The sacrificial anode protection system for the steel pipe piles of the 3rd berth of Dandong; wharf at Dandong port has operated for eight years. In this paper, the program design and the protection effect of the sacr...The sacrificial anode protection system for the steel pipe piles of the 3rd berth of Dandong; wharf at Dandong port has operated for eight years. In this paper, the program design and the protection effect of the sacrificial anode protection system are presented. The results of various inspections show that the piles are protected very satisfactorily.展开更多
A set of serf-developed apparatus for foundation physical model were utilized to conduct model tests of the multi-element composite foundation with a steel pipe pile and several gravel piles. Some load-bearing charact...A set of serf-developed apparatus for foundation physical model were utilized to conduct model tests of the multi-element composite foundation with a steel pipe pile and several gravel piles. Some load-bearing characteristics of the multi-element Composite foundation, including the curves of foundation settlement, stresses of piles, pile-soil stress ratio, and load-sharing ratio of piles and soil, were obtained to study its working performances in silty sand soil. The experimental results revealed that the multi-element composite foundation with steel pipe pile and gravel pile contributed more than the gravel pile composite foundation in improving the bearing capacity of the silty fine sand.展开更多
H-H joint of "H-jointed SPSP with H-H joint", which is made up of interlocking two H-steel sections of different sizes, is the one of SPSP's joint to improve the hydraulic conductivity. "H-H jointed SPSP with H-H ...H-H joint of "H-jointed SPSP with H-H joint", which is made up of interlocking two H-steel sections of different sizes, is the one of SPSP's joint to improve the hydraulic conductivity. "H-H jointed SPSP with H-H joint" is expected to be applied to a vertical cutoff wall in coastal landfill sites. In H-jointed SPSP with H-H joint, the H-joint is completely imperviousness. H-H joint, however, is pervious at interlocked state because a gap of 8 to 11 mm is left between the interlocking flanges, therefore, a water interception treatment must be conducted to seal the gap. The water shielding treatment of H-H joint is executed by coating the gaps with a water-swelling sheet of paint before its installation. Then, hollow space is generated in H-H joint after treating by water-swelling sheet, and that space can be used effectively. This paper proposes leachate control technologies using H-H joint interior space of SPSP cutoff walls. The possibility of those technologies and hydraulic conductivity of H-jointed SPSP with H-H joints are demonstrated by conducting the hydraulic conductivity test.展开更多
Pier-Pile integral structures provide construction works with many environmental and landscape advantages. For example, the space required to construct these structures is smaller than that of other bridges due to the...Pier-Pile integral structures provide construction works with many environmental and landscape advantages. For example, the space required to construct these structures is smaller than that of other bridges due to the footing being removed, meaning that it is not necessity to greatly change the surroundings of these bridges. While there are environmental and landscape advantages, there are also a few demerits for the overall land-scape designs, including demerits in the design of this proposed structure which consists of relatively slender parts. This proposed structure has already been constructed in areas where possibility of a severe earthquake is low. However, some problems that have yet to be examined are related to the use of this proposed structure in areas where earthquakes are frequent. Lacking detailed studies of its behavior during severe earthquakes, it is currently difficult to construct these structures in Japan. Consequently, it is necessary to investigate in detail limited performance about compression and bending moment, and earthquake- resistant performance of these structures in order to resolve these problems. In this paper, It was clarified the relationship between the rigidity of the ground and the effective buckling length by buckling analysis and elasto- plastic finite deformation analysis. Moreover, it was proposed a simplified formula using a proposed characteristic value β and several factors for analysis accuracy. A simplified formula would support to determine the effective buckling length to design the pier using the load-bearing capacity curve based on the slenderness ratio parameter.展开更多
为解决水深45.000 m深海风机钢管桩基础安装作业可靠性差和精度低等问题,对一种新型深海风机钢管桩基础安装用导向架进行结构优化。采用有限元法(Finite Element Method, FEM)与试验相结合的方法,从环境参数与作用载荷、结构形式、作业...为解决水深45.000 m深海风机钢管桩基础安装作业可靠性差和精度低等问题,对一种新型深海风机钢管桩基础安装用导向架进行结构优化。采用有限元法(Finite Element Method, FEM)与试验相结合的方法,从环境参数与作用载荷、结构形式、作业工况和结构强度与结构稳定性等方面对导向架进行综合研究。经海试验证,优化的导向架的打桩精度与打桩高效性均满足技术指标要求,可大幅提高深海风机钢管桩基础安装作业速度和质量。展开更多
文摘The sacrificial anode protection system for the steel pipe piles of the 3rd berth of Dandong; wharf at Dandong port has operated for eight years. In this paper, the program design and the protection effect of the sacrificial anode protection system are presented. The results of various inspections show that the piles are protected very satisfactorily.
