In order to settle the mining optimization design and safety problem of the above 1 150 m pillar of No.1 ore-body in No.H Mining Jinchuan, the lean-ore above 1 250 m, the 1 150 m horizontal pillar and the ore-body bel...In order to settle the mining optimization design and safety problem of the above 1 150 m pillar of No.1 ore-body in No.H Mining Jinchuan, the lean-ore above 1 250 m, the 1 150 m horizontal pillar and the ore-body below 1 100 m regarded as research objects based on the original design project, and nine calculation schemes on different mining sequence and different fill body strength were put forward based on cement-sand ratio of 1 : 4, 1: 12 and 1 : 24. Calculation parameters were got by the back analysis method of field monitoring data, and the FLAC2D program was applied to compute for these schemes, stress and displacement of ground settlement, shaft and stope roof were analyzed, and some conclusions were got. Results show that the intensity of filling body and the mining technique have very important effect on controlling settlement and stability of surrounding rock; Developing of lean ore have some influences to the 16th return air filling shaft, especially for 1 500--1 400 m of the shaft; The best project is the first project. This research supply some technique references and safety appraisals for the mining of lean-ore of No.II Mining Jinchuan.展开更多
Performance management as the core part of modem human resources management, is to ensure that the employee's work and the organization's strategic objectives to maintain consistent process. Performance management b...Performance management as the core part of modem human resources management, is to ensure that the employee's work and the organization's strategic objectives to maintain consistent process. Performance management by setting a scientific and rational organizational goals, departmental goals and individual goals for employees specified in the direction Managers to discover the work of subordinates through performance coaching communication problems exist, to provide guidance and resources to support the necessary work to subordinates, subordinates bv improving, work attitude and workin~ melhnd~ tn en^Hre~ tho renl^v~fltan nfn^r~" I-,;~.~;展开更多
Typical multidisciplinary design optimization(MDO) has gradually been proposed to balance performances of lightweight, noise, vibration and harshness(NVH) and safety for instrument panel(IP) structure in the aut...Typical multidisciplinary design optimization(MDO) has gradually been proposed to balance performances of lightweight, noise, vibration and harshness(NVH) and safety for instrument panel(IP) structure in the automotive development. Nevertheless, plastic constitutive relation of Polypropylene(PP) under different strain rates, has not been taken into consideration in current reliability-based and collaborative IP MDO design. In this paper, based on tensile test under different strain rates, the constitutive relation of Polypropylene material is studied. Impact simulation tests for head and knee bolster are carried out to meet the regulation of FMVSS 201 and FMVSS 208, respectively. NVH analysis is performed to obtain mainly the natural frequencies and corresponding mode shapes, while the crashworthiness analysis is employed to examine the crash behavior of IP structure. With the consideration of lightweight, NVH, head and knee bolster impact performance, design of experiment(DOE), response surface model(RSM), and collaborative optimization(CO) are applied to realize the determined and reliability-based optimizations, respectively. Furthermore, based on multi-objective genetic algorithm(MOGA), the optimal Pareto sets are completed to solve the multi-objective optimization(MOO) problem. The proposed research ensures the smoothness of Pareto set, enhances the ability of engineers to make a comprehensive decision about multi-objectives and choose the optimal design, and improves the quality and efficiency of MDO.展开更多
A safety mechanism capable of moving at will within the range of its whole link lengths is designed based on the link space. Sixteen extreme poses are obtained in a Stewart platform. The singular points of the extreme...A safety mechanism capable of moving at will within the range of its whole link lengths is designed based on the link space. Sixteen extreme poses are obtained in a Stewart platform. The singular points of the extreme poses are solved by using homotopy method as well as the judgment condition of singular points, and thereby the maximum link lengths are achieved. The rotation angles of joints and the distances between two neighboring links are analyzed in a calculation example in which that the mechanism moves among the extreme poses is assumed. Then an algorithm to test the safety mechanism is presented taking the constraint conditions into account. A safety mechanism having optimal properties of global movement is worked out by optimizing all structural parameters through minimizing the average condition number of extreme poses.展开更多
