Face stability is an essential issue in tunnel design and construction.Layered rock masses are typical and ubiquitous;uncertainties in rock properties always exist.In view of this,a comprehensive method,which combines...Face stability is an essential issue in tunnel design and construction.Layered rock masses are typical and ubiquitous;uncertainties in rock properties always exist.In view of this,a comprehensive method,which combines the Upper bound Limit analysis of Tunnel face stability,the Polynomial Chaos Kriging,the Monte-Carlo Simulation and Analysis of Covariance method(ULT-PCK-MA),is proposed to investigate the seismic stability of tunnel faces.A two-dimensional analytical model of ULT is developed to evaluate the virtual support force based on the upper bound limit analysis.An efficient probabilistic analysis method PCK-MA based on the adaptive Polynomial Chaos Kriging metamodel is then implemented to investigate the parameter uncertainty effects.Ten input parameters,including geological strength indices,uniaxial compressive strengths and constants for three rock formations,and the horizontal seismic coefficients,are treated as random variables.The effects of these parameter uncertainties on the failure probability and sensitivity indices are discussed.In addition,the effects of weak layer position,the middle layer thickness and quality,the tunnel diameter,the parameters correlation,and the seismic loadings are investigated,respectively.The results show that the layer distributions significantly influence the tunnel face probabilistic stability,particularly when the weak rock is present in the bottom layer.The efficiency of the proposed ULT-PCK-MA is validated,which is expected to facilitate the engineering design and construction.展开更多
Rock mass quality serves as a vital index for predicting the stability and safety status of rock tunnel faces.In tunneling practice,the rock mass quality is often assessed via a combination of qualitative and quantita...Rock mass quality serves as a vital index for predicting the stability and safety status of rock tunnel faces.In tunneling practice,the rock mass quality is often assessed via a combination of qualitative and quantitative parameters.However,due to the harsh on-site construction conditions,it is rather difficult to obtain some of the evaluation parameters which are essential for the rock mass quality prediction.In this study,a novel improved Swin Transformer is proposed to detect,segment,and quantify rock mass characteristic parameters such as water leakage,fractures,weak interlayers.The site experiment results demonstrate that the improved Swin Transformer achieves optimal segmentation results and achieving accuracies of 92%,81%,and 86%for water leakage,fractures,and weak interlayers,respectively.A multisource rock tunnel face characteristic(RTFC)dataset includes 11 parameters for predicting rock mass quality is established.Considering the limitations in predictive performance of incomplete evaluation parameters exist in this dataset,a novel tree-augmented naive Bayesian network(BN)is proposed to address the challenge of the incomplete dataset and achieved a prediction accuracy of 88%.In comparison with other commonly used Machine Learning models the proposed BN-based approach proved an improved performance on predicting the rock mass quality with the incomplete dataset.By utilizing the established BN,a further sensitivity analysis is conducted to quantitatively evaluate the importance of the various parameters,results indicate that the rock strength and fractures parameter exert the most significant influence on rock mass quality.展开更多
The control of large deformation problems in layered soft rock tunnels needs to solve urgently.The roof problem is particularly severe among the deformation issues in tunnels.This study first analyzes the asymmetric d...The control of large deformation problems in layered soft rock tunnels needs to solve urgently.The roof problem is particularly severe among the deformation issues in tunnels.This study first analyzes the asymmetric deformation modes in layered soft rock tunnels with large deformations.Subsequently,we construct a mechanical model under ideal conditions for controlling the roof of layered soft rock tunnels through high preload with the support of NPR anchor cables.The prominent roles of long and short NPR anchor cables in the support system are also analyzed.The results indicate the significance of high preload in controlling the roof of layered soft rock tunnels.The short NPR anchor cables effectively improve the integrity of the stratified soft rock layers,while the long NPR anchor cables effectively mobilize the self-bearing capacity of deep-stable rock layers.Finally,the high-preload support method with NPR anchor cables is validated to have a good effect on controlling large deformations in layered soft rock tunnels through field monitoring data.展开更多
Underground geotechnical engineering encounters persistent challenges in ensuring the stability and safety of surrounding rock structures, particularly within rocky tunnels. Rock reinforcement techniques, including th...Underground geotechnical engineering encounters persistent challenges in ensuring the stability and safety of surrounding rock structures, particularly within rocky tunnels. Rock reinforcement techniques, including the use of steel mesh, are critical to achieving this goal. However, there exists a knowledge gap regarding the comprehensive understanding of the mechanical behavior and failure mechanisms exhibited by steel mesh under diverse loading conditions. This study thoroughly explored the steel mesh's performance throughout the entire loading-failure process, innovating with detailed analysis and modeling techniques. By integrating advanced numerical modeling with laboratory experiments, the study examines the influence of varying reinforcement levels and geometric parameters on the steel mesh strength and deformation characteristics. Sensitivity analysis, employing gray correlation theory, identifies the key factors affecting the mesh performance, while a BP (Backpropagation) neural network model predicts maximum vertical deformation with high accuracy. The findings underscore the critical role of steel diameter and mesh spacing in optimizing peak load capacity, displacement, and energy absorption, offering practical guidelines for design improvements. The use of a Bayesian Regularization (BR) algorithm further enhances the predictive accuracy compared to traditional methods. This research provides new insights into optimizing steel mesh design for underground applications, offering an innovative approach to enhancing structural safety in geotechnical projects.展开更多
Imaging the wave velocity field surrounding a borehole while drilling is a promising and urgently needed approach for extending the exploration range of the borehole point.This paper develops a drilling process detect...Imaging the wave velocity field surrounding a borehole while drilling is a promising and urgently needed approach for extending the exploration range of the borehole point.This paper develops a drilling process detection(DPD)system consisting of a multifunctional sensor and a pilot geophone installed at the top of the drilling rod,geophones at the tunnel face,a laser rangefinder,and an onsite computer.A weighted adjoint-state first arrival travel time tomography method is used to invert the P-wave velocity field of rock mass while borehole drilling.A field experiment in the ongoing construction of a deep buried tunnel in southwestern China demonstrated the DPD system and the tomography method.Time-frequency analysis of typical borehole drilling detection data shows that the impact drilling source is a pulse-like seismic exploration wavelet.A velocity field of the rock mass in a triangular area defined by the borehole trajectory and geophone receiving line can be obtained.Both the borehole core and optical image validate the inverted P-wave velocity field.A numerical simulation of a checkerboard benchmark model is used to test the tomography method.The rapid convergence of the misfits and consistent agreement between the inverted and observed travel times validate the P-wave velocity imaging.展开更多
