Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a n...Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a new-style construction method, there are several specific risks involved in the construction process. Based on the test section of Sanyuanqiao station on Beijing metro line 10, and combined with the existing methods of risk identification at present, including a review of world-wide operational experience of similar projects, the study of generic guidance on hazards associated with the type of work being undertaken, and discussions with qualified and experienced staff from the project team, etc., the specific risks during the construction process of the metro station constructed by enlarging shield tunnels combined with the cut-and-cover method are identified. The results show that the specific risks mainly come from three construction processes which include constructing upper enclosure structures, excavating the soil between shield tunnels and demolishing shield segments. Then relevant risk mitigation measures are put forward. The results can provide references for scheme improvement and a comprehensive risk assessment of the new-style construction method.展开更多
Magnetic coils for specific requirements are widely used in modern quantum physics. In this study, a general analytical method of designing the shielded coils for generating an arbitrary axial magnetic field is propos...Magnetic coils for specific requirements are widely used in modern quantum physics. In this study, a general analytical method of designing the shielded coils for generating an arbitrary axial magnetic field is proposed. The theoretical formula for an axial magnetic field generated by a single shielded coil is obtained and used to construct specific coils. The structural parameters of these coils are determined by fitting the theoretical formula with their specific requirements. The feasibility of this method is proved by realizing four concrete kinds of coils: uniform magnetic field generating coils, gradient magnetic field generating coils, asymmetrical uniform magnetic field generating coils, and parabolic magnetic field generating coils. The correctness of these theoretical results is demonstrated by both the finite element simulations and the relevant experimental results. Furthermore, the application of this method is of great significance for developing the quantum physics and quantum devices in future.展开更多
The variation of air temperature measurement errors using two different radiation shields (DTR502B Vaisala,Finland,and HYTFZ01,Huayun Tongda Satcom,China) was studied.Datasets were collected in the field at the Daxi...The variation of air temperature measurement errors using two different radiation shields (DTR502B Vaisala,Finland,and HYTFZ01,Huayun Tongda Satcom,China) was studied.Datasets were collected in the field at the Daxing weather station in Beijing from June 2011 to May 2012.Most air temperature values obtained with these two commonly used radiation shields were lower than the reference records obtained with the new Fiber Reinforced Polymers (FRP) Stevenson screen.In most cases,the air temperature errors when using the two devices were smaller on overcast and rainy days than on sunny days; and smaller when using the imported rather than the Chinese shield.The measured errors changed sharply at sunrise and sunset,and reached maxima at noon.Their diurnal variation characteristics were,naturally,related to changes in solar radiation.The relationships between the record errors,global radiation,and wind speed were nonlinear.An improved correction method was proposed based on the approach described by Nakamura and Mahrt (2005) (NM05),in which the impact of the solar zenith angle (SZA) on the temperature error is considered and extreme errors due to changes in SZA can be corrected effectively.Measurement errors were reduced significantly after correction by either method for both shields.The error reduction rate using the improved correction method for the Chinese and imported shields were 3.3% and 40.4% higher than those using the NM05 method,respectively.展开更多
A case of Qinghuayuan tunnel excavation below the existing Beijing Subway Line 10 is presented.The new Qinghuayuan tunnel,part of the Beijing-Zhangjiakou High-speed Railway,was excavated by a shield machine with an ou...A case of Qinghuayuan tunnel excavation below the existing Beijing Subway Line 10 is presented.The new Qinghuayuan tunnel,part of the Beijing-Zhangjiakou High-speed Railway,was excavated by a shield machine with an outer diameter of 12.2 m.The existing subway was excavated by shallow tunnelling method.The project layout,geological conditions,reinforcement measures,operational parameters of shield machine and monitoring results of the project are introduced.During the Qinghuayuan tunnel excavation below the existing subway,total thrust,shield driving speed,cutterhead rotation speed and torque were manually controlled below the average values obtained from the previous monitoring of this project,which could effectively reduce the disturbance of the surrounding soil induced by shield excavation.The Gaussian fitting function can appropriately fit both the ground and the existing subway settlements.The trough width is influenced not only by the excavation overburden depth,but also by the forepoling reinforcement and tail void grouting measures.展开更多
基金Beijing Science and Technology Planning Project(No.D0604003040921)
文摘Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a new-style construction method, there are several specific risks involved in the construction process. Based on the test section of Sanyuanqiao station on Beijing metro line 10, and combined with the existing methods of risk identification at present, including a review of world-wide operational experience of similar projects, the study of generic guidance on hazards associated with the type of work being undertaken, and discussions with qualified and experienced staff from the project team, etc., the specific risks during the construction process of the metro station constructed by enlarging shield tunnels combined with the cut-and-cover method are identified. The results show that the specific risks mainly come from three construction processes which include constructing upper enclosure structures, excavating the soil between shield tunnels and demolishing shield segments. Then relevant risk mitigation measures are put forward. The results can provide references for scheme improvement and a comprehensive risk assessment of the new-style construction method.
