The 130m high Punt dal Gall dam is located at the Swiss-Italian border in the South-eastern part of Switzerland and was completed in 1969.The dam is founded on highly folded and partially crushed dolomite and limeston...The 130m high Punt dal Gall dam is located at the Swiss-Italian border in the South-eastern part of Switzerland and was completed in 1969.The dam is founded on highly folded and partially crushed dolomite and limestone formations.A grout curtain with an area of 120,000m^(2) was provided for controlling seepage.For the monitoring of the dam deformations five inverted pendulums were installed in the dam and three in the rock foundation of the right abutment outside of the dam.For a seasonal water level fluctuation in the reservoir of about 60 m the maximum amplitude of the radial displacement is 25 mm,which includes both the effects of the water load and temperature effects.Furthermore a comprehensive geodetic network was established,57 joint meters were installed and cracks in the crest gallery are monitored by crack meters.There are also thermometers,piczometers and rocmeters.Springs at the left and fight banks of the dam are monitored and chemical analyses of the seepage water and springs are performed regularly.The dam is equipped with strong motion instruments and several near-field earthquakes have been recorded in the past.The paper describes the long-term safety monitoring of this 42 years old arch dam.A short description of the Swiss practice in dam safety monitoring and emergency planning is also given.展开更多
Reasonable site selection, blocking to meet design standards, interception and drainage and other protective measures are the basic conditions for not causing disaster in slag disposal site. A hydropower station is lo...Reasonable site selection, blocking to meet design standards, interception and drainage and other protective measures are the basic conditions for not causing disaster in slag disposal site. A hydropower station is located in mountainous area, the amount of slag abandoned is large, the grade of slag disposal field is high, and the site selection is difficult. On the basis of in Situ deformation monitoring, the slope stability of slag disposal site is calculated by Swedish arc method through the analysis of the scale, grade, site selection, surrounding environment, cut and discharge, blocking and protection design standards of slag disposal site. Under normal and abnormal operating conditions, the slope stability of slag disposal site meets the requirements of the code, and the results of in Situ deformation monitoring verify the calculation results of slope stability of slag disposal site by Swedish circular arc method.展开更多
文摘The 130m high Punt dal Gall dam is located at the Swiss-Italian border in the South-eastern part of Switzerland and was completed in 1969.The dam is founded on highly folded and partially crushed dolomite and limestone formations.A grout curtain with an area of 120,000m^(2) was provided for controlling seepage.For the monitoring of the dam deformations five inverted pendulums were installed in the dam and three in the rock foundation of the right abutment outside of the dam.For a seasonal water level fluctuation in the reservoir of about 60 m the maximum amplitude of the radial displacement is 25 mm,which includes both the effects of the water load and temperature effects.Furthermore a comprehensive geodetic network was established,57 joint meters were installed and cracks in the crest gallery are monitored by crack meters.There are also thermometers,piczometers and rocmeters.Springs at the left and fight banks of the dam are monitored and chemical analyses of the seepage water and springs are performed regularly.The dam is equipped with strong motion instruments and several near-field earthquakes have been recorded in the past.The paper describes the long-term safety monitoring of this 42 years old arch dam.A short description of the Swiss practice in dam safety monitoring and emergency planning is also given.
文摘Reasonable site selection, blocking to meet design standards, interception and drainage and other protective measures are the basic conditions for not causing disaster in slag disposal site. A hydropower station is located in mountainous area, the amount of slag abandoned is large, the grade of slag disposal field is high, and the site selection is difficult. On the basis of in Situ deformation monitoring, the slope stability of slag disposal site is calculated by Swedish arc method through the analysis of the scale, grade, site selection, surrounding environment, cut and discharge, blocking and protection design standards of slag disposal site. Under normal and abnormal operating conditions, the slope stability of slag disposal site meets the requirements of the code, and the results of in Situ deformation monitoring verify the calculation results of slope stability of slag disposal site by Swedish circular arc method.