In this study,the dynamic stress concentration factors(DSCF)around a straight-wall arch tunnel(SWAT)were solved analytically utilizing the complex variable function methods and Duhamel’s integral.The effects of wavel...In this study,the dynamic stress concentration factors(DSCF)around a straight-wall arch tunnel(SWAT)were solved analytically utilizing the complex variable function methods and Duhamel’s integral.The effects of wavelength,incident angle,and blasting rising time on the DSCF distribution were analyzed.Theoretical results pointed out dynamic disturbances resulting in compressive stress concentration in the vertical direction and tensile stress in the incident direction.As the wavelength and rising time increased,there was a tendency for the amplitude of stress concentration to initially rise and then converge.Moreover,a series of 3D FEM models were established to evaluate the effect of different initial stress states on the dynamic failure of the tunnel surrounding rock.The results indicated that the failure of the surrounding rock was significantly influenced by the direction of the static maximum principal stress and the direction of the dynamic disturbance.Under the coupling of static and blasting loading,damage around the tunnel was more prone to occur in the dynamic and static stress concentration coincidence zone.Finally,the damage modes of rock tunnel under static stress and blasting disturbance from different directions were summarized and a proposed support system was presented.The results reveal the mechanisms of deep-buried rock tunnel destruction and dynamically triggered rockburst.展开更多
Tunnel construction is susceptible to accidents such as loosening, deformation, collapse, and water inrush, especiallyunder complex geological conditions like dense fault areas. These accidents can cause instability a...Tunnel construction is susceptible to accidents such as loosening, deformation, collapse, and water inrush, especiallyunder complex geological conditions like dense fault areas. These accidents can cause instability and damageto the tunnel. As a result, it is essential to conduct research on tunnel construction and grouting reinforcementtechnology in fault fracture zones to address these issues and ensure the safety of tunnel excavation projects. Thisstudy utilized the Xianglushan cross-fault tunnel to conduct a comprehensive analysis on the construction, support,and reinforcement of a tunnel crossing a fault fracture zone using the three-dimensional finite element numericalmethod. The study yielded the following research conclusions: The excavation conditions of the cross-fault tunnelarray were analyzed to determine the optimal construction method for excavation while controlling deformationand stress in the surrounding rock. The middle partition method (CD method) was found to be the most suitable.Additionally, the effects of advanced reinforcement grouting on the cross-fault fracture zone tunnel were studied,and the optimal combination of grouting reinforcement range (140°) and grouting thickness (1m) was determined.The stress and deformation data obtained fromon-site monitoring of the surrounding rock was slightly lower thanthe numerical simulation results. However, the change trend of both sets of data was found to be consistent. Theseresearch findings provide technical analysis and data support for the construction and design of cross-fault tunnels.展开更多
The damage-fracture evolution of deep rock mass has obvious particularity,which is revealed in 2400-mdeep tunnels by field tests.The evolution of the excavation damaged zone depth is consistent with that of the fractu...The damage-fracture evolution of deep rock mass has obvious particularity,which is revealed in 2400-mdeep tunnels by field tests.The evolution of the excavation damaged zone depth is consistent with that of the fractured zone depth.The ratio of the excavation damaged zone depth to the excavation fractured zone depth is greater than 2.0 in a rock mass with both high strength and good integrity,but less than1.5 in a rock mass with lower strength or poor integrity.Zonal disintegration in a rock mass with high strength and fair integrity is more likely to occur when it contains more than two groups of primary fractures in damaged zones.Fractures develop outward in zonal disintegration but are totally different from the single-zone fracture,in which the fractures develop inward,and it is the starting position of the fractured zone when the excavation surface of the middle pilot is 7–9 m close to the pre-set borehole and it stops after the excavation surface of the baseplate is 11–14 m away.The most intense evolution occurs around 2–4 m from the pre-set borehole in the sidewall expansion stage.The research results provide a reference for the monitoring scheme and support design of CJPL-Ⅲin its future construction.展开更多
Interlaid rock is an important component in the construction of neighborhood tunnels that supports and reinforces the area between two tunnels.However,the blasting load during excavation can sometimes damage the inter...Interlaid rock is an important component in the construction of neighborhood tunnels that supports and reinforces the area between two tunnels.However,the blasting load during excavation can sometimes damage the interlaid rock and threaten the stability of a tunnel’s structure.This paper presents a case study of the small clearance section of the Liantang highway tunnel project in Shenzhen,China,where the minimum distance between the two tunnels involved is only 0.5 m.To reduce the damage to the interlaid rock caused by blasting loads,we proposed a four-part excavation method with a vibrationcushioning rock layer in the following tunnel of neighborhood tunnels.Numerical simulation was used to model the damage prevention mechanism of the vibration-cushioning rock layer and to better understand the propagation of cracks in the interlaid rock.Furthermore,based on the simulation results,combined microseismic controlled-blasting technology was implemented,using innovative blasting patterns combined with different charge structures and blasting equipment designed according to the varying thickness of the interlaid rock.Finally,this implementation succeeded in protecting interlaid rock during blasting operations.展开更多
Local geometric information and discontinuity features are key aspects of the analysis of the evolution and failure mechanisms of unstable rock blocks in rock tunnels.This study demonstrates the integration of terrest...Local geometric information and discontinuity features are key aspects of the analysis of the evolution and failure mechanisms of unstable rock blocks in rock tunnels.This study demonstrates the integration of terrestrial laser scanning(TLS)with distinct element method for rock mass characterization and stability analysis in tunnels.TLS records detailed geometric information of the surrounding rock mass by scanning and collecting the positions of millions of rock surface points without contact.By conducting a fuzzy K-means method,a discontinuity automatic identification algorithm was developed,and a method for obtaining the geometric parameters of discontinuities was proposed.This method permits the user to visually identify each discontinuity and acquire its spatial distribution features(e.g.occurrences,spac-ings,trace lengths)in great detail.Compared with hand mapping in conventional geotechnical surveys,the geometric information of discontinuities obtained by this approach is more accurate and the iden-tification is more efficient.Then,a discrete fracture network with the same statistical characteristics as the actual discontinuities was generated with the distinct element method,and a representative nu-merical model of the jointed surrounding rock mass was established.By means of numerical simulation,potential unstable rock blocks were assessed,and failure mechanisms were analyzed.This method was applied to detection and assessment of unstable rock blocks in the spillway and sand flushing tunnel of the Hongshiyan hydropower project after a collapse.The results show that the noncontact detection of blocks was more labor-saving with lower safety risks compared with manual surveys,and the stability assessment was more reliable since the numerical model built by this method was more consistent with the distribution characteristics of actual joints.This study can provide a reference for geological survey and unstable rock block hazard mitigation in tunnels subjected to complex geology and active rockfalls.展开更多
