期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Uplift Resistance Calculation and Sensitive Analysis of Jack-up Wind Installation Vessels
1
作者 刘志杰 刘晓宇 +1 位作者 孙德平 林成新 《Journal of Donghua University(English Edition)》 EI CAS 2016年第2期210-214,共5页
The uplift resistance calculation is an important basis for the construction decisions of the jack-up wind installation vessel and the design of the jacking system,and determines the operation risk and reliability in ... The uplift resistance calculation is an important basis for the construction decisions of the jack-up wind installation vessel and the design of the jacking system,and determines the operation risk and reliability in the installation process of the wind turbine. The influence factors of the pile shoe's penetration depth and uplift resistance are analyzed,and the calculation model and flow of the uplift resistance are given. Based on a construction example,the influence rules are analyzed for the change of the pile shoe's structural parameters on the penetration depth and uplift resistance.The analysis results show that the penetration depth is more sensitive to the width of the pile shoe,and the height has greater influence on the uplift resistance than the length and width of the spud. With the increase of the height,the uplift resistance may increase rapidly.Although the decreases of the length,width and height of the pile shoe may reduce the uplift resistance,the penetration depth may increase in the meantime. This will increase the pulling pile time and reduce the construction efficiency. So the parameters of the pile shoe should be optimized according to the adaptable geology condition so as to obtain the optimal uplift resistance and working efficiency. 展开更多
关键词 jack-up wind installation vessel uplift resistance penetration depth pile shoe’s structural parameters
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部