The paper presents the analysis of a human evacuation from a higher education building located in Iassy,Romania,by means of engineering techniques to approach fire safety.Because in Romania(as in other European countr...The paper presents the analysis of a human evacuation from a higher education building located in Iassy,Romania,by means of engineering techniques to approach fire safety.Because in Romania(as in other European countries)fire safety design of buildings is prescriptive and not performance-based,a fire safety engineering approach arouse great interest in many countries such as the U.S.A.,Australia,New Zealand,England,Sweden,Finland,etc.This paper is based on the assumption of starting a fire in the space of a hall for festivities,located on the ground floor of the building,near two human evacuation routes;We consider two building evacuation scenarios:two exits and,respectively,just one exit(assuming that the second would be accidentally blocked).展开更多
The study aims to evaluate how safety-maintenance practices affect the mechanical engineering industry’s overall performance in Ghana. The study used a descriptive survey design technique to ascertain the type of mai...The study aims to evaluate how safety-maintenance practices affect the mechanical engineering industry’s overall performance in Ghana. The study used a descriptive survey design technique to ascertain the type of maintenance engineering that was practiced in Ghanaian mechanical engineering workshops at the time of the study. In the mechanical engineering workshops, respondents provided both qualitative and quantitative data using a variety of data collecting instruments, with the quantitative approach being more common. The study employed Kumasi, Tamale, and Accra’s mechanical engineering workshops as a case study. The number of mechanical engineering workshop enterprises that made up the sample size for the questionnaire administration was sixty (60), chosen at random from the AGI membership registry. Primary data was gathered using interview guides and questionnaires. To analyse the data, descriptive statistics were employed. According to the study’s findings, mechanical engineering companies combined different maintenance techniques in order to best fit their organisational culture and equipment. Preventive shut-down, with a mean score of 4.78 and RII = 0.98, placing first (1st) in the Likert rating order, is the most frequently used maintenance system by respondents. The maintenance procedures employed by mechanical engineering organisations were influenced not only by their equipment and organisational culture but also by other factors such as cost, personnel expertise and external partnerships.展开更多
The lack of care related to maintenance management is directly linked to the absence of plans for maintenance of buildings. Because of that, there is a big incidence of building accidents caused by the negligence of m...The lack of care related to maintenance management is directly linked to the absence of plans for maintenance of buildings. Because of that, there is a big incidence of building accidents caused by the negligence of managers and the lack of investment. The research has shown that, although building inspection is a consolidated building maintenance tool, managers do not prepare their building maintenance plan, nor use building inspection as a tool, leading the buildings to the premature obsolescence. The research calls attention to the building inspection technique that can be used to evaluate building maintenance and conservation. It is also a tool for analysis and investment planning based on actions to solve failures and anomalies that might come out during the building inspection. Those failures and anomalies are classified according to their degree of risk, determining the technical priorities of the investment adjustment in the maintenance plan. The paper presents a risk analysis methodology which classifies inspect elements in a building, determining the priority order of services to be executed on a scale from minimum risk (1) to imminent risk (5). The method shows a tool for building inspection, and it serves as a guideline for building maintenance interventions.展开更多
为了提高建筑施工安全风险管理的信息化水平,以建筑施工活动及事故风险类型为研究对象,建立施工安全知识图谱。通过知识图谱改进作业条件危险性评价法(LEC)实现安全风险的定量计算,并基于知识图谱进行风险位置识别和不安全因素分析。研...为了提高建筑施工安全风险管理的信息化水平,以建筑施工活动及事故风险类型为研究对象,建立施工安全知识图谱。通过知识图谱改进作业条件危险性评价法(LEC)实现安全风险的定量计算,并基于知识图谱进行风险位置识别和不安全因素分析。研究提出安全风险虚体实化理念,实现了安全风险信息在数字空间实体化表达;基于建筑信息模型(Building Information Modeling, BIM)和知识图谱技术,建立了建筑施工安全风险信息模型(Building Construction Safety Risk Information Model, BCSRIM)。该模型有效避免了传统LEC法中主观因素产生的影响,实现了建筑施工安全风险定量计算、风险位置识别、风险分析及可视化管理。利用Revit二次开发技术,在Microsoft Visual Studio中使用C#语言连接Neo4j图数据库,完成了基于知识图谱的BCSRIM的开发。试验显示,研究提出的BCSRIM对提高施工现场的管理水平具有较高的实用价值。展开更多
为了解决装配式建筑吊装施工安全风险评估体系缺失、演化路径不清的共性问题,提高施工安全科学管理水平,提出了一种基于改进决策试验与实验室评估法(Decision Making Trial and Evaluation Laboratory,DEMATEL)的关键风险识别与演化路...为了解决装配式建筑吊装施工安全风险评估体系缺失、演化路径不清的共性问题,提高施工安全科学管理水平,提出了一种基于改进决策试验与实验室评估法(Decision Making Trial and Evaluation Laboratory,DEMATEL)的关键风险识别与演化路径分析方法。基于扎根理论构建装配式建筑吊装施工安全风险评价指标体系,利用基于组合数有序加权算子(Combination Ordered Weighted Averaging,C-OWA)改进直接影响矩阵,建立DEMATEL模型决策矩阵,并通过因果关系图识别关键风险因素,探究关键风险演化路径,以武汉市某工程项目为背景开展实证研究。结果表明:该项目存在X_(1)(工人的专业水平与素质差)、X_(5)(工人的技能培训与安全教育不到位)、X_(15)(人员没有进行定期的安全培训)、X_(18)(现场施工安全管理水平低)、X_(19)(风险意识缺乏)等关键风险因素;在4条基础路径和2条复合路径中,复合路径的权重高于基础路径,随着关键风险之间直接和间接作用的复杂化,发生风险事件的可能性将逐步增加;复合路径除了通过基础路径与关键风险耦合得到以外,还可以通过基础路径的相互作用演化得到。展开更多
文摘The paper presents the analysis of a human evacuation from a higher education building located in Iassy,Romania,by means of engineering techniques to approach fire safety.Because in Romania(as in other European countries)fire safety design of buildings is prescriptive and not performance-based,a fire safety engineering approach arouse great interest in many countries such as the U.S.A.,Australia,New Zealand,England,Sweden,Finland,etc.This paper is based on the assumption of starting a fire in the space of a hall for festivities,located on the ground floor of the building,near two human evacuation routes;We consider two building evacuation scenarios:two exits and,respectively,just one exit(assuming that the second would be accidentally blocked).