To investigate the influence of unloading effect of a circular tunnel face on rockburst process,by innovatively combining rock drilling unloading devices and triaxial systems,the strain rockburst simulation under the ...To investigate the influence of unloading effect of a circular tunnel face on rockburst process,by innovatively combining rock drilling unloading devices and triaxial systems,the strain rockburst simulation under the entire stress path of“high initial stressþinternal unloadingþstress adjustment”(HUS test)was realized for the intact cubic red sandstone samples(100 mm×100 mm×100 mm).Comparative tests were conducted on cubic red sandstone samples with prefabricated circular holes(425 mm)under the stress path of“prefabricated circular hole+þhigh initial stress+stress adjustment”(PHS test),thereby highlighting the influence of internal unloading on rockburst failure.The test results revealed that with an increase in vertical stress,the sidewalls in both the HUS and PHS tests suffered strain rockburst failure.Compared with the PHS test,the initial failure stress in the HUS test is lower,and it is easier to induce sidewall rockbursts.This indicates that the internal unloading influences the sidewall failure,causing an obvious strength-weakening effect,which becomes more significant with an increase in buried depth.The strain rockburst failure was more severe in the HUS test owing to the influence of internal unloading.V-shaped rockburst pits were formed in the HUS tests,whereas in the PHS test,arcshaped rockburst pits were produced.It was also found that strain rockburst failure may occur only when the rock has a certain degree of rockburst proneness.展开更多
Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in...Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in the field of underground space engineering.This paper presented a case study of tunnelling performance prediction method of CBM in sedimentary hard-rock tunnel of Karst landform type by using tunneling data and surrounding rock parameters.The uniaxial compressive strength(UCS),rock integrity factor(Kv),basic quality index([BQ]),rock quality index RQD,brazilian tensile strength(BTS) and brittleness index(BI) were introduced to construct a performance prediction database based on the hard-rock tunnel of Guiyang Metro Line 1 and Line 3,and then established the performance prediction model of cantilever boring machine.Then the deep belief network(DBN) was introduced into the performance prediction model,and the reliability of performance prediction model was verified by combining with engineering data.The study showed that the influence degree of surrounding rock parameters on the tunneling performance of the cantilever boring machine is UCS > [BQ] > BTS >RQD > Kv > BI.The performance prediction model shows that the instantaneous cutting rate(ICR) has a good correlation with the surrounding rock parameters,and the predicting model accuracy is related to the reliability of construction data.The prediction of limestone and dolomite sections of Line 3 based on the DBN performance prediction model shows that the measured ICR and predicted ICR is consistent and the built performance prediction model is reliable.The research results have theoretical reference significance for the applicability analysis and mechanical selection of cantilever boring machine for hard rock tunnel.展开更多
Excavation under complex geological conditions requires effective and accurate geological forward-prospecting to detect the unfavorable geological structure and estimate the classification of surround-ing rock in fron...Excavation under complex geological conditions requires effective and accurate geological forward-prospecting to detect the unfavorable geological structure and estimate the classification of surround-ing rock in front of the tunnel face.In this work,a forward-prediction method for tunnel geology and classification of surrounding rock is developed based on seismic wave velocity layered tomography.In particular,for the problem of strong multi-solution of wave velocity inversion caused by few ray paths in the narrow space of the tunnel,a layered inversion based on regularization is proposed.By reducing the inversion area of each iteration step and applying straight-line interface assumption,the convergence and accuracy of wave velocity inversion are effectively improved.Furthermore,a surrounding rock classification network based on autoencoder is constructed.The mapping relationship between wave velocity and classification of surrounding rock is established with density,Poisson’s ratio and elastic modulus as links.Two numerical examples with geological conditions similar to that in the field tunnel and a field case study in an urban subway tunnel verify the potential of the proposed method for practical application.展开更多
In areas with seasonal freezing,when the tunnel lining concrete is saturated with water infiltrating the interior,the lining and the surrounding rocks will simultaneously freeze.However,the current calculation of the ...In areas with seasonal freezing,when the tunnel lining concrete is saturated with water infiltrating the interior,the lining and the surrounding rocks will simultaneously freeze.However,the current calculation of the frost heaving force fails to consider the synchronous damage to the lining and surrounding rocks under freeze-thaw cycles.Therefore,as per the elastic calculation model of the frost heaving force and model of steady-state heat transfer of circular tunnels,this study introduces the frost heaving rate of lining and surrounding rocks.First,the analytical solution of frost heaving force is obtained for simultaneous frost heaving of lining and surrounding rocks under any steady-state temperature field.Then,based on the fracture theory and meso-damage mechanics,the damage variables of lining and surrounding rocks under freeze-thaw cycles are extracted,representing their elastic modulus and porosity.Finally,the formula of frost heaving force for synchronous damage to the lining and surrounding rocks at any steady-state temperature field is obtained.The calculation results demonstrate that the lower the temperature inside the lining,the greater the frost heaving force.With the increasing number of freeze-thaw cycles,frost heaving force tends to gradually increase initially,reaching a peak value at 85 freeze-thaw cycles,decreasing to 80%of the peak value at 140 cycles before reaching a constant value.The lining participates in frost heaving,increasing the frost heaving force.The initial increase rate of frost heaving force is 15.7%.Changing the fitting coefficients s1 and s2 of the lining and surrounding rocks can effectively control the magnitude of the frost heaving force in the tunnels.展开更多
The stability of strip footings subjected to eccentrically inclined loads is critical for reliable foundation design.This study investigates the effect of a circular unlined tunnel in a rock mass on the ultimate beari...The stability of strip footings subjected to eccentrically inclined loads is critical for reliable foundation design.This study investigates the effect of a circular unlined tunnel in a rock mass on the ultimate bearing capacity(UBC)of a foundation with width B under inclined and eccentric loads.Adaptive finite element limit analysis was employed to evaluate the reduction in UBC of the footing resting above a tunnel.The examined critical parameters include normalized load eccentricity(e/B),load inclination(β),and horizontal and vertical distances of the tunnel from the foundation(P/B and Q/B,respectively),along with rock mass properties.The results reveal that for e/B≥0.25 and≤60°,the reduction coefficient,Rc≥0.90,suggesting that the presence of a tunnel has a minimal impact on the load-bearing capacity of the footing,with failure primarily governed by load eccentricity and inclination.Additionally,potential failure mechanisms are explored,showing that at lower e/B,higherβ,and lower Q/B,the tunnel significantly affects footing's failure envelope.Conversely,at higher e/B and lowerβ,failure is due to rotational effects of footing,regardless of the tunnel's position.To predict the Rc more accurately,due to the time-consuming nature of direct calculations,both MLR and ANN models were developed.The MLR model provided a baseline for comparison,while the ANN model,with a coefficient of determination(R2)of 0.98,demonstrated superior accuracy compared to the R2=0.96 of MLR.Using both approaches ensured robust and efficient predictions of Rc.Since Rc does not directly provide the reduced UBC of footing due to presence of tunnel,the study introduced bearing capacity factor(Nc)to enable direct calculation of the reduced UBC of footing.These findings offer theoretical guidelines for preliminary design and provide practitioners with an effective tool for evaluating UBC reduction in complex loading scenarios involving tunnels.展开更多
