Selecting the optimal one from similar schemes is a paramount work in equipment design.In consideration of similarity of schemes and repetition of characteristic indices,the theory of set pair analysis(SPA)is proposed...Selecting the optimal one from similar schemes is a paramount work in equipment design.In consideration of similarity of schemes and repetition of characteristic indices,the theory of set pair analysis(SPA)is proposed,and then an optimal selection model is established.In order to improve the accuracy and flexibility,the model is modified by the contribution degree.At last,this model has been validated by an example,and the result demonstrates the method is feasible and valuable for practical usage.展开更多
Traffic management in underground mines,especially on production ramps,is a difficult problem to optimize and control.Most operations use one of a few common policies;e.g.,the so-called ‘‘lock-out" and‘‘loade...Traffic management in underground mines,especially on production ramps,is a difficult problem to optimize and control.Most operations use one of a few common policies;e.g.,the so-called ‘‘lock-out" and‘‘loaded-vehicle-priority" policies.The work presented in this paper uses discrete-event simulation to study the efficiency of multiple policies.Based on simulation results,an improvement to the common lock-out policy is proposed.This new policy utilizes the rules of the lock-out policy but integrates an option that allows a group of vehicles to be given temporary priority in a certain direction of travel.Quantitative results are provided and,based on these,a systematic technique for ramp design that aims to optimize the efficiency of underground mine ramp traffic flow is described.展开更多
In view of complex geological characteristics and alternating loading conditions associated with cyclic large amount of gas injection and withdrawal in underground gas storage(UGS) of China, a series of key gas storag...In view of complex geological characteristics and alternating loading conditions associated with cyclic large amount of gas injection and withdrawal in underground gas storage(UGS) of China, a series of key gas storage construction technologies were established, mainly including UGS site selection and evaluation, key index design, well drilling and completion, surface engineering and operational risk warning and assessment, etc. The effect of field application was discussed and summarized. Firstly, trap dynamic sealing capacity evaluation technology for conversion of UGS from the fault depleted or partially depleted gas reservoirs. A key index design method mainly based on the effective gas storage capacity design for water flooded heterogeneous gas reservoirs was proposed. To effectively guide the engineering construction of UGS, the safe well drilling, high quality cementing and high pressure and large flow surface injection and production engineering optimization suitable for long-term alternate loading condition and ultra-deep and ultra-low temperature formation were developed. The core surface equipment like high pressure gas injection compressor can be manufactured by our own. Last, the full-system operational risk warning and assessment technology for UGS was set up. The above 5 key technologies have been utilized in site selection, development scheme design, engineering construction and annual operations of 6 UGS groups, e.g. the Hutubi UGS in Xinjiang. To date, designed main indexes are highly consistent with actural performance, the 6 UGS groups have the load capacity of over 7.5 billion cubic meters of working gas volume and all the storage facilities have been running efficiently and safely.展开更多
文摘Selecting the optimal one from similar schemes is a paramount work in equipment design.In consideration of similarity of schemes and repetition of characteristic indices,the theory of set pair analysis(SPA)is proposed,and then an optimal selection model is established.In order to improve the accuracy and flexibility,the model is modified by the contribution degree.At last,this model has been validated by an example,and the result demonstrates the method is feasible and valuable for practical usage.
基金funded by the Natural Science and Engineering Research Council of Canada (NSERC) under project CRDPJ 44SBO4-12funding provided by Barrick Gold Corporation and Peck Tech Consulting Ltd
文摘Traffic management in underground mines,especially on production ramps,is a difficult problem to optimize and control.Most operations use one of a few common policies;e.g.,the so-called ‘‘lock-out" and‘‘loaded-vehicle-priority" policies.The work presented in this paper uses discrete-event simulation to study the efficiency of multiple policies.Based on simulation results,an improvement to the common lock-out policy is proposed.This new policy utilizes the rules of the lock-out policy but integrates an option that allows a group of vehicles to be given temporary priority in a certain direction of travel.Quantitative results are provided and,based on these,a systematic technique for ramp design that aims to optimize the efficiency of underground mine ramp traffic flow is described.
基金Supported by the CNPC Science and Technology Major Project(2015E-4002)
文摘In view of complex geological characteristics and alternating loading conditions associated with cyclic large amount of gas injection and withdrawal in underground gas storage(UGS) of China, a series of key gas storage construction technologies were established, mainly including UGS site selection and evaluation, key index design, well drilling and completion, surface engineering and operational risk warning and assessment, etc. The effect of field application was discussed and summarized. Firstly, trap dynamic sealing capacity evaluation technology for conversion of UGS from the fault depleted or partially depleted gas reservoirs. A key index design method mainly based on the effective gas storage capacity design for water flooded heterogeneous gas reservoirs was proposed. To effectively guide the engineering construction of UGS, the safe well drilling, high quality cementing and high pressure and large flow surface injection and production engineering optimization suitable for long-term alternate loading condition and ultra-deep and ultra-low temperature formation were developed. The core surface equipment like high pressure gas injection compressor can be manufactured by our own. Last, the full-system operational risk warning and assessment technology for UGS was set up. The above 5 key technologies have been utilized in site selection, development scheme design, engineering construction and annual operations of 6 UGS groups, e.g. the Hutubi UGS in Xinjiang. To date, designed main indexes are highly consistent with actural performance, the 6 UGS groups have the load capacity of over 7.5 billion cubic meters of working gas volume and all the storage facilities have been running efficiently and safely.