期刊文献+
共找到12,403篇文章
< 1 2 250 >
每页显示 20 50 100
Discussion on Construction Technology of Subway Tunnel Expansion under Bridge Foundation
1
作者 Ruiquan Liu 《Journal of Architectural Research and Development》 2024年第2期37-42,共6页
As the urban populations grow,the number and size of subway construction projects are increasing while also meeting higher construction standards.So,subway construction projects must have a better understanding of con... As the urban populations grow,the number and size of subway construction projects are increasing while also meeting higher construction standards.So,subway construction projects must have a better understanding of construction technology.This article focuses on the construction technology of the subway tunnel expansion under the bridge foundation.By analyzing the engineering characteristics of the bridge foundation and using a project as an example,this article provides a detailed discussion of the construction process of tunnel expansion under a bridge foundation.This article aims to serve as a reference for subway tunnel construction in China to ensure the key points of construction technology are understood,thus improving construction quality and laying a solid technical foundation for the sustainable development of urban rail engineering. 展开更多
关键词 Subway tunnel Bridge foundation underpass expansion construction technology Steel truss support construction
下载PDF
Construction Technology of Pile Foundation for Subway Tunnel Crossing Bridge
2
作者 Ruiquan Liu 《Journal of World Architecture》 2024年第2期37-42,共6页
Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influe... Urban infrastructure has become more complex with the rapid development of urban transportation networks.In urban environments with limited space,construction of facilities like subways and bridges may mutually influence each other,especially when subway construction requires passing under bridges.In such cases,pile foundation replacement technology is often necessary.However,this technology is highly specialized,with a lengthy and risky construction period,and high costs.Personnel must be proficient in key technical aspects to ensure construction quality.This article discusses the technical principle,construction process,and core technology of pile foundation replacement,along with the application of this technology in subway tunnel crossing bridge projects,supported by engineering examples for reference. 展开更多
关键词 Subway tunnel Bridge pile foundation Replacement construction
下载PDF
Mechanical behavior of segment rebar of shield tunnel in construction stage 被引量:12
3
作者 Jun-sheng CHEN Hai-hong MO 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2008年第7期888-899,共12页
In this paper, a 3D finite element (FE) program ADINA was applied to analyzing a tunnel with 9 segment tings. The loads acting on these segment tings included the squeezing action of tail brush of shield machine und... In this paper, a 3D finite element (FE) program ADINA was applied to analyzing a tunnel with 9 segment tings. The loads acting on these segment tings included the squeezing action of tail brush of shield machine under attitude deflection, the jacking forces, the grouting pressure and the soil pressure. The analyses focused on the rebar stress in two statuses: (1) normal construction status without shield machine squeezing; (2) squeezing action induced by shield machine under attitude deflection. The analyses indicated that the rebar stress was evidently affected by the construction loads. In different construction status, the rebar stress ranges from -80 MPa to 50 MPa, and the rebar is in elastic status. Even some cracks appear on segments, the stress of segment rebar is still at a low level. It is helpful to incorporate a certain quantity of steel fiber to improve the anti-crack and shock resistance performance. 展开更多
关键词 Shield tunnel construction SEGMENT REBAR Finite element (FE) analysis
下载PDF
3D Finite Element Simulation of Tunnel Boring Machine Construction Processes in Deep Water Conveyance Tunnel 被引量:4
4
作者 钟登华 佟大威 《Transactions of Tianjin University》 EI CAS 2009年第2期101-107,共7页
Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excav... Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excavation process is dynamically simulated to analyze the stress and strain field status of surrounding rock and segment.The maximum tensile stress of segment ring caused by tunnel construction mainly lies in arch bottom and presents zonal distribution.The stress increases slightly and limitedly in the course of excavation.The maximum and minimum displacements of segment,manifesting as zonal distribution,distribute in arch bottom and vault respectively.The displacements slightly increase with the advance of TBM and gradually tend to stability. 展开更多