Purpose–The purpose of the study is to quickly identify significant heterogeneity of surrounding rock of tunnel face that generally occurs during the construction of large-section rock tunnels of high-speed railways....Purpose–The purpose of the study is to quickly identify significant heterogeneity of surrounding rock of tunnel face that generally occurs during the construction of large-section rock tunnels of high-speed railways.Design/methodology/approach–Relying on the support vector machine(SVM)-based classification model,the nominal classification of blastholes and nominal zoning and classification terms were used to demonstrate the heterogeneity identification method for the surrounding rock of tunnel face,and the identification calculation was carried out for the five test tunnels.Then,the suggestions for local optimization of the support structures of large-section rock tunnels were put forward.Findings–The results show that compared with the two classification models based on neural networks,the SVM-based classification model has a higher classification accuracy when the sample size is small,and the average accuracy can reach 87.9%.After the samples are replaced,the SVM-based classification model can still reach the same accuracy,whose generalization ability is stronger.Originality/value–By applying the identification method described in this paper,the significant heterogeneity characteristics of the surrounding rock in the process of two times of blasting were identified,and the identification results are basically consistent with the actual situation of the tunnel face at the end of blasting,and can provide a basis for local optimization of support parameters.展开更多
This study aims at the probabilistic assessment of tunnel convergence considering the spatial variability in rock mass properties. The method of interpolated autocorrelation combined with finite difference analysis is...This study aims at the probabilistic assessment of tunnel convergence considering the spatial variability in rock mass properties. The method of interpolated autocorrelation combined with finite difference analysis is adopted to model the spatial variability of rock mass properties. An iterative procedure using the first-order reliability method(FORM) and response surface method(RSM) is employed to compute the reliability index and its corresponding design point. The results indicate that the spatial variability considerably affects the computed reliability index. The probability of failure could be noticeably overestimated in the case where the spatial variability is neglected. The vertical scale of fluctuation has a much higher effect on the probabilistic result with respect to the tunnel convergence than the horizontal scale of fluctuation. And the influence of different spacing of control points on the computational accuracy is investigated.展开更多
Foamed concrete has a good energy absorption capability and can be used as seismic isolation material for tunnels. This study aims to investigate the mechanical properties and associated seismic isolation effects of f...Foamed concrete has a good energy absorption capability and can be used as seismic isolation material for tunnels. This study aims to investigate the mechanical properties and associated seismic isolation effects of foamed concrete layer in rock tunnel. For this, a series of uniaxial/triaxial compression tests was conducted to understand the effects of concrete density, confining stress and strain rate on the mechanical properties of foamed concrete. The direct shear tests were also performed to investigate the effects of concrete density and normal stress on the nonlinear behaviors of foamed concrete layer-lining interface. The test results showed that the mechanical properties of foamed concrete are significantly influenced by the concrete density. The foamed concrete also has high volumetric compressibility and strain-rate dependence. The peak stress. residual stress. shear stiffness and residual friction coefficient of the foamed concrete layer-lining interface are influenced by the foamed concrete density and normal stress applied. Then, a crushable foam constitutive model was constructed using ABAQUS software and a composite exponential model was also established to study the relationship between shear stress and shear displacement of the interface, in which their parameters were fitted based on the experimental results. Finally, a parametric analysis using the finite element method(FEM) was conducted to understand the influence of foamed concrete layer properties on the seismic isolation effect, including the density and thickness of the layer as well as the shear stiffness and residual friction coefficient of the interface. It was revealed that lower density and greater thickness in addition to smaller shear stiffness or residual friction coefficient of the foamed concrete layer could yield better seismic isolation effect, and the influences of the first two tend to be more significant.展开更多
At present, the inner cutters of a full face rock tunnel boring machine (TBM) and transition cutter edge angles are designed on the basis of indentation test or linear grooving test. The inner and outer edge angles of...At present, the inner cutters of a full face rock tunnel boring machine (TBM) and transition cutter edge angles are designed on the basis of indentation test or linear grooving test. The inner and outer edge angles of disc cutters are characterized as symmetric to each other with respect to the cutter edge plane. This design has some practical defects, such as severe eccentric wear and tipping, etc. In this paper, the current design theory of disc cutter edge angle is analyzed, and the characteristics of the rock-breaking movement of disc cutters are studied. The researching results show that the rotational motion of disc cutters with the cutterhead gives rise to the difference between the interactions of inner rock and outer rock with the contact area of disc cutters, with shearing and extrusion on the inner rock and attrition on the outer rock. The wear of disc cutters at the contact area is unbalanced, among which the wear in the largest normal stress area is most apparent. Therefore, a three-dimensional model theory of rock breaking and an edge angle design theory of transition disc cutter are proposed to overcome the flaws of the currently used TBM cutter heads, such as short life span, camber wearing, tipping. And a corresponding equation is established. With reference to a specific construction case, the edge angle of the transition disc cutter has been designed based on the theory. The application of TBM in some practical project proves that the theory has obvious advantages in enhancing disc cutter life, decreasing replacement frequency, and making economic benefits. The proposed research provides a theoretical basis for the design of TBM three-dimensional disc cutters whose rock-breaking operation time can be effectively increased.展开更多
Wear is a major factor of disc cutters’ failure. No current theory offers a standard for the prediction of disc cutter wear yet. In the field the wear prediction method commonly used is based on the excavation length...Wear is a major factor of disc cutters’ failure. No current theory offers a standard for the prediction of disc cutter wear yet. In the field the wear prediction method commonly used is based on the excavation length of tunnel boring machine(TBM) to predict the disc cutter wear and its wear law, considering the location number of each disc cutter on the cutterhead(radius for installation); in theory, there is a prediction method of using arc wear coefficient. However, the preceding two methods have their own errors, with their accuracy being 40% or so and largely relying on the technicians’ experience. Therefore, radial wear coefficient, axial wear coefficient and trajectory wear coefficient are defined on the basis of the operating characteristics of TBM. With reference to the installation and characteristics of disc cutters, those coefficients are modified according to penetration, which gives rise to the presentation of comprehensive axial wear coefficient, comprehensive radial wear coefficient and comprehensive trajectory wear coefficient. Calculation and determination of wear coefficients are made with consideration of data from a segment of TBM project(excavation length 173 m). The resulting wear coefficient values, after modification, are adopted to predict the disc cutter wear in the follow-up segment of the TBM project(excavation length of 5621 m). The prediction results show that the disc cutter wear predicted with comprehensive radial wear coefficient and comprehensive trajectory wear coefficient are not only accurate(accuracy 16.12%) but also highly congruous, whereas there is a larger deviation in the prediction with comprehensive axial wear coefficient(accuracy 41%, which is in agreement with the prediction of disc cutters’ life in the field). This paper puts forth a new method concerning prediction of life span and wear of TBM disc cutters as well as timing for replacing disc cutters.展开更多
基金supported by Science and Technology Project of Yunnan Provincial Transportation Department(Grant No.25 of 2018)the National Natural Science Foundation of China(Grant No.52279107)The authors are grateful for the support by the China Scholarship Council(CSC No.202206260203 and No.201906690049).