基金The National Natural Science Foundation of China (No.50478090)
文摘A set of serf-developed apparatus for foundation physical model were utilized to conduct model tests of the multi-element composite foundation with a steel pipe pile and several gravel piles. Some load-bearing characteristics of the multi-element Composite foundation, including the curves of foundation settlement, stresses of piles, pile-soil stress ratio, and load-sharing ratio of piles and soil, were obtained to study its working performances in silty sand soil. The experimental results revealed that the multi-element composite foundation with steel pipe pile and gravel pile contributed more than the gravel pile composite foundation in improving the bearing capacity of the silty fine sand.
文摘H-H joint of "H-jointed SPSP with H-H joint", which is made up of interlocking two H-steel sections of different sizes, is the one of SPSP's joint to improve the hydraulic conductivity. "H-H jointed SPSP with H-H joint" is expected to be applied to a vertical cutoff wall in coastal landfill sites. In H-jointed SPSP with H-H joint, the H-joint is completely imperviousness. H-H joint, however, is pervious at interlocked state because a gap of 8 to 11 mm is left between the interlocking flanges, therefore, a water interception treatment must be conducted to seal the gap. The water shielding treatment of H-H joint is executed by coating the gaps with a water-swelling sheet of paint before its installation. Then, hollow space is generated in H-H joint after treating by water-swelling sheet, and that space can be used effectively. This paper proposes leachate control technologies using H-H joint interior space of SPSP cutoff walls. The possibility of those technologies and hydraulic conductivity of H-jointed SPSP with H-H joints are demonstrated by conducting the hydraulic conductivity test.
文摘Pier-Pile integral structures provide construction works with many environmental and landscape advantages. For example, the space required to construct these structures is smaller than that of other bridges due to the footing being removed, meaning that it is not necessity to greatly change the surroundings of these bridges. While there are environmental and landscape advantages, there are also a few demerits for the overall land-scape designs, including demerits in the design of this proposed structure which consists of relatively slender parts. This proposed structure has already been constructed in areas where possibility of a severe earthquake is low. However, some problems that have yet to be examined are related to the use of this proposed structure in areas where earthquakes are frequent. Lacking detailed studies of its behavior during severe earthquakes, it is currently difficult to construct these structures in Japan. Consequently, it is necessary to investigate in detail limited performance about compression and bending moment, and earthquake- resistant performance of these structures in order to resolve these problems. In this paper, It was clarified the relationship between the rigidity of the ground and the effective buckling length by buckling analysis and elasto- plastic finite deformation analysis. Moreover, it was proposed a simplified formula using a proposed characteristic value β and several factors for analysis accuracy. A simplified formula would support to determine the effective buckling length to design the pier using the load-bearing capacity curve based on the slenderness ratio parameter.
文摘为解决水深45.000 m深海风机钢管桩基础安装作业可靠性差和精度低等问题,对一种新型深海风机钢管桩基础安装用导向架进行结构优化。采用有限元法(Finite Element Method, FEM)与试验相结合的方法,从环境参数与作用载荷、结构形式、作业工况和结构强度与结构稳定性等方面对导向架进行综合研究。经海试验证,优化的导向架的打桩精度与打桩高效性均满足技术指标要求,可大幅提高深海风机钢管桩基础安装作业速度和质量。