关键词 water conveyance tunnel tunnel boring machine construction 3D finite element method numerical analysis SIMULATION
下载PDF
Probabilistic prediction of expected ground condition and construction time and costs in road tunnels 被引量:4
5
作者 A.Mahmoodzadeh S.Zare 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2016年第5期734-745,共12页
Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic est... Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on Monte-Carlo (MC) simulation. The former provides the probabilistic description of ground classification along tunnel alignment according to the geological information revealed from geological profile and boreholes. The latter provides the probabilistic description of the expected construction time and costs for each operation according to the survey feedbacks from experts. Then an engineering application to Hamro tunnel is presented to demonstrate how the ground condition and the construction time and costs are estimated in a probabilistic way. In most items, in order to estimate the data needed for this methodology, a number of questionnaires are distributed among the tunneling experts and finally the mean values of the respondents are applied. These facilitate both the owners and the contractors to be aware of the risk that they should carry before construction, and are useful for both tendering and bidding. 展开更多
关键词 Markov process Geological condition Monte-Carlo (MC) simulation construction time and costs Hamro tunnel
下载PDF
Ground movement induced by triple stacked tunneling with different construction sequences 被引量:1
6
作者 Yao Hu Huayang Lei +4 位作者 Gang Zheng Liang Shi Tianqi Zhang Zhichao Shen Rui Jia 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2022年第5期1433-1446,共14页
This study tried to explore the ground movement induced by triple stacked tunneling(TST) with different construction sequences. A case study in Tianjin, China was used to investigate the ground movement during the TST... This study tried to explore the ground movement induced by triple stacked tunneling(TST) with different construction sequences. A case study in Tianjin, China was used to investigate the ground movement during the TST(upper tunneling(UT)). For this, a modified Peck formula was proposed to predict the surface settlement induced by TST. Next, three sets of finite element analyses(FEA) were used to compare the effects of construction sequences(i.e. UT, middle tunneling(MT), and lower tunneling(LT)) on vertical and lateral ground displacements. The results of Tianjin case and UT reveal that compared to a Gaussian distribution for a single tunnel, the surface settlement curve of triple stacked tunnels is a bimodal distribution. It seems that the proposed modified Peck formula can effectively predict the surface settlement induced by TST. The results of the three sets of FEA demonstrate that the construction sequence has a significant influence on the ground movement. Among the three construction sequences, the largest lateral displacement is observed in the MT and the smallest one in UT.The existing tunnel has an inhibitory effect on the vertical displacement. The maximum value of the lateral displacement occurs at the depth of the new tunnel in each construction sequence. 展开更多
关键词 Triple stacked tunneling(TST) Ground movement construction sequence Case study Surface settlement prediction Finite element analysis
下载PDF
Construction Technology for New Arched All-Steel Earth-inserted Tunnel
7
作者 Xincheng SUN Yuanhua ZHAN +6 位作者 Jun TIAN Zhongwu ZHANG Liangyong YANG Weiping CHEN Yuanqun PENG Jie KANG Xiufang Bai 《Agricultural Biotechnology》 CAS 2018年第3期187-190,共4页
According to the influence of climatic conditions on vegetable production in the Yangtze River Basin,the existing arched tunnel was improved through investigation to provide guidance for the construction of arched ste... According to the influence of climatic conditions on vegetable production in the Yangtze River Basin,the existing arched tunnel was improved through investigation to provide guidance for the construction of arched steel tunnels in this area. 展开更多
关键词 Earth-inserted tunnel All-steel structure construction technology
下载PDF
Research on Deformation Control Indicators and Standard of Urban Traffic Tunnel Construction Adjacent to High-rise Building
8
作者 Bo Shi Kun Wang Ke Li 《Journal of Architectural Research and Development》 2020年第6期24-30,共7页