文摘Face stability is an essential issue in tunnel design and construction.Layered rock masses are typical and ubiquitous;uncertainties in rock properties always exist.In view of this,a comprehensive method,which combines the Upper bound Limit analysis of Tunnel face stability,the Polynomial Chaos Kriging,the Monte-Carlo Simulation and Analysis of Covariance method(ULT-PCK-MA),is proposed to investigate the seismic stability of tunnel faces.A two-dimensional analytical model of ULT is developed to evaluate the virtual support force based on the upper bound limit analysis.An efficient probabilistic analysis method PCK-MA based on the adaptive Polynomial Chaos Kriging metamodel is then implemented to investigate the parameter uncertainty effects.Ten input parameters,including geological strength indices,uniaxial compressive strengths and constants for three rock formations,and the horizontal seismic coefficients,are treated as random variables.The effects of these parameter uncertainties on the failure probability and sensitivity indices are discussed.In addition,the effects of weak layer position,the middle layer thickness and quality,the tunnel diameter,the parameters correlation,and the seismic loadings are investigated,respectively.The results show that the layer distributions significantly influence the tunnel face probabilistic stability,particularly when the weak rock is present in the bottom layer.The efficiency of the proposed ULT-PCK-MA is validated,which is expected to facilitate the engineering design and construction.
基金supported by the National Natural Science Foundation of China(Nos.52279107 and 52379106)the Qingdao Guoxin Jiaozhou Bay Second Submarine Tunnel Co.,Ltd.,the Academician and Expert Workstation of Yunnan Province(No.202205AF150015)the Science and Technology Innovation Project of YCIC Group Co.,Ltd.(No.YCIC-YF-2022-15)。
文摘Rock mass quality serves as a vital index for predicting the stability and safety status of rock tunnel faces.In tunneling practice,the rock mass quality is often assessed via a combination of qualitative and quantitative parameters.However,due to the harsh on-site construction conditions,it is rather difficult to obtain some of the evaluation parameters which are essential for the rock mass quality prediction.In this study,a novel improved Swin Transformer is proposed to detect,segment,and quantify rock mass characteristic parameters such as water leakage,fractures,weak interlayers.The site experiment results demonstrate that the improved Swin Transformer achieves optimal segmentation results and achieving accuracies of 92%,81%,and 86%for water leakage,fractures,and weak interlayers,respectively.A multisource rock tunnel face characteristic(RTFC)dataset includes 11 parameters for predicting rock mass quality is established.Considering the limitations in predictive performance of incomplete evaluation parameters exist in this dataset,a novel tree-augmented naive Bayesian network(BN)is proposed to address the challenge of the incomplete dataset and achieved a prediction accuracy of 88%.In comparison with other commonly used Machine Learning models the proposed BN-based approach proved an improved performance on predicting the rock mass quality with the incomplete dataset.By utilizing the established BN,a further sensitivity analysis is conducted to quantitatively evaluate the importance of the various parameters,results indicate that the rock strength and fractures parameter exert the most significant influence on rock mass quality.
基金financial support from the Second Tibetan Plateau Scientific Expedition and Research Program(STEP)(No.2019QZKK0708)the National Natural Science Foundation of China(No.41941018)the Special Fund of Yueqi Scholars(No.800015Z1207).
文摘The control of large deformation problems in layered soft rock tunnels needs to solve urgently.The roof problem is particularly severe among the deformation issues in tunnels.This study first analyzes the asymmetric deformation modes in layered soft rock tunnels with large deformations.Subsequently,we construct a mechanical model under ideal conditions for controlling the roof of layered soft rock tunnels through high preload with the support of NPR anchor cables.The prominent roles of long and short NPR anchor cables in the support system are also analyzed.The results indicate the significance of high preload in controlling the roof of layered soft rock tunnels.The short NPR anchor cables effectively improve the integrity of the stratified soft rock layers,while the long NPR anchor cables effectively mobilize the self-bearing capacity of deep-stable rock layers.Finally,the high-preload support method with NPR anchor cables is validated to have a good effect on controlling large deformations in layered soft rock tunnels through field monitoring data.
基金funded by the National Natural Science Foundation of China(Grant No.52178396).
文摘Underground geotechnical engineering encounters persistent challenges in ensuring the stability and safety of surrounding rock structures, particularly within rocky tunnels. Rock reinforcement techniques, including the use of steel mesh, are critical to achieving this goal. However, there exists a knowledge gap regarding the comprehensive understanding of the mechanical behavior and failure mechanisms exhibited by steel mesh under diverse loading conditions. This study thoroughly explored the steel mesh's performance throughout the entire loading-failure process, innovating with detailed analysis and modeling techniques. By integrating advanced numerical modeling with laboratory experiments, the study examines the influence of varying reinforcement levels and geometric parameters on the steel mesh strength and deformation characteristics. Sensitivity analysis, employing gray correlation theory, identifies the key factors affecting the mesh performance, while a BP (Backpropagation) neural network model predicts maximum vertical deformation with high accuracy. The findings underscore the critical role of steel diameter and mesh spacing in optimizing peak load capacity, displacement, and energy absorption, offering practical guidelines for design improvements. The use of a Bayesian Regularization (BR) algorithm further enhances the predictive accuracy compared to traditional methods. This research provides new insights into optimizing steel mesh design for underground applications, offering an innovative approach to enhancing structural safety in geotechnical projects.
基金the support of the National Natural Science Foundation of China(Nos.42207211,42202320 and 42172296)Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University(No.KLE-TJGE-G2304).
文摘Imaging the wave velocity field surrounding a borehole while drilling is a promising and urgently needed approach for extending the exploration range of the borehole point.This paper develops a drilling process detection(DPD)system consisting of a multifunctional sensor and a pilot geophone installed at the top of the drilling rod,geophones at the tunnel face,a laser rangefinder,and an onsite computer.A weighted adjoint-state first arrival travel time tomography method is used to invert the P-wave velocity field of rock mass while borehole drilling.A field experiment in the ongoing construction of a deep buried tunnel in southwestern China demonstrated the DPD system and the tomography method.Time-frequency analysis of typical borehole drilling detection data shows that the impact drilling source is a pulse-like seismic exploration wavelet.A velocity field of the rock mass in a triangular area defined by the borehole trajectory and geophone receiving line can be obtained.Both the borehole core and optical image validate the inverted P-wave velocity field.A numerical simulation of a checkerboard benchmark model is used to test the tomography method.The rapid convergence of the misfits and consistent agreement between the inverted and observed travel times validate the P-wave velocity imaging.