Many years experience of the operation of high stress (>72% specified minimum yield strength, SMYS) gas pipelines and statistical analysis results of pipeline incidents showed that the operating pipelines at stress...Many years experience of the operation of high stress (>72% specified minimum yield strength, SMYS) gas pipelines and statistical analysis results of pipeline incidents showed that the operating pipelines at stress levels over 72% SMYS have not presented problems in USA and Canada, and design factor does not control incidents or the safety of pipelines. Enhancing pipeline safety management level is most important for decreasing incident rate. The application history of higher design factors in the U.S and Canada was reviewed. And the effect of higher factors to the critical flaw size, puncture resistance, change of reliability with time, risk level and the arrest toughness requirements of pipeline were analyzed here. The comparison of pipeline failure rates and risk levels between two design factors (0.72 and 0.8) has shown that a change in design factor from 0.72 to 0.8 would bring little effect on failure rates and risk levels. On the basis of the analysis result, the application feasibility of design factor of 0.8 in China was discussed and the related suggestions were proposed. When an operator wishes to apply design factor 0.8 to gas pipeline, the following process is recommended: stress level of line pipe hydro test should be up to 100% SMYS, reliability and risk assessment at the design feasibility or conceptual stage should be conducted, Charpy impact energy should meet the need of pipeline crack arrest; and establish and execute risk based integrity management plan. The technology of pipeline steel metallurgy, line pipe fabrication and pipeline construction, and line pipe quality control level in China achieved tremendous progresses, and line pipe product standards and property indexes have come up to international advanced level. Furthermore, pipeline safety management has improved greatly in China. Consequently, the research for the feasibility of application of design factor of 0.8 in China has fundamental basis.展开更多
Engineering designs for mountainous highways emphasize compliance checking to ensure safety. However, relying solely on compliance checking may lead designers to minimize costs at the expense of high risk indicators, ...Engineering designs for mountainous highways emphasize compliance checking to ensure safety. However, relying solely on compliance checking may lead designers to minimize costs at the expense of high risk indicators, since the overall risk level of the highway design is unknown to the designers. This paper describes a method for the simultaneous consideration of traffic safety risks and the associated cost burden related to the appropriate planning and design of a mountainous highway. The method can be carried out in four steps: First, the highway design is represented by a new parametric framework to extract the key design variables that affect not only the life-cycle cost but also the operational safety. Second, the relationship between the life-cycle cost and the operational safety risk factors is established in the cost-estimation functions. Third, a fault tree analysis (FTA) is introduced to identify the traffic risk factors from the design variables. The safety performance of the design solutions is also assessed by the generalized linear-regression model. Fourth, a theory of acceptable risk analysis is introduced to the traffic safety assessment, and a computing algorithm is proposed to solve for a cost-efficient optimal solution within the range of acceptable risk, in order to help decision-makers. This approach was applied and examined in the Sichuan–Tibet Highway engineering project, which is located in a complex area with a large elevation gradient and a wide range of mountains. The experimental results show that the proposed approach significantly improved both the safety and cost performance of the project in the study area.展开更多
Traffic safety is one of the problems that need to be addressed in the construction and development of expressway.The key content of the design of traffic safety facilities is optimizing traffic safety facilities to r...Traffic safety is one of the problems that need to be addressed in the construction and development of expressway.The key content of the design of traffic safety facilities is optimizing traffic safety facilities to reduce the probability of traffic safety accidents.Based on the analysis of highway safety facilities design optimization requirements,this paper puts forward the corresponding optimization measures,and explores the innovation of safety facilities design,in hopes of providing reference for the design of highway safety facilities.展开更多
In order to ensure the safety of children while using machineries and avoid harm caused by mechanical toys,this paper analyzes the types and detection standards of children’s toys,discusses the reasons for the harm c...In order to ensure the safety of children while using machineries and avoid harm caused by mechanical toys,this paper analyzes the types and detection standards of children’s toys,discusses the reasons for the harm caused by these toys,and proposes human-machine safety design strategies for children’s toys as reference.展开更多