The biggest environmental problem caused by the construction of tunnels adjacent to high-rise buildings is the settlement of buildings.The paper analyzes the influence of tunnel excavation on the deformation of the su... The biggest environmental problem caused by the construction of tunnels adjacent to high-rise buildings is the settlement of buildings.The paper analyzes the influence of tunnel excavation on the deformation of the superstructure and the deformation mode of the superstructure.It introduces the indicators and standards for the construction control of tunnel adjacent to the building at home and abroad.Combined with the Yuzhong tunnel project under construction in Chongqing,the main monitoring indicators and control standards of the Yuzhong Tunnel passing through the main buildings are given after comprehensive analysis and considerations,which provide a reference for the deformation control indicators of similar urban traffic tunnels adjacent to high-rise buildings. 展开更多
关键词 Deformation Control Indicators Urban Traffic tunnel construction High-rise Building
下载PDF
Study on Ground Deformation during Shield Tunnel Construction
9
作者 Zhongkun Zhang 《Journal of Construction Research》 2021年第2期19-26,共8页
Through the systematic analysis of the ground settlement generated by the process of shield tunneling,the relationships between ground deformation and construction parameters are studied in this paper.Based on the ass... Through the systematic analysis of the ground settlement generated by the process of shield tunneling,the relationships between ground deformation and construction parameters are studied in this paper.Based on the assumption of linear small deformation,a mathematical model of the relationship between ground deformation and construction parameters is set up.The principle and method of optimization for estimating ground deformation is studied.The actual measured data are compared with the results of theoretical analysis in a case.Considering different ground formations in different construction sites with different adverse effects on surface and underground structures,the ground surface deformations caused by shield tunneling is an aimed topic in this paper.The contributions and research implications are the revealed relationships between the ground deformation and the shield tunneling parameters during construction. 展开更多
关键词 Shield tunnel Ground settlement construction parameters Mathematical model Maximum estimation Shield tunnel Ground settlement construction parameters Mathematical model Maximum estimation
下载PDF
COMPARATIVE STUDY OF GREENHOUSE GAS EMISSIONS FROM HAND TUNNELING AND PILOT TUBE METHOD UNDERGROUND CONSTRUCTION METHODS
10
作者 Sadegh Mohit Mahsa Ahmadian Nezhad Monfared +1 位作者 Chao Kang Alireza Bayat 《Journal of Green Building》 2017年第4期54-69,共16页
The negative effects of greenhouse gas(GHG)emissions,such as climate change and global warming,have become major environmental concerns,especially for the construction industry,which is the third-highest source of GHG... The negative effects of greenhouse gas(GHG)emissions,such as climate change and global warming,have become major environmental concerns,especially for the construction industry,which is the third-highest source of GHG emissions among industrialized countries.Presently,underground utility projects are considered one of the most common types of construction,primarily due to aging infrastructure across North America and the subsequent rehabilitation of old pipelines and installation of new pipelines and facilities.Given the increasing demand being placed on the industry,the need to study airborne emissions associated with different underground construction technologies has risen,which will be helpful in selecting the most sus-tainable underground construction methods.This study investigates pollutant emis-sion from two common trenchless methods used in underground construction,hand tunneling and pilot-tube method(PTM),through their varying GHG footprint sources and emissions measured by the United States Environmental Protection Agency(EPA).This paper analyzes a case from Edmonton,Canada,in which both PTM and hand tunneling were used by comparing the suggested indexes,including HC,CO,NO_(3) PM,CO_(2),and SO_(2).In this case study,both methods were used in the installation of a new 68-cm diameter(27 in.)clay sewer line with an overbur-den depth of 12.9 m(42 ft)and length of 60 m(197 ft).Results indicated that the amount of airborne emissions was reduced between 17%and 36%through the use of PTM compared to the traditional hand tunnelling method. 展开更多
关键词 Greenhouse Gases CO_(2)Emissions Sustainable Development Underground construction Hand tunneling Pilot-Tube Method
下载PDF
Research on Construction Control Technology of Large-Span and Small Clear Distance Underpass High-Voltage Line Tunnel
11
作者 Kun Wang Lushi Wang Daoliang Wang 《Journal of World Architecture》 2021年第1期11-16,共6页
