In practical application, it is very important to master the influence of structure parameters on the mid-span deflection quantificationally. For large-span and heavy-duty gantry cranes, the influence of the rigid leg...In practical application, it is very important to master the influence of structure parameters on the mid-span deflection quantificationally. For large-span and heavy-duty gantry cranes, the influence of the rigid leg and the soft leg on mid-span deflection has not been considered in the past. In the paper, the mathematical model is established for universal large-span and heavy-duty gantry cranes. The analytical solution for the mid-span deflection of gantry-frame structure girder is derived and obtained based on the variation principle by considering the coupling effect of the bending moments of girder and legs, the axial force and the secondary bending moments. The relation between the load and the deflection on the mid-span of the gantry-frame structure girder is known. Then, the experimental model is designed according to dimensional analysis method. And experiments were performed on the WEW-600 B type testing machine. Hackling experimental data, the regular of the load and deflection on the girder mid-span is obtained, namely, the deformation of the gantry-frame structure resists the external load to do work. The validity of the nonlinear analytical solution of the girder deflection is verified. Experimental results show that the analytical solution of the gantry-frame structure deflection has much higher calculation accuracy than previous calculation method. This work provides a theoretical basis for the design and inspection of gantry-frame structures.展开更多
A model for supercapacitor voltage equalization strategy is analyzed, and on this basis a supercapacitor voltage equalization method for Rubber Tyred Gantry Crane (RTG) energy saving system is proposed, namely active ...A model for supercapacitor voltage equalization strategy is analyzed, and on this basis a supercapacitor voltage equalization method for Rubber Tyred Gantry Crane (RTG) energy saving system is proposed, namely active voltage equalization method based on Buck-Boost converter. The equalizing speed of the proposed method is fast. Firstly, the working principle and process of the voltage equalization circuit is analyzed in detail. In addition, design of active voltage equalization circuit parameters and control strategy are given. Finally, simulation analysis of the series connection of supercapacitors module is performed. Results show that this method for equalizing voltage can avoid over-voltage of each cell and possess practicable and high value for supercapacitor RTG energy saving system.展开更多
For a gantry crane system, this paper presents a comparison between four control algorithms. These algo-rithms are being compared on simplicity, stability and robustness. Goal for the controller is to move the load on...For a gantry crane system, this paper presents a comparison between four control algorithms. These algo-rithms are being compared on simplicity, stability and robustness. Goal for the controller is to move the load on a gantry crane to a new position with minimal overshoot of the load and maximal speed of the load. An-other goal is to provide an insight in the behaviour of the possible controllers. In this article a parallel P-controller, cascade P-controller, fuzzy controller and an internal model controller are used. To be able to validate and design the controllers a model is derived from the gantry crane. The controllers and the model are being implemented in Matlab Simulink. Finally the controllers are validated and tuned in Labview on a laboratory gantry scrane scale model. Main conclusion is that all presented controllers can be used as a con-troller for the gantry crane system but the fuzzy controller is showing the best performance.展开更多
The Liujiaxia Bridge is 536 m span steel truss stiffening Girder Bridge, tower with double-column steel concrete slructure, which is the world's largest diameter, the largest steel plate thickness of concrete pylon. ...The Liujiaxia Bridge is 536 m span steel truss stiffening Girder Bridge, tower with double-column steel concrete slructure, which is the world's largest diameter, the largest steel plate thickness of concrete pylon. Sarasota manufactured using standard pipe segment, group fight scene segment piecewise hoisting tower segment perfusion within the micro-expansion concrete construction technology, tower maximum height of 61.5 meters. This paper describes a piecewise Sarasota steel installation, piecewise perfusion within the micro-expansion concrete tower new construction method - attached to a self-climbing tower bridge ganlry crane mounted pylon construction technology of large steel components. Of the "entity attached to the pylon installation of equipment by section climb" design, composition and construction applications are described in detail.展开更多
基金Project(51175442)supported by the National Natural Science Foundation of ChinaProject(QD2012A09)supported by Teachers’College Research Project,ChinaProject(14ZA0263)supported by Research Project of Sichuan Provincial Department of Education,China
文摘In practical application, it is very important to master the influence of structure parameters on the mid-span deflection quantificationally. For large-span and heavy-duty gantry cranes, the influence of the rigid leg and the soft leg on mid-span deflection has not been considered in the past. In the paper, the mathematical model is established for universal large-span and heavy-duty gantry cranes. The analytical solution for the mid-span deflection of gantry-frame structure girder is derived and obtained based on the variation principle by considering the coupling effect of the bending moments of girder and legs, the axial force and the secondary bending moments. The relation between the load and the deflection on the mid-span of the gantry-frame structure girder is known. Then, the experimental model is designed according to dimensional analysis method. And experiments were performed on the WEW-600 B type testing machine. Hackling experimental data, the regular of the load and deflection on the girder mid-span is obtained, namely, the deformation of the gantry-frame structure resists the external load to do work. The validity of the nonlinear analytical solution of the girder deflection is verified. Experimental results show that the analytical solution of the gantry-frame structure deflection has much higher calculation accuracy than previous calculation method. This work provides a theoretical basis for the design and inspection of gantry-frame structures.
文摘A model for supercapacitor voltage equalization strategy is analyzed, and on this basis a supercapacitor voltage equalization method for Rubber Tyred Gantry Crane (RTG) energy saving system is proposed, namely active voltage equalization method based on Buck-Boost converter. The equalizing speed of the proposed method is fast. Firstly, the working principle and process of the voltage equalization circuit is analyzed in detail. In addition, design of active voltage equalization circuit parameters and control strategy are given. Finally, simulation analysis of the series connection of supercapacitors module is performed. Results show that this method for equalizing voltage can avoid over-voltage of each cell and possess practicable and high value for supercapacitor RTG energy saving system.
文摘For a gantry crane system, this paper presents a comparison between four control algorithms. These algo-rithms are being compared on simplicity, stability and robustness. Goal for the controller is to move the load on a gantry crane to a new position with minimal overshoot of the load and maximal speed of the load. An-other goal is to provide an insight in the behaviour of the possible controllers. In this article a parallel P-controller, cascade P-controller, fuzzy controller and an internal model controller are used. To be able to validate and design the controllers a model is derived from the gantry crane. The controllers and the model are being implemented in Matlab Simulink. Finally the controllers are validated and tuned in Labview on a laboratory gantry scrane scale model. Main conclusion is that all presented controllers can be used as a con-troller for the gantry crane system but the fuzzy controller is showing the best performance.
文摘The Liujiaxia Bridge is 536 m span steel truss stiffening Girder Bridge, tower with double-column steel concrete slructure, which is the world's largest diameter, the largest steel plate thickness of concrete pylon. Sarasota manufactured using standard pipe segment, group fight scene segment piecewise hoisting tower segment perfusion within the micro-expansion concrete construction technology, tower maximum height of 61.5 meters. This paper describes a piecewise Sarasota steel installation, piecewise perfusion within the micro-expansion concrete tower new construction method - attached to a self-climbing tower bridge ganlry crane mounted pylon construction technology of large steel components. Of the "entity attached to the pylon installation of equipment by section climb" design, composition and construction applications are described in detail.