浮式液化天然气生产储卸装置(floating liquefied natural gas system,FLNG)特种液货船作为开发海上天然气田的新式装置,极大的方便了对处于深海的气田的开发利用,该文以“Prelude”号FLNG作为母船,提出一种新型FLNG低温能量管理系统。...浮式液化天然气生产储卸装置(floating liquefied natural gas system,FLNG)特种液货船作为开发海上天然气田的新式装置,极大的方便了对处于深海的气田的开发利用,该文以“Prelude”号FLNG作为母船,提出一种新型FLNG低温能量管理系统。该系统主要利用液态空气作为媒介储存和释放能量,通过液态空气冷能与混合制冷循环相结合实现天然气液化过程,在提高LNG生产性能的同时集成了CO_(2)液化循环和电力的生产,通过CO_(2)液化和剩余冷能发电提高系统的输出性能,实现了FLNG船舶冷能的多级利用,也为FLNG船舶冷能利用提供新方法,新途径。所提系统相较于基准模型具有更好的性能,在7.04年可实现成本回收。最后采用多目标性能优化,进一步提高系统㶲效率达60.67%,同时降低约2.3%的成本。该FLNG低温能量管理系统有高效、低耗、稳收益、低碳化等特点,可更好优化海上LNG供应链,促进航运业“双碳”发展。展开更多
基金Supported by Key Projects in the Province Science & Technology Program of Hunan (2009FJ2005)Key Projects in the National Science & Technology Pillar Program in the Eleventh Five-year Plan Period(2008BAB32B01)Aid program for Science and Technology Innovative Research Team in Higher Educational Institutions of Hunan Province
文摘In order to settle the mining optimization design and safety problem of the above 1 150 m pillar of No.1 ore-body in No.H Mining Jinchuan, the lean-ore above 1 250 m, the 1 150 m horizontal pillar and the ore-body below 1 100 m regarded as research objects based on the original design project, and nine calculation schemes on different mining sequence and different fill body strength were put forward based on cement-sand ratio of 1 : 4, 1: 12 and 1 : 24. Calculation parameters were got by the back analysis method of field monitoring data, and the FLAC2D program was applied to compute for these schemes, stress and displacement of ground settlement, shaft and stope roof were analyzed, and some conclusions were got. Results show that the intensity of filling body and the mining technique have very important effect on controlling settlement and stability of surrounding rock; Developing of lean ore have some influences to the 16th return air filling shaft, especially for 1 500--1 400 m of the shaft; The best project is the first project. This research supply some technique references and safety appraisals for the mining of lean-ore of No.II Mining Jinchuan.
文摘Performance management as the core part of modem human resources management, is to ensure that the employee's work and the organization's strategic objectives to maintain consistent process. Performance management by setting a scientific and rational organizational goals, departmental goals and individual goals for employees specified in the direction Managers to discover the work of subordinates through performance coaching communication problems exist, to provide guidance and resources to support the necessary work to subordinates, subordinates bv improving, work attitude and workin~ melhnd~ tn en^Hre~ tho renl^v~fltan nfn^r~" I-,;~.~;
基金supported by National Hi-tech Research and Development Program of China(863 Program, Grant No. 2007AA04Z132)National Natural Science Foundation of China(Grant No. 51175379)
文摘Typical multidisciplinary design optimization(MDO) has gradually been proposed to balance performances of lightweight, noise, vibration and harshness(NVH) and safety for instrument panel(IP) structure in the automotive development. Nevertheless, plastic constitutive relation of Polypropylene(PP) under different strain rates, has not been taken into consideration in current reliability-based and collaborative IP MDO design. In this paper, based on tensile test under different strain rates, the constitutive relation of Polypropylene material is studied. Impact simulation tests for head and knee bolster are carried out to meet the regulation of FMVSS 201 and FMVSS 208, respectively. NVH analysis is performed to obtain mainly the natural frequencies and corresponding mode shapes, while the crashworthiness analysis is employed to examine the crash behavior of IP structure. With the consideration of lightweight, NVH, head and knee bolster impact performance, design of experiment(DOE), response surface model(RSM), and collaborative optimization(CO) are applied to realize the determined and reliability-based optimizations, respectively. Furthermore, based on multi-objective genetic algorithm(MOGA), the optimal Pareto sets are completed to solve the multi-objective optimization(MOO) problem. The proposed research ensures the smoothness of Pareto set, enhances the ability of engineers to make a comprehensive decision about multi-objectives and choose the optimal design, and improves the quality and efficiency of MDO.
文摘A safety mechanism capable of moving at will within the range of its whole link lengths is designed based on the link space. Sixteen extreme poses are obtained in a Stewart platform. The singular points of the extreme poses are solved by using homotopy method as well as the judgment condition of singular points, and thereby the maximum link lengths are achieved. The rotation angles of joints and the distances between two neighboring links are analyzed in a calculation example in which that the mechanism moves among the extreme poses is assumed. Then an algorithm to test the safety mechanism is presented taking the constraint conditions into account. A safety mechanism having optimal properties of global movement is worked out by optimizing all structural parameters through minimizing the average condition number of extreme poses.