Hanping tunnel is a control project of national highway 310 Dahejia to Qingshui highway project.It needs to cross a 330kV high-voltage transmission line under the condition of small clear distance,which requires high ... Hanping tunnel is a control project of national highway 310 Dahejia to Qingshui highway project.It needs to cross a 330kV high-voltage transmission line under the condition of small clear distance,which requires high construction requirements.In view of the difficulties such as shallow buried depth of tunnel and small clear distance between tunnel and tower of high-voltage line,multiple excavation blasting method is adopted,and smooth blasting,charge quantity control and damping hole setting are comprehensively used to reduce the impact on the tower and structure of high-voltage line.In order to ensure the smooth progress of the project,the large-scale finite element analysis software is used to simulate the whole excavation project.The influence of the full-section method and the middle partition wall method(CD method)on the surrounding rock and the high-voltage electric tower is compared.It is found that the CD method can effectively control the displacement of the surrounding rock and the tower on it and the uneven settlement. 展开更多
关键词 Large-span tunnel High-voltage tower construction control
下载PDF
Case Study on Synchronous Construction Technology for Secondary Lining of Large-diameter Single track Shiel Shield-bored ored Tunnel
12
作者 WANG Zhenfei ZHAI Jinying(Translated) 《Chinese Railways》 2023年第2期29-34,共6页
The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the... The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the organization of the construction activities in the small and confined area,the horizontal transportation for shield boring and high safety management requirements.A super-long invert lining construction jumbo,as well as the matching California switch,is developed,which provides solution for the confliction between the invert lining construction and the horizontal transportation.The procedure and method for the synchronous operation of the shield boring and the secondary lining are developed by referring to the synchronous construction of the secondary lining during the boring of the TBMs in hard rocks.Due to the adoption of the synchronous operation of the shield boring and the secondary lining,the construction period is shortened and the construction cost is reduced.The paper can provide reference for the synchronous construction of the secondary lining in similar projects in the future. 展开更多
关键词 large-diameter shield-bored tunnel synchronous construction of secondary lining super-long invert lining construction jumbo California switch "arch+side wall"lining jumbo
下载PDF
PRESENT SITUATION AND FUTURE PROSPECT OF APPLICATION OF TUNNELING MACHINE TO CHINESE UNDERGROUND ENGINEERING CONSTRUCTION 被引量:2
13
作者 Qian Qihu (Chinese Academy of Engineering, Beijing 100857 China) 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2003年第12期2071-2080,共10页
The application of tunneling machine to Chinese underground engineering construction is outlined,and its future prospect is forecasted in the light of the requirements for Chinese underground engineering construction ... The application of tunneling machine to Chinese underground engineering construction is outlined,and its future prospect is forecasted in the light of the requirements for Chinese underground engineering construction in the 21st century. Further suggestion is put forward on the effective use of tunneling machine. 展开更多
关键词 隧道 掘进机 中国 地下工程 发展前景
下载PDF
Applications of Pre-Geological Prediction in Tunnel Construction 被引量:1
14
作者 YANG Hui-jun WANG Meng-shu LIU Gao 《Journal of China University of Mining and Technology》 EI 2005年第3期203-207,共5页
Pre-geological prediction (PGP) is defined as the prediction of engineering geologic condition and hy-drogeological condition certain distance ahead of the working face. The purpose of this paper is to introduce mainl... Pre-geological prediction (PGP) is defined as the prediction of engineering geologic condition and hy-drogeological condition certain distance ahead of the working face. The purpose of this paper is to introduce mainlygeologic survey before and in excavation, to clarify their emphasis on PGP. At the same time, the technique is appliedto an engineering case, the longest highway tunnel in Gansu province. Data of geological survey of outside tunnels,sound wave detection, and geologic sketch for both tunnel face and sidewalls within the tunnel are analyzed. Afteranalyzing these data, long-term pre-geological prediction forecasting basic geological conditions of fault 4 such aslithology, scope, location, etc., and short-term and more accurate pre-geological prediction are reported. 展开更多
