In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select...In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select the effective scheduling rules( SRs) which are constructed using the project status and attributes of the activities. SRs are represented by the chromosomes of GEP, and an improved parallel schedule generation scheme( IPSGS) is used to transform the SRs into explicit schedules. The framework of GEP-SR for RCPSP is designed,and the effectiveness of the GEP-SR approach is demonstrated by comparing with other methods on the same instances.展开更多
Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity...Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching.展开更多
Considering the complex constraint between operations in nonstandard job shop scheduling problem (NJSSP), critical path of job manufacturing tree is determined according to priority scheduling function constructed. ...Considering the complex constraint between operations in nonstandard job shop scheduling problem (NJSSP), critical path of job manufacturing tree is determined according to priority scheduling function constructed. Operations are divided into dependent operations and independent operations with the idea of subsection, and corresponding scheduling strategy is put forward according to operation characteristic in the segment and the complementarities of identical function machines. Forward greedy rule is adopted mainly for dependent operations to make operations arranged in the right position of machine selected, then each operation can be processed as early as possible, and the total processing time of job can be shortened as much as possible. For independent operations optimum scheduling rule is adopted mainly, the inserting position of operations will be determined according to the gap that the processing time of operations is subtracted from idle time of machine, and the operation will be inserted in the position with minimal gap. Experiments show, under the same conditions, the result that operations are scheduled according to the object function constructed, and the scheduling strategy adopted is better than the result that operations are scheduled according to efficiency scheduling algorithm.展开更多
Aim of this research is to minimize makespan in the flexible job shop environment by the use of genetic algorithms and scheduling rules. Software is developed using genetic algorithms and scheduling rules based on cer...Aim of this research is to minimize makespan in the flexible job shop environment by the use of genetic algorithms and scheduling rules. Software is developed using genetic algorithms and scheduling rules based on certain constraints such as non-preemption of jobs, recirculation, set up times, non-breakdown of machines etc. Purpose of the software is to develop a schedule for flexible job shop environment, which is a special case of job shop scheduling problem. Scheduling algorithm used in the software is verified and tested by using MT10 as benchmark problem, presented in the flexible job shop environment at the end. LEKIN software results are also compared with results of the developed software by the use of MT10 benchmark problem to show that the latter is a practical software and can be used successfully at BIT Training Workshop.展开更多
基金The Spring Plan of Ministry of Education,China(No.Z2012017)
文摘In order to minimize the project duration of resourceconstrained project scheduling problem( RCPSP), a gene expression programming-based scheduling rule( GEP-SR) method is proposed to automatically discover and select the effective scheduling rules( SRs) which are constructed using the project status and attributes of the activities. SRs are represented by the chromosomes of GEP, and an improved parallel schedule generation scheme( IPSGS) is used to transform the SRs into explicit schedules. The framework of GEP-SR for RCPSP is designed,and the effectiveness of the GEP-SR approach is demonstrated by comparing with other methods on the same instances.
基金supported by the National Key Basic Research Development Program of China (Grant No. 2002CCA00700)
文摘Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching.
基金National Natural Science Foundation of China(No. 50575062)Natural Science Foundation of Heilongjiang Province,China (No. F200608)+2 种基金Key Project of Scientific Research Subsidy of Abroad Scholars of Heilongjiang Provincial Education Department, China (No.1152hq08)Scientific Research Fund of Heilongjiang Provincial Education Department, China (No.10551z0008)Harbin Municipal Key Project of Science and Technology, China (No.2005AA1CG061-11).
文摘Considering the complex constraint between operations in nonstandard job shop scheduling problem (NJSSP), critical path of job manufacturing tree is determined according to priority scheduling function constructed. Operations are divided into dependent operations and independent operations with the idea of subsection, and corresponding scheduling strategy is put forward according to operation characteristic in the segment and the complementarities of identical function machines. Forward greedy rule is adopted mainly for dependent operations to make operations arranged in the right position of machine selected, then each operation can be processed as early as possible, and the total processing time of job can be shortened as much as possible. For independent operations optimum scheduling rule is adopted mainly, the inserting position of operations will be determined according to the gap that the processing time of operations is subtracted from idle time of machine, and the operation will be inserted in the position with minimal gap. Experiments show, under the same conditions, the result that operations are scheduled according to the object function constructed, and the scheduling strategy adopted is better than the result that operations are scheduled according to efficiency scheduling algorithm.
文摘Aim of this research is to minimize makespan in the flexible job shop environment by the use of genetic algorithms and scheduling rules. Software is developed using genetic algorithms and scheduling rules based on certain constraints such as non-preemption of jobs, recirculation, set up times, non-breakdown of machines etc. Purpose of the software is to develop a schedule for flexible job shop environment, which is a special case of job shop scheduling problem. Scheduling algorithm used in the software is verified and tested by using MT10 as benchmark problem, presented in the flexible job shop environment at the end. LEKIN software results are also compared with results of the developed software by the use of MT10 benchmark problem to show that the latter is a practical software and can be used successfully at BIT Training Workshop.