基金supported by China National Petroleum Corporation Application Fundamental Research Foundation (Grant No. 07A40401)
文摘Many years experience of the operation of high stress (>72% specified minimum yield strength, SMYS) gas pipelines and statistical analysis results of pipeline incidents showed that the operating pipelines at stress levels over 72% SMYS have not presented problems in USA and Canada, and design factor does not control incidents or the safety of pipelines. Enhancing pipeline safety management level is most important for decreasing incident rate. The application history of higher design factors in the U.S and Canada was reviewed. And the effect of higher factors to the critical flaw size, puncture resistance, change of reliability with time, risk level and the arrest toughness requirements of pipeline were analyzed here. The comparison of pipeline failure rates and risk levels between two design factors (0.72 and 0.8) has shown that a change in design factor from 0.72 to 0.8 would bring little effect on failure rates and risk levels. On the basis of the analysis result, the application feasibility of design factor of 0.8 in China was discussed and the related suggestions were proposed. When an operator wishes to apply design factor 0.8 to gas pipeline, the following process is recommended: stress level of line pipe hydro test should be up to 100% SMYS, reliability and risk assessment at the design feasibility or conceptual stage should be conducted, Charpy impact energy should meet the need of pipeline crack arrest; and establish and execute risk based integrity management plan. The technology of pipeline steel metallurgy, line pipe fabrication and pipeline construction, and line pipe quality control level in China achieved tremendous progresses, and line pipe product standards and property indexes have come up to international advanced level. Furthermore, pipeline safety management has improved greatly in China. Consequently, the research for the feasibility of application of design factor of 0.8 in China has fundamental basis.
基金the National Natural Science Foundation of China (71732001, 51878311, and 51678265)the Research Project of the Chinese Academy of Engineering (2017-XZ-12).
文摘Engineering designs for mountainous highways emphasize compliance checking to ensure safety. However, relying solely on compliance checking may lead designers to minimize costs at the expense of high risk indicators, since the overall risk level of the highway design is unknown to the designers. This paper describes a method for the simultaneous consideration of traffic safety risks and the associated cost burden related to the appropriate planning and design of a mountainous highway. The method can be carried out in four steps: First, the highway design is represented by a new parametric framework to extract the key design variables that affect not only the life-cycle cost but also the operational safety. Second, the relationship between the life-cycle cost and the operational safety risk factors is established in the cost-estimation functions. Third, a fault tree analysis (FTA) is introduced to identify the traffic risk factors from the design variables. The safety performance of the design solutions is also assessed by the generalized linear-regression model. Fourth, a theory of acceptable risk analysis is introduced to the traffic safety assessment, and a computing algorithm is proposed to solve for a cost-efficient optimal solution within the range of acceptable risk, in order to help decision-makers. This approach was applied and examined in the Sichuan–Tibet Highway engineering project, which is located in a complex area with a large elevation gradient and a wide range of mountains. The experimental results show that the proposed approach significantly improved both the safety and cost performance of the project in the study area.
文摘Traffic safety is one of the problems that need to be addressed in the construction and development of expressway.The key content of the design of traffic safety facilities is optimizing traffic safety facilities to reduce the probability of traffic safety accidents.Based on the analysis of highway safety facilities design optimization requirements,this paper puts forward the corresponding optimization measures,and explores the innovation of safety facilities design,in hopes of providing reference for the design of highway safety facilities.
文摘In order to ensure the safety of children while using machineries and avoid harm caused by mechanical toys,this paper analyzes the types and detection standards of children’s toys,discusses the reasons for the harm caused by these toys,and proposes human-machine safety design strategies for children’s toys as reference.
文摘浮式液化天然气生产储卸装置(floating liquefied natural gas system,FLNG)特种液货船作为开发海上天然气田的新式装置,极大的方便了对处于深海的气田的开发利用,该文以“Prelude”号FLNG作为母船,提出一种新型FLNG低温能量管理系统。该系统主要利用液态空气作为媒介储存和释放能量,通过液态空气冷能与混合制冷循环相结合实现天然气液化过程,在提高LNG生产性能的同时集成了CO_(2)液化循环和电力的生产,通过CO_(2)液化和剩余冷能发电提高系统的输出性能,实现了FLNG船舶冷能的多级利用,也为FLNG船舶冷能利用提供新方法,新途径。所提系统相较于基准模型具有更好的性能,在7.04年可实现成本回收。最后采用多目标性能优化,进一步提高系统㶲效率达60.67%,同时降低约2.3%的成本。该FLNG低温能量管理系统有高效、低耗、稳收益、低碳化等特点,可更好优化海上LNG供应链,促进航运业“双碳”发展。