关键词 pre-geological prediction geologic survey tunnel construction
下载PDF
A construction strategy for a tunnel with big deformation 被引量:2
15
作者 Liang Chen Shougen Chen Xinrong Tan 《Journal of Modern Transportation》 2013年第2期86-94,共9页
By integrating literature reviews, site observa- tion, field monitoring, theoretical analysis, summarization, etc., a construction strategy was proposed and verified for tunneling with big deformation in this paper. T... By integrating literature reviews, site observa- tion, field monitoring, theoretical analysis, summarization, etc., a construction strategy was proposed and verified for tunneling with big deformation in this paper. The tunnel was in phyllite, shotcrete cracks and steel arch distortion were observed, and a big deformation with a maximum of 2.0 m was monitored during the initial stage of the construction. Through carefully examining the site observation and laboratory test results, a construction principle was established for the tunneling on the basic concept of maintaining the rock strength/stiffness and keeping the rock dry, by providing confinement pressure to the rock, reducing the rock exposure time, keeping water out of the tunnel, etc. To achieve the construction principle, a set of specific construction measures with 11 items was further proposed and applied to the construction. To check the effectiveness of the construction measures, field monitoring was carried out, which showed that the rock deformation was well controlled and the tunnel became stable. An allowable deformation was then determined using the Fenner formulae and the monitored data in order to guide further construction, which received a good result. From this study, it can be concluded that providing quick strong initial support and reserving core soil at the working faceare extremely important to control the rock deformation and keep the tunnel stable. 展开更多
关键词 tunnel engineering Big deformation construction strategy
下载PDF
Conception and Exploration of Using Data as a Service in Tunnel Construction with the NATM 被引量:5
16
作者 Bowen Du Yanliang Du +1 位作者 Fei Xu Peng He 《Engineering》 2018年第1期123-130,共8页
The New Austrian Tunneling Method (NATM) has been widely used in the construction of mountain tun- nels, urban metro lines, underground storage tanks, underground power houses, mining roadways, and so on, The variat... The New Austrian Tunneling Method (NATM) has been widely used in the construction of mountain tun- nels, urban metro lines, underground storage tanks, underground power houses, mining roadways, and so on, The variation patterns of advance geological prediction data, stress-strain data of supporting struc- tures, and deformation data of the surrounding rock are vitally important in assessing the rationality and reliability of construction schemes, and provide essential information to ensure the safety and scheduling of tunnel construction, However, as the quantity of these data increases significantly, the uncertainty and discreteness of the mass data make it extremely difficult to produce a reasonable con- struction scheme; they also reduce the forecast accuracy of accidents and dangerous situations, creating huge challenges in tunnel construction safety, In order to solve this problem, a novel data service system is proposed that uses data-association technology and the NATM, with the support of a big data environ- ment, This system can integrate data resources from distributed monitoring sensors during the construc- tion process, and then identify associations and build relations among data resources under the same construction conditions, These data associations and relations are then stored in a data pool, With the development and supplementation of the data pool, similar relations can then he used under similar con- ditions, in order to provide data references for construction schematic designs and resource allocation, The proposed data service system also provides valuable guidance for the construction of similar projects. 展开更多
关键词 New Austrian tunneling Method Big DATA environments DATA AS a SERVICE tunnel construction
下载PDF
Research on Combined Construction Technology for Cross-Subway Tunnels in Underground Spaces 被引量:4
17
作者 Xiangsheng Chen 《Engineering》 2018年第1期103-111,共9页