文摘The study aims to evaluate how safety-maintenance practices affect the mechanical engineering industry’s overall performance in Ghana. The study used a descriptive survey design technique to ascertain the type of maintenance engineering that was practiced in Ghanaian mechanical engineering workshops at the time of the study. In the mechanical engineering workshops, respondents provided both qualitative and quantitative data using a variety of data collecting instruments, with the quantitative approach being more common. The study employed Kumasi, Tamale, and Accra’s mechanical engineering workshops as a case study. The number of mechanical engineering workshop enterprises that made up the sample size for the questionnaire administration was sixty (60), chosen at random from the AGI membership registry. Primary data was gathered using interview guides and questionnaires. To analyse the data, descriptive statistics were employed. According to the study’s findings, mechanical engineering companies combined different maintenance techniques in order to best fit their organisational culture and equipment. Preventive shut-down, with a mean score of 4.78 and RII = 0.98, placing first (1st) in the Likert rating order, is the most frequently used maintenance system by respondents. The maintenance procedures employed by mechanical engineering organisations were influenced not only by their equipment and organisational culture but also by other factors such as cost, personnel expertise and external partnerships.
文摘The lack of care related to maintenance management is directly linked to the absence of plans for maintenance of buildings. Because of that, there is a big incidence of building accidents caused by the negligence of managers and the lack of investment. The research has shown that, although building inspection is a consolidated building maintenance tool, managers do not prepare their building maintenance plan, nor use building inspection as a tool, leading the buildings to the premature obsolescence. The research calls attention to the building inspection technique that can be used to evaluate building maintenance and conservation. It is also a tool for analysis and investment planning based on actions to solve failures and anomalies that might come out during the building inspection. Those failures and anomalies are classified according to their degree of risk, determining the technical priorities of the investment adjustment in the maintenance plan. The paper presents a risk analysis methodology which classifies inspect elements in a building, determining the priority order of services to be executed on a scale from minimum risk (1) to imminent risk (5). The method shows a tool for building inspection, and it serves as a guideline for building maintenance interventions.
文摘为了提高建筑施工安全风险管理的信息化水平,以建筑施工活动及事故风险类型为研究对象,建立施工安全知识图谱。通过知识图谱改进作业条件危险性评价法(LEC)实现安全风险的定量计算,并基于知识图谱进行风险位置识别和不安全因素分析。研究提出安全风险虚体实化理念,实现了安全风险信息在数字空间实体化表达;基于建筑信息模型(Building Information Modeling, BIM)和知识图谱技术,建立了建筑施工安全风险信息模型(Building Construction Safety Risk Information Model, BCSRIM)。该模型有效避免了传统LEC法中主观因素产生的影响,实现了建筑施工安全风险定量计算、风险位置识别、风险分析及可视化管理。利用Revit二次开发技术,在Microsoft Visual Studio中使用C#语言连接Neo4j图数据库,完成了基于知识图谱的BCSRIM的开发。试验显示,研究提出的BCSRIM对提高施工现场的管理水平具有较高的实用价值。
文摘为了解决装配式建筑吊装施工安全风险评估体系缺失、演化路径不清的共性问题,提高施工安全科学管理水平,提出了一种基于改进决策试验与实验室评估法(Decision Making Trial and Evaluation Laboratory,DEMATEL)的关键风险识别与演化路径分析方法。基于扎根理论构建装配式建筑吊装施工安全风险评价指标体系,利用基于组合数有序加权算子(Combination Ordered Weighted Averaging,C-OWA)改进直接影响矩阵,建立DEMATEL模型决策矩阵,并通过因果关系图识别关键风险因素,探究关键风险演化路径,以武汉市某工程项目为背景开展实证研究。结果表明:该项目存在X_(1)(工人的专业水平与素质差)、X_(5)(工人的技能培训与安全教育不到位)、X_(15)(人员没有进行定期的安全培训)、X_(18)(现场施工安全管理水平低)、X_(19)(风险意识缺乏)等关键风险因素;在4条基础路径和2条复合路径中,复合路径的权重高于基础路径,随着关键风险之间直接和间接作用的复杂化,发生风险事件的可能性将逐步增加;复合路径除了通过基础路径与关键风险耦合得到以外,还可以通过基础路径的相互作用演化得到。