基金Project supported by the National Natural Science Foundation of China(Grant Nos.61701515 and 61671458)the Postdoctoral Science Foundation,China(Grant No.2017M613367)+1 种基金the Natural Science Foundation of Hunan Province,China(Grant No.2018JJ3608)the Research Project of National University of Defense Technology,China(Grant No.ZK170204)
文摘Magnetic coils for specific requirements are widely used in modern quantum physics. In this study, a general analytical method of designing the shielded coils for generating an arbitrary axial magnetic field is proposed. The theoretical formula for an axial magnetic field generated by a single shielded coil is obtained and used to construct specific coils. The structural parameters of these coils are determined by fitting the theoretical formula with their specific requirements. The feasibility of this method is proved by realizing four concrete kinds of coils: uniform magnetic field generating coils, gradient magnetic field generating coils, asymmetrical uniform magnetic field generating coils, and parabolic magnetic field generating coils. The correctness of these theoretical results is demonstrated by both the finite element simulations and the relevant experimental results. Furthermore, the application of this method is of great significance for developing the quantum physics and quantum devices in future.
基金financially supported by the Meteorological Key Technology Integration and Application Project funded by the China Meteorological Administration (Grant No.CAMGJ2012M01)the Special Fund of Beijing Meteorological Bureau (Grant No.2011BMBKYZX04)the Nation Natural Science Foundation of China (Grant No.41275114)
文摘The variation of air temperature measurement errors using two different radiation shields (DTR502B Vaisala,Finland,and HYTFZ01,Huayun Tongda Satcom,China) was studied.Datasets were collected in the field at the Daxing weather station in Beijing from June 2011 to May 2012.Most air temperature values obtained with these two commonly used radiation shields were lower than the reference records obtained with the new Fiber Reinforced Polymers (FRP) Stevenson screen.In most cases,the air temperature errors when using the two devices were smaller on overcast and rainy days than on sunny days; and smaller when using the imported rather than the Chinese shield.The measured errors changed sharply at sunrise and sunset,and reached maxima at noon.Their diurnal variation characteristics were,naturally,related to changes in solar radiation.The relationships between the record errors,global radiation,and wind speed were nonlinear.An improved correction method was proposed based on the approach described by Nakamura and Mahrt (2005) (NM05),in which the impact of the solar zenith angle (SZA) on the temperature error is considered and extreme errors due to changes in SZA can be corrected effectively.Measurement errors were reduced significantly after correction by either method for both shields.The error reduction rate using the improved correction method for the Chinese and imported shields were 3.3% and 40.4% higher than those using the NM05 method,respectively.
基金Project(U1934210)supported by the Key Project of High-speed Rail Joint Fund of National Natural Science Foundation of ChinaProject(8202037)supported by the Natural Science Foundation of Beijing,China。
文摘A case of Qinghuayuan tunnel excavation below the existing Beijing Subway Line 10 is presented.The new Qinghuayuan tunnel,part of the Beijing-Zhangjiakou High-speed Railway,was excavated by a shield machine with an outer diameter of 12.2 m.The existing subway was excavated by shallow tunnelling method.The project layout,geological conditions,reinforcement measures,operational parameters of shield machine and monitoring results of the project are introduced.During the Qinghuayuan tunnel excavation below the existing subway,total thrust,shield driving speed,cutterhead rotation speed and torque were manually controlled below the average values obtained from the previous monitoring of this project,which could effectively reduce the disturbance of the surrounding soil induced by shield excavation.The Gaussian fitting function can appropriately fit both the ground and the existing subway settlements.The trough width is influenced not only by the excavation overburden depth,but also by the forepoling reinforcement and tail void grouting measures.