Given the increasingly notable segmentation of underground space by existing subway tunnels, it is dif- ficult to effectively and adequately develop and utilize underground space in busy parts of a city. This study pr... Given the increasingly notable segmentation of underground space by existing subway tunnels, it is dif- ficult to effectively and adequately develop and utilize underground space in busy parts of a city. This study presents a combined construction technology that has been developed for use in underground spaces; it includes a deformation buffer layer, a special grouting technique, jump excavation by compart- ment, back-pressure portal frame technology, a reinforcement technique, and the technology of a steel portioning drum or plate. These technologies have been successfully used in practical engineering. The combined construction technology presented in this paper provides a new method of solving key techni- cal problems in underground spaces in effectively used cross-subway tunnels. As this technology has achieved significant economic and social benefits, it has valuable future applications. 展开更多
关键词 Operating SUBWAY tunnel UNDERGROUND SPACE construction COMBINED technology
下载PDF
Construction Technology of Large-deformation High Geostress Soft Rock Tunnel 被引量:1
18
作者 Xuguang Zheng Heng Zhang Xuesong Su 《Journal of World Architecture》 2021年第1期30-32,共3页
In the process of tunnel construction,if large-deformation occurs in high geostress soft rock,it will likely cause geological disasters.This situation will not only seriously affect the smooth progress of tunnel const... In the process of tunnel construction,if large-deformation occurs in high geostress soft rock,it will likely cause geological disasters.This situation will not only seriously affect the smooth progress of tunnel construction,but also cause serious safety threat to the construction personnel.Therefore,with the continuous growth in the number and scale of tunnel construction in recent years,the construction technology for high geostress soft rock with large-deformation has begun to receive more and more attention from the society.Based on this,this paper takes an actual project as an example to analyze the specific application of the technology in order to improve the construction effect and avoid the damage caused by the large-deformation of the high geostress soft rock. 展开更多
关键词 tunnel construction High geostress soft rock LARGE-DEFORMATION construction technology
下载PDF
Structural mechanism and construction method of mud and water inrush in Xiangyun tunnel of Guangtong-Dali railway
19
作者 WANG Yawei 《Global Geology》 2019年第3期167-178,共12页
Mud and water inrush in tunnel is a common problem in the construction process. Nowadays, the research and classification on this are mostly focused on karst situations. According to the characteristics of the surroun... Mud and water inrush in tunnel is a common problem in the construction process. Nowadays, the research and classification on this are mostly focused on karst situations. According to the characteristics of the surrounding rock and damage forms of the tunnel in the studied area, the author analyzed the geological and structural characteristics of mud and water inrush in tunnel and obtained their construction type. Meanwhile, the advanced water detection under the complex geological conditions was studied by using induced polarization method, transient electromagnetic method and three-dimensional seismic method, it can be concluded that the water-rich fracture zone exists within the detection range with a risk of large mud and water inrush disaster. The concrete construction treatment measures are put forward:①cement-water glass binary slurry is selected as the material for ground and hole grouting, its advantage is that the gel time can be controlled, and it has certain grout ability in the strata with large permeability coeffcient, which is conducive to excavate construction immediately after grouting.②applying the mature retrograde grouting construction can reduce grouting time and improve the excavation efficiency. 展开更多
关键词 MUD and water inrush geological model Xiangyun tunnel Guangtong-Dali RAILWAY STRUCTURAL mechanism construction method
下载PDF
Comprehensive Management Strategy for Tunnel Construction Quality Inspection and Monitoring
20
作者 Xiong Zhou 《Journal of Architectural Research and Development》 2021年第1期13-16,共4页
With the increase in the number and scale of tunnel projects in China in recent years,the comprehensive management for quality inspection and monitoring measurement in the tunnel construction process is receiving more... With the increase in the number and scale of tunnel projects in China in recent years,the comprehensive management for quality inspection and monitoring measurement in the tunnel construction process is receiving more and more attention.Based on this,this paper analyzes the comprehensive management of quality inspection and monitoring during tunnel construction to ensure the quality of tunnel construction. 展开更多
关键词 tunnel construction Quality inspection Monitoring and measurement Comprehensive management
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部