Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in th...Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in the fluctuant and complex state and many meteorological factors,such as sunshine radiation,temperature and wind,have important influence on the change of stress of the steel box girders. According to the real-time weather data,the stress data after the process of wavelet denoising from representative measuring points in different weather conditions is picked to establish the stress response brought by meteorological factors with Layered Separation method,thereby basically eliminating the influence of meteorological factors on the stress of main girders,so that accurate and reliable stress data can be got for steel box girders adjustment and cable-tensioned construction control.展开更多
基金National "the 11th Five-Year" Science-Technological Support Program(No.2006BAG04B01)"973"Program(No.2002CB412707)
文摘Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in the fluctuant and complex state and many meteorological factors,such as sunshine radiation,temperature and wind,have important influence on the change of stress of the steel box girders. According to the real-time weather data,the stress data after the process of wavelet denoising from representative measuring points in different weather conditions is picked to establish the stress response brought by meteorological factors with Layered Separation method,thereby basically eliminating the influence of meteorological factors on the stress of main girders,so that accurate and reliable stress data can be got for steel box girders adjustment and cable-tensioned construction control.
文摘为揭示预应力箱型梁桥遭受超高车辆撞击下的损伤,将此类撞击的数字仿真与试验对比研究了箱型梁桥上部结构动态响应.运用LS-DYNA软件建立了精细化预应力箱型梁桥上部结构的三维分离式模型和车辆与桥梁上部结构的耦合模型,在汽车以80 km/h速度正面撞击桥梁时,研究桥梁、汽车的破坏损伤和桥梁整体位移,分析比较了车速分别为30、50、80 km/h时,桥梁上部结构遭受超高车辆撞击的动态响应.研究结果表明:质量较大的预应力箱型梁桥上部结构遭受超高车辆撞击时,桥梁整体损伤较小,应主要研究其局部破坏;撞击过程中车厢的形变会导致车-桥之间撞击形式由正面撞击向冲切撞击转变;车-桥碰撞力值和桥梁撞击区域位移值均与车速成正相关,当车速为80 km/h时的最大位移值为165 mm.