基金Project(12072376)supported by the National Natural Science Foundation of ChinaPoject(10533220215858)supported by the Fundamental Research Funds for the Central Universities,China。
文摘In this study,the dynamic stress concentration factors(DSCF)around a straight-wall arch tunnel(SWAT)were solved analytically utilizing the complex variable function methods and Duhamel’s integral.The effects of wavelength,incident angle,and blasting rising time on the DSCF distribution were analyzed.Theoretical results pointed out dynamic disturbances resulting in compressive stress concentration in the vertical direction and tensile stress in the incident direction.As the wavelength and rising time increased,there was a tendency for the amplitude of stress concentration to initially rise and then converge.Moreover,a series of 3D FEM models were established to evaluate the effect of different initial stress states on the dynamic failure of the tunnel surrounding rock.The results indicated that the failure of the surrounding rock was significantly influenced by the direction of the static maximum principal stress and the direction of the dynamic disturbance.Under the coupling of static and blasting loading,damage around the tunnel was more prone to occur in the dynamic and static stress concentration coincidence zone.Finally,the damage modes of rock tunnel under static stress and blasting disturbance from different directions were summarized and a proposed support system was presented.The results reveal the mechanisms of deep-buried rock tunnel destruction and dynamically triggered rockburst.
基金the Postgraduate Research and Practice Innovation Program of Jiangsu Province(Grant No.KYCX22_0621)the National Natural Science Foundation of China(Grant No.52209130)Jiangsu Funding Program for Excellent Postdoctoral Talent.
文摘Tunnel construction is susceptible to accidents such as loosening, deformation, collapse, and water inrush, especiallyunder complex geological conditions like dense fault areas. These accidents can cause instability and damageto the tunnel. As a result, it is essential to conduct research on tunnel construction and grouting reinforcementtechnology in fault fracture zones to address these issues and ensure the safety of tunnel excavation projects. Thisstudy utilized the Xianglushan cross-fault tunnel to conduct a comprehensive analysis on the construction, support,and reinforcement of a tunnel crossing a fault fracture zone using the three-dimensional finite element numericalmethod. The study yielded the following research conclusions: The excavation conditions of the cross-fault tunnelarray were analyzed to determine the optimal construction method for excavation while controlling deformationand stress in the surrounding rock. The middle partition method (CD method) was found to be the most suitable.Additionally, the effects of advanced reinforcement grouting on the cross-fault fracture zone tunnel were studied,and the optimal combination of grouting reinforcement range (140°) and grouting thickness (1m) was determined.The stress and deformation data obtained fromon-site monitoring of the surrounding rock was slightly lower thanthe numerical simulation results. However, the change trend of both sets of data was found to be consistent. Theseresearch findings provide technical analysis and data support for the construction and design of cross-fault tunnels.
基金supported by the National Natural Science Foundation of China(Nos.51909136 and 42177168)Project of Youth Inno vation Promotion Association of Chinese Academy of Sciences(No.2021326)the Open Research Fund of Key Laboratory of Geological Hazards on Three Gorges Reservoir Area(China Three Gorges University),Ministry of Education(No.2020KDZ03)。
文摘The damage-fracture evolution of deep rock mass has obvious particularity,which is revealed in 2400-mdeep tunnels by field tests.The evolution of the excavation damaged zone depth is consistent with that of the fractured zone depth.The ratio of the excavation damaged zone depth to the excavation fractured zone depth is greater than 2.0 in a rock mass with both high strength and good integrity,but less than1.5 in a rock mass with lower strength or poor integrity.Zonal disintegration in a rock mass with high strength and fair integrity is more likely to occur when it contains more than two groups of primary fractures in damaged zones.Fractures develop outward in zonal disintegration but are totally different from the single-zone fracture,in which the fractures develop inward,and it is the starting position of the fractured zone when the excavation surface of the middle pilot is 7–9 m close to the pre-set borehole and it stops after the excavation surface of the baseplate is 11–14 m away.The most intense evolution occurs around 2–4 m from the pre-set borehole in the sidewall expansion stage.The research results provide a reference for the monitoring scheme and support design of CJPL-Ⅲin its future construction.
基金the National Natural Science Foundation of China(No.51934001).
文摘Interlaid rock is an important component in the construction of neighborhood tunnels that supports and reinforces the area between two tunnels.However,the blasting load during excavation can sometimes damage the interlaid rock and threaten the stability of a tunnel’s structure.This paper presents a case study of the small clearance section of the Liantang highway tunnel project in Shenzhen,China,where the minimum distance between the two tunnels involved is only 0.5 m.To reduce the damage to the interlaid rock caused by blasting loads,we proposed a four-part excavation method with a vibrationcushioning rock layer in the following tunnel of neighborhood tunnels.Numerical simulation was used to model the damage prevention mechanism of the vibration-cushioning rock layer and to better understand the propagation of cracks in the interlaid rock.Furthermore,based on the simulation results,combined microseismic controlled-blasting technology was implemented,using innovative blasting patterns combined with different charge structures and blasting equipment designed according to the varying thickness of the interlaid rock.Finally,this implementation succeeded in protecting interlaid rock during blasting operations.
基金support of the National Natural Science Foundation of China(Grant No.42102316)the Open Project of the Technology Innovation Center for Geological Environment Monitoring of Ministry of Natural Resources of China(Grant No.2022KFK1212005).
文摘Local geometric information and discontinuity features are key aspects of the analysis of the evolution and failure mechanisms of unstable rock blocks in rock tunnels.This study demonstrates the integration of terrestrial laser scanning(TLS)with distinct element method for rock mass characterization and stability analysis in tunnels.TLS records detailed geometric information of the surrounding rock mass by scanning and collecting the positions of millions of rock surface points without contact.By conducting a fuzzy K-means method,a discontinuity automatic identification algorithm was developed,and a method for obtaining the geometric parameters of discontinuities was proposed.This method permits the user to visually identify each discontinuity and acquire its spatial distribution features(e.g.occurrences,spac-ings,trace lengths)in great detail.Compared with hand mapping in conventional geotechnical surveys,the geometric information of discontinuities obtained by this approach is more accurate and the iden-tification is more efficient.Then,a discrete fracture network with the same statistical characteristics as the actual discontinuities was generated with the distinct element method,and a representative nu-merical model of the jointed surrounding rock mass was established.By means of numerical simulation,potential unstable rock blocks were assessed,and failure mechanisms were analyzed.This method was applied to detection and assessment of unstable rock blocks in the spillway and sand flushing tunnel of the Hongshiyan hydropower project after a collapse.The results show that the noncontact detection of blocks was more labor-saving with lower safety risks compared with manual surveys,and the stability assessment was more reliable since the numerical model built by this method was more consistent with the distribution characteristics of actual joints.This study can provide a reference for geological survey and unstable rock block hazard mitigation in tunnels subjected to complex geology and active rockfalls.
基金This work was supported by the National Natural Science Foundation of China(Grant No.42077244)the Open Research Fund of State Key Laboratory of Deep Earth Science and Engineering(Sichuan University)(Grant No.DESE 202201)the Fundamental Research Funds for the Central Universities(Grant No.2242022k30054).
