed by the National Institute of Ocean Technology,India.ROSUB6000 is used for carrying out bathymetric surveys,gas hydrate surveys,poly-metallic nodule exploration,salvage operations,and meeting emergency response situations.The system is expected to be in operation for a period of 300 h per year,and has to be extremely safe and reliable.Methods and models for the quantitative assessment of operational safety and estimation of safety integrity levels for ROV are seldom available in the deep water intervention industry.The safety instrumented functions implemented in the ROV should be able to meet the SIL requirements of specific mission.This study indicates that the required safety factors are implemented into the design of the state-of-the-art ROV ROSUB 6000,considering IEC 61508/61511 recommendations on Health,Safety and Environment and it is found that the system is able to meet the required SIL for seven identified functions.This paper gives the design and safety engineers in the ROV industry,an overview of the numerical operational risk assessment methods and safety-centered ROV engineering. 展开更多
关键词 Remotely operated vehicle HSE safety integrity level safety instrumented function
原文传递
In-service performance of emergency shutdown valves and dependent operational relationships in the offshore oil and gas industry
2
作者 Keith Cameron Andrew Lewis +1 位作者 Diogo Montalvao Mohammad Reza Herfatmanesh 《Petroleum》 EI CSCD 2023年第4期613-620,共8页
Industrial process plants use emergency shutdown valves(ESDVs)as safety barriers to protect against hazardous events,bringing the plant to a safe state when potential danger is detected.These ESDVs are used extensivel... Industrial process plants use emergency shutdown valves(ESDVs)as safety barriers to protect against hazardous events,bringing the plant to a safe state when potential danger is detected.These ESDVs are used extensively in offshore oil and gas processing plants and have been mandated in the design of such systems from national and international standards and legislation.This paper has used actual ESDV operating data from four mid/late life oil and gas production platforms in the North Sea to research operational relationships that are of interest to those responsible for the technical management and operation of ESDVs.The first of the two relationships is between the closure time(CT)of the ESDV and the time it remains in the open position,prior to the close command.It has been hypothesised that the CT of the ESDV is affected by the length of time that it has been open prior to being closed(Time since the last stroke).In addition to the general analysis of the data series,two sub-categories were created to further investigate this possible relationship for CT and these are“above mean”and“below mean”.The correlations(Pearson's based)resulting from this analysis are in the“weak”and“very weak”categories.The second relationship investigated was the effect of very frequent closures to assess if this improves the CT.ESDV operational records for six subjects were analysed to find closures that occurred within a 24 h period of each other.However,no discriminating trend was apparent where CT was impacted positively or negatively by the frequent closure group.It was concluded that the variance of ESDV closure time cannot be influenced by the technical management of the ESDV in terms of scheduling the operation of the ESDV. 展开更多
关键词 Emergency SHUTDOWN Valve safety instrumented systems Closure time IEC-61511