期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
AN APPLICATION OF TOPOLOGICAL ANALYSIS TO STUDYING THE THREE-DIMENSIONAL FLOW IN CASCADES;PART I—TOPOLOGICAL RULES FOR SKIN-FRICTION LINES AND SECTION STREAMLINES 被引量:2
1
作者 康顺 《Applied Mathematics and Mechanics(English Edition)》 SCIE EI 1990年第5期489-495,共7页
Based on the working of Lighthill and Hunt et al., in the present paper the author has established the topological rules adapting to analysing the skin-friction lines and the section streamlines in cascades. These rul... Based on the working of Lighthill and Hunt et al., in the present paper the author has established the topological rules adapting to analysing the skin-friction lines and the section streamlines in cascades. These rules are (1) for a rotor cascade without shroud band, the total number of nodal points equals that the saddle points on the skin-friction line vector fields in eachpitch range; (2) for an annular or straight cascade with no-clearances at blade ends, the total number of saddle points is two more than that of nodal points on the skin-friction line fields in a pitch; (3) the total number of saddles in the secondary flow fields on cross-sections in cascade is one less than that of nodes; (4) in the section streamline vector fields on a meridian surface penetrating a flow passage, and on leading and trailing edge sections, the total number of nodes is equal to that of saddles; (5) on the streamline vector fields of a blade-to-blade surface, the total number of nodes is one less than that of saddles. 展开更多
关键词 node TOPOLOGICAL RULES FOR SKIN-FRICTION lineS AND SECTION STREAMlineS AN APPLICATION OF TOPOLOGICAL ANALYSIS TO STUDYING THE THREE-DIMENSIONAL FLOW IN CASCADES PART I
下载PDF
The first UHV experimental line section constructed
2
《Electricity》 1996年第3期39-39,共1页
The first UHV experimental line section of 1000 kV class in China, situated at the outdoor test yard of Wuhan High Voltage Research Institute under the Ministry of Electric Power has been built just before July 1st, 1... The first UHV experimental line section of 1000 kV class in China, situated at the outdoor test yard of Wuhan High Voltage Research Institute under the Ministry of Electric Power has been built just before July 1st, 1996. This experimental line section is 200 m long with 3 phase, 8 展开更多
关键词 line The first UHV experimental line section constructed HIGH
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部