文摘To investigate the influence of unloading effect of a circular tunnel face on rockburst process,by innovatively combining rock drilling unloading devices and triaxial systems,the strain rockburst simulation under the entire stress path of“high initial stressþinternal unloadingþstress adjustment”(HUS test)was realized for the intact cubic red sandstone samples(100 mm×100 mm×100 mm).Comparative tests were conducted on cubic red sandstone samples with prefabricated circular holes(425 mm)under the stress path of“prefabricated circular hole+þhigh initial stress+stress adjustment”(PHS test),thereby highlighting the influence of internal unloading on rockburst failure.The test results revealed that with an increase in vertical stress,the sidewalls in both the HUS and PHS tests suffered strain rockburst failure.Compared with the PHS test,the initial failure stress in the HUS test is lower,and it is easier to induce sidewall rockbursts.This indicates that the internal unloading influences the sidewall failure,causing an obvious strength-weakening effect,which becomes more significant with an increase in buried depth.The strain rockburst failure was more severe in the HUS test owing to the influence of internal unloading.V-shaped rockburst pits were formed in the HUS tests,whereas in the PHS test,arcshaped rockburst pits were produced.It was also found that strain rockburst failure may occur only when the rock has a certain degree of rockburst proneness.
基金National Natural Science Foundation of China (Grant No.52178393)the Science and Technology Innovation Team of Shaanxi Innovation Capability Support Plan (Grant No.2020TD005)Science and Technology Innovation Project of China Railway Construction Bridge Engineering Bureau Group Co.,Ltd.(Grant No.DQJ-2020-B07)。
文摘Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in the field of underground space engineering.This paper presented a case study of tunnelling performance prediction method of CBM in sedimentary hard-rock tunnel of Karst landform type by using tunneling data and surrounding rock parameters.The uniaxial compressive strength(UCS),rock integrity factor(Kv),basic quality index([BQ]),rock quality index RQD,brazilian tensile strength(BTS) and brittleness index(BI) were introduced to construct a performance prediction database based on the hard-rock tunnel of Guiyang Metro Line 1 and Line 3,and then established the performance prediction model of cantilever boring machine.Then the deep belief network(DBN) was introduced into the performance prediction model,and the reliability of performance prediction model was verified by combining with engineering data.The study showed that the influence degree of surrounding rock parameters on the tunneling performance of the cantilever boring machine is UCS > [BQ] > BTS >RQD > Kv > BI.The performance prediction model shows that the instantaneous cutting rate(ICR) has a good correlation with the surrounding rock parameters,and the predicting model accuracy is related to the reliability of construction data.The prediction of limestone and dolomite sections of Line 3 based on the DBN performance prediction model shows that the measured ICR and predicted ICR is consistent and the built performance prediction model is reliable.The research results have theoretical reference significance for the applicability analysis and mechanical selection of cantilever boring machine for hard rock tunnel.
基金The research work described herein was funded by the National Natural Science Foundation of China(Grant No.51922067)The Key Research and Development Plan of Shandong Province of China(Grant No.2020ZLYS01)Taishan Scholars Program of Shan-dong Province of China(Grant No.tsqn201909003).
文摘Excavation under complex geological conditions requires effective and accurate geological forward-prospecting to detect the unfavorable geological structure and estimate the classification of surround-ing rock in front of the tunnel face.In this work,a forward-prediction method for tunnel geology and classification of surrounding rock is developed based on seismic wave velocity layered tomography.In particular,for the problem of strong multi-solution of wave velocity inversion caused by few ray paths in the narrow space of the tunnel,a layered inversion based on regularization is proposed.By reducing the inversion area of each iteration step and applying straight-line interface assumption,the convergence and accuracy of wave velocity inversion are effectively improved.Furthermore,a surrounding rock classification network based on autoencoder is constructed.The mapping relationship between wave velocity and classification of surrounding rock is established with density,Poisson’s ratio and elastic modulus as links.Two numerical examples with geological conditions similar to that in the field tunnel and a field case study in an urban subway tunnel verify the potential of the proposed method for practical application.
基金the support of the National Natural Science Foundation of China(Grant Nos.42207199,52179113,42272333)Zhejiang Postdoctoral Scientific Research Project(Grant Nos.ZJ2022155,ZJ2022156)。
文摘In areas with seasonal freezing,when the tunnel lining concrete is saturated with water infiltrating the interior,the lining and the surrounding rocks will simultaneously freeze.However,the current calculation of the frost heaving force fails to consider the synchronous damage to the lining and surrounding rocks under freeze-thaw cycles.Therefore,as per the elastic calculation model of the frost heaving force and model of steady-state heat transfer of circular tunnels,this study introduces the frost heaving rate of lining and surrounding rocks.First,the analytical solution of frost heaving force is obtained for simultaneous frost heaving of lining and surrounding rocks under any steady-state temperature field.Then,based on the fracture theory and meso-damage mechanics,the damage variables of lining and surrounding rocks under freeze-thaw cycles are extracted,representing their elastic modulus and porosity.Finally,the formula of frost heaving force for synchronous damage to the lining and surrounding rocks at any steady-state temperature field is obtained.The calculation results demonstrate that the lower the temperature inside the lining,the greater the frost heaving force.With the increasing number of freeze-thaw cycles,frost heaving force tends to gradually increase initially,reaching a peak value at 85 freeze-thaw cycles,decreasing to 80%of the peak value at 140 cycles before reaching a constant value.The lining participates in frost heaving,increasing the frost heaving force.The initial increase rate of frost heaving force is 15.7%.Changing the fitting coefficients s1 and s2 of the lining and surrounding rocks can effectively control the magnitude of the frost heaving force in the tunnels.
文摘The stability of strip footings subjected to eccentrically inclined loads is critical for reliable foundation design.This study investigates the effect of a circular unlined tunnel in a rock mass on the ultimate bearing capacity(UBC)of a foundation with width B under inclined and eccentric loads.Adaptive finite element limit analysis was employed to evaluate the reduction in UBC of the footing resting above a tunnel.The examined critical parameters include normalized load eccentricity(e/B),load inclination(β),and horizontal and vertical distances of the tunnel from the foundation(P/B and Q/B,respectively),along with rock mass properties.The results reveal that for e/B≥0.25 and≤60°,the reduction coefficient,Rc≥0.90,suggesting that the presence of a tunnel has a minimal impact on the load-bearing capacity of the footing,with failure primarily governed by load eccentricity and inclination.Additionally,potential failure mechanisms are explored,showing that at lower e/B,higherβ,and lower Q/B,the tunnel significantly affects footing's failure envelope.Conversely,at higher e/B and lowerβ,failure is due to rotational effects of footing,regardless of the tunnel's position.To predict the Rc more accurately,due to the time-consuming nature of direct calculations,both MLR and ANN models were developed.The MLR model provided a baseline for comparison,while the ANN model,with a coefficient of determination(R2)of 0.98,demonstrated superior accuracy compared to the R2=0.96 of MLR.Using both approaches ensured robust and efficient predictions of Rc.Since Rc does not directly provide the reduced UBC of footing due to presence of tunnel,the study introduced bearing capacity factor(Nc)to enable direct calculation of the reduced UBC of footing.These findings offer theoretical guidelines for preliminary design and provide practitioners with an effective tool for evaluating UBC reduction in complex loading scenarios involving tunnels.
