In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST) arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has bee...In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST) arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has been increasing rapidly, which is rare in the history of bridge development. The large-scale construction of expressways and high-speed railways demands the development of long-span arch bridges, and advances in design and construction techniques have made it possible to construct such bridges. In the present study, the current status, development, and major innovative technologies of CFST arch bridges and concrete arch bridges with a CFST skeleton in China are elaborated. This paper covers the key con- struction technologies of CFST arch bridges, such as the design, manufacture, and installation of steel tube arch trusses, the preparation and pouring of in-tube concrete, and the construction of the world's longest CFST arch bridge-the First Hejiang Yangtze River Bridge. The main construction technologies of rein- forced concrete arch bridges are also presented, which include cable-stayed fastening-hanging cantilever assembly, adjusting the load by means of stay cables, surrounding the concrete for arch rib pouring, and so forth. In addition, the construction of two CFST skeleton concrete arch bridges-the Guangxi Yongning Yong River Bridge and the Yunnan-Guangxi Railway Nanpan River Bridge--is discussed. CFST arch bridges in China have already gained a world-leading position; with the continuous innovation of key technologies, China will become the new leader in promoting the development of arch bridges.展开更多
A micro-scale finite element method(FEM) was proposed to precisely calculate the heat conduction between mortar and aggregate, and thus to accurately predict the non-uniformity of concrete pouring temperature. The con...A micro-scale finite element method(FEM) was proposed to precisely calculate the heat conduction between mortar and aggregate, and thus to accurately predict the non-uniformity of concrete pouring temperature. The concrete temperature field during vibration was also precisely calculated by accurate description of heat absorption characteristics of different parts of concrete when vibration. Based on the above method, the prediction model was used to predict the pouring temperature of a practical engineering. The comparison between actual results and simulated values shows that this method can be adopted to accurately predict the non-uniformity of concrete pouring temperature and the influence of mechanized vibration on concrete pouring temperature, and thus accurately predict pouring temperature. The control of casting temperature is crucial for preventing concrete fracture. The study provides a new method for predicting the pouring temperature of concrete structures, which has great practical value in engineering application.展开更多
文摘In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST) arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has been increasing rapidly, which is rare in the history of bridge development. The large-scale construction of expressways and high-speed railways demands the development of long-span arch bridges, and advances in design and construction techniques have made it possible to construct such bridges. In the present study, the current status, development, and major innovative technologies of CFST arch bridges and concrete arch bridges with a CFST skeleton in China are elaborated. This paper covers the key con- struction technologies of CFST arch bridges, such as the design, manufacture, and installation of steel tube arch trusses, the preparation and pouring of in-tube concrete, and the construction of the world's longest CFST arch bridge-the First Hejiang Yangtze River Bridge. The main construction technologies of rein- forced concrete arch bridges are also presented, which include cable-stayed fastening-hanging cantilever assembly, adjusting the load by means of stay cables, surrounding the concrete for arch rib pouring, and so forth. In addition, the construction of two CFST skeleton concrete arch bridges-the Guangxi Yongning Yong River Bridge and the Yunnan-Guangxi Railway Nanpan River Bridge--is discussed. CFST arch bridges in China have already gained a world-leading position; with the continuous innovation of key technologies, China will become the new leader in promoting the development of arch bridges.
基金Supported by the National Key Research and Development Project of China(No.2018YFC0406703)the National Natural Science Foundation of China(Nos.51779277,51579252,51439005)+2 种基金the Special Scientific Research Project of the State Key Laboratory of Simulation and Regulation of Water Cycles in River Basins(No.2016ZY10)a Special Scientific Research Project of the China Institute of Water Resources and Hydropower Research(Nos.SS0145B392016,SS0145B612017)the Special Scientific Research Project of the China Institute of Water Resources and Hydropower Research(No.KY1799).
文摘A micro-scale finite element method(FEM) was proposed to precisely calculate the heat conduction between mortar and aggregate, and thus to accurately predict the non-uniformity of concrete pouring temperature. The concrete temperature field during vibration was also precisely calculated by accurate description of heat absorption characteristics of different parts of concrete when vibration. Based on the above method, the prediction model was used to predict the pouring temperature of a practical engineering. The comparison between actual results and simulated values shows that this method can be adopted to accurately predict the non-uniformity of concrete pouring temperature and the influence of mechanized vibration on concrete pouring temperature, and thus accurately predict pouring temperature. The control of casting temperature is crucial for preventing concrete fracture. The study provides a new method for predicting the pouring temperature of concrete structures, which has great practical value in engineering application.