基金supported by the Science and Technology Research and Development Program of CHINA RAILWAY(Grant No.K2018G014,K2020G035)the National Natural Science Foundation of China(Grant No.51878567,51878568).
文摘Purpose–The purpose of the study is to quickly identify significant heterogeneity of surrounding rock of tunnel face that generally occurs during the construction of large-section rock tunnels of high-speed railways.Design/methodology/approach–Relying on the support vector machine(SVM)-based classification model,the nominal classification of blastholes and nominal zoning and classification terms were used to demonstrate the heterogeneity identification method for the surrounding rock of tunnel face,and the identification calculation was carried out for the five test tunnels.Then,the suggestions for local optimization of the support structures of large-section rock tunnels were put forward.Findings–The results show that compared with the two classification models based on neural networks,the SVM-based classification model has a higher classification accuracy when the sample size is small,and the average accuracy can reach 87.9%.After the samples are replaced,the SVM-based classification model can still reach the same accuracy,whose generalization ability is stronger.Originality/value–By applying the identification method described in this paper,the significant heterogeneity characteristics of the surrounding rock in the process of two times of blasting were identified,and the identification results are basically consistent with the actual situation of the tunnel face at the end of blasting,and can provide a basis for local optimization of support parameters.
基金financially supported by the National Natural Science Foundation of China(Nos.41772287 and 41502268)the Research Program of Zhejiang Provincial Communication Department(No.2016-2-16)
文摘This study aims at the probabilistic assessment of tunnel convergence considering the spatial variability in rock mass properties. The method of interpolated autocorrelation combined with finite difference analysis is adopted to model the spatial variability of rock mass properties. An iterative procedure using the first-order reliability method(FORM) and response surface method(RSM) is employed to compute the reliability index and its corresponding design point. The results indicate that the spatial variability considerably affects the computed reliability index. The probability of failure could be noticeably overestimated in the case where the spatial variability is neglected. The vertical scale of fluctuation has a much higher effect on the probabilistic result with respect to the tunnel convergence than the horizontal scale of fluctuation. And the influence of different spacing of control points on the computational accuracy is investigated.
基金the financial support from the National Basic Research Program of China(973 Program)(Grant No.2015CB057906)the National Natural Science Foundation of China(Grant No.51409245)
文摘Foamed concrete has a good energy absorption capability and can be used as seismic isolation material for tunnels. This study aims to investigate the mechanical properties and associated seismic isolation effects of foamed concrete layer in rock tunnel. For this, a series of uniaxial/triaxial compression tests was conducted to understand the effects of concrete density, confining stress and strain rate on the mechanical properties of foamed concrete. The direct shear tests were also performed to investigate the effects of concrete density and normal stress on the nonlinear behaviors of foamed concrete layer-lining interface. The test results showed that the mechanical properties of foamed concrete are significantly influenced by the concrete density. The foamed concrete also has high volumetric compressibility and strain-rate dependence. The peak stress. residual stress. shear stiffness and residual friction coefficient of the foamed concrete layer-lining interface are influenced by the foamed concrete density and normal stress applied. Then, a crushable foam constitutive model was constructed using ABAQUS software and a composite exponential model was also established to study the relationship between shear stress and shear displacement of the interface, in which their parameters were fitted based on the experimental results. Finally, a parametric analysis using the finite element method(FEM) was conducted to understand the influence of foamed concrete layer properties on the seismic isolation effect, including the density and thickness of the layer as well as the shear stiffness and residual friction coefficient of the interface. It was revealed that lower density and greater thickness in addition to smaller shear stiffness or residual friction coefficient of the foamed concrete layer could yield better seismic isolation effect, and the influences of the first two tend to be more significant.
基金supported by National Natural Science Foundation of China (Grant No. 51075147)
文摘At present, the inner cutters of a full face rock tunnel boring machine (TBM) and transition cutter edge angles are designed on the basis of indentation test or linear grooving test. The inner and outer edge angles of disc cutters are characterized as symmetric to each other with respect to the cutter edge plane. This design has some practical defects, such as severe eccentric wear and tipping, etc. In this paper, the current design theory of disc cutter edge angle is analyzed, and the characteristics of the rock-breaking movement of disc cutters are studied. The researching results show that the rotational motion of disc cutters with the cutterhead gives rise to the difference between the interactions of inner rock and outer rock with the contact area of disc cutters, with shearing and extrusion on the inner rock and attrition on the outer rock. The wear of disc cutters at the contact area is unbalanced, among which the wear in the largest normal stress area is most apparent. Therefore, a three-dimensional model theory of rock breaking and an edge angle design theory of transition disc cutter are proposed to overcome the flaws of the currently used TBM cutter heads, such as short life span, camber wearing, tipping. And a corresponding equation is established. With reference to a specific construction case, the edge angle of the transition disc cutter has been designed based on the theory. The application of TBM in some practical project proves that the theory has obvious advantages in enhancing disc cutter life, decreasing replacement frequency, and making economic benefits. The proposed research provides a theoretical basis for the design of TBM three-dimensional disc cutters whose rock-breaking operation time can be effectively increased.
基金Supported by National Natural Science Foundation of China (Grant No.51075147)National Hi-tech Research and Development Program of China (863 Program,Grant No.2012AA041803)
文摘Wear is a major factor of disc cutters’ failure. No current theory offers a standard for the prediction of disc cutter wear yet. In the field the wear prediction method commonly used is based on the excavation length of tunnel boring machine(TBM) to predict the disc cutter wear and its wear law, considering the location number of each disc cutter on the cutterhead(radius for installation); in theory, there is a prediction method of using arc wear coefficient. However, the preceding two methods have their own errors, with their accuracy being 40% or so and largely relying on the technicians’ experience. Therefore, radial wear coefficient, axial wear coefficient and trajectory wear coefficient are defined on the basis of the operating characteristics of TBM. With reference to the installation and characteristics of disc cutters, those coefficients are modified according to penetration, which gives rise to the presentation of comprehensive axial wear coefficient, comprehensive radial wear coefficient and comprehensive trajectory wear coefficient. Calculation and determination of wear coefficients are made with consideration of data from a segment of TBM project(excavation length 173 m). The resulting wear coefficient values, after modification, are adopted to predict the disc cutter wear in the follow-up segment of the TBM project(excavation length of 5621 m). The prediction results show that the disc cutter wear predicted with comprehensive radial wear coefficient and comprehensive trajectory wear coefficient are not only accurate(accuracy 16.12%) but also highly congruous, whereas there is a larger deviation in the prediction with comprehensive axial wear coefficient(accuracy 41%, which is in agreement with the prediction of disc cutters’ life in the field). This paper puts forth a new method concerning prediction of life span and wear of TBM disc cutters as well as timing for replacing disc cutters.