Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertaint...Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertainty of each index value under the market environment,fuzzy numbers are used to describe qualitative indicators and interval numbers are used to describe quantitative ones.Taking into account decision-maker’s subjective risk attitudes,a multi-criteria decision-making(MCDM)method based on improved prospect theory is proposed.First,the[−1,1]RGPBIT operator is proposed to normalize the original data,to obtain the best andworst schemes of PGCPs.Furthermore,the correlation coefficients between interval/fuzzy numbers and the best/worst schemes are defined and introduced to the prospect theory to improve its value function and loss function,and the positive and negative prospect value matrices of the project are obtained.Then,the optimization model with the maximum comprehensive prospect value is constructed,the optimal attribute weight is determined,and the PGCPs are ranked accordingly.Taking four PGCPs of the IEEERTS-79 node system as examples,an illustration of the feasibility and effectiveness of the proposed method is provided.展开更多
Power grid construction projects are distinguished by their wide variety,high investment,long payback period,and close relation to national development and human welfare.To improve the investment accuracy in such proj...Power grid construction projects are distinguished by their wide variety,high investment,long payback period,and close relation to national development and human welfare.To improve the investment accuracy in such projects and effectively prevent investment risks,this paper proposes an investment optimization decision-making method for multiple power grid construction projects under a certain investment scale.Firstly,an in-depth analysis of the characteristics and development requirements of China’s power grid projects was performed.Thereafter,the time sequence and holographic method was adopted to conduct multi-dimensional,multi-perspective risk assessment of different parts of power grid projects,and a holographic risk assessment index system was developed.Moreover,an investment decision model considering the comprehensive risk based on combination weighting was developed according to the output and input of power grid construction projects.A new combination weighting optimization method that takes into account the investment willingness of enterprises was designed to improve the current weighting evaluation methods.Finally,the validity and applicability of the proposed evaluation method were verified by case examples.展开更多
Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Thir...Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Third Qinshan Nuclear Power Company(TQNPC)persisted in independent innovation management during the project construction,commissioning and self-dependent operation,efficiently realizing the three controls of the project,i.e.quality control,schedule control and investment control,and persisted in technical improvement on the basis of digestion and absorption of CANDU-6 technology to improve the unit safety and reliability.The project construction practice has helped China's nuclear power project management to becomeprogrammed,computerized,standardized and internationalized management from the existing basis.After completion of the project,with unit safe and steady operation as the prerequisite,TQNPC performed several technical modifications and innovations to continuously improve the unit performance.In the area of staff development,TQNPC paid much attention to cultivation of corporate culture,strengthed staff training and built up a good circulating mechanism with staff training and project construction promoting each other.Further to "Zero Breakthrough" and a new step forward of locolization successfully realized in Qinshan Nuclear Power Plant and Nuclear Power Qinshan Joint Venture Company,the improvement and developemnt of nuclear power project management level in Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant provided reference for promotion of nuclear power development in China and standardized management of introducing large imported project.展开更多
Based on the collection of relevant literature and cases,the research and application status of on-line monitoring technology for electromagnetic environment of power transmission and transformation projects at home a...Based on the collection of relevant literature and cases,the research and application status of on-line monitoring technology for electromagnetic environment of power transmission and transformation projects at home and abroad were introduced.Moreover,the problems existing in the on-line monitoring of electromagnetic environment were expounded,and the development prospect was forecasted.展开更多
The 500 kV Electric Power TransmissionProject of Yangcheng Power Plant willtransmit electric power from the energy baseto the load center and optimize thedispositions of energy res0urce. It willaccelerate the developm...The 500 kV Electric Power TransmissionProject of Yangcheng Power Plant willtransmit electric power from the energy baseto the load center and optimize thedispositions of energy res0urce. It willaccelerate the development of coal resourcein Shanxi Province, relax the deficienttransport capacity, make up for the electricpower shortage of Jiangsu Province, promotethe economy development of the twoprovinces and accomplish the optimizationof energy resource disposition.The whole project consists of thetransmission lines, the Yellow RiverCrossing. and the Dongming and SanbaoSwitching stations. The general situation isdescribed briefly.展开更多
The construction of intercontinental power grid interconnection projects is key to realizing the vision of Global Energy Interconnection,which is to solve global energy problems in a clean and sustainable manner.These...The construction of intercontinental power grid interconnection projects is key to realizing the vision of Global Energy Interconnection,which is to solve global energy problems in a clean and sustainable manner.These projects may be influenced by a few factors that are neither technological nor economic,such as political,social,and international factors.This paper thus presents a multi-level model for recognizing which factor from a compiled list of 14 would impact a particular intercontinental interconnection project and for assessing the degree of the factor’s influence.In the first part of the model,the Analytic Hierarchy Process(AHP)method is used to recognize the project’s most significant impact factors.Using the recognition results,the second part of the model can assess the degree of the factor’s influence on the project based on ratings provided by experts.A comprehensive evaluation can thus be provided.As a case study,the proposed Saudi Arabia-Ethiopia power grid interconnection project connecting Asia and Africa was analyzed.Derived from a combination of multiple opinions from experts,evaluations from the model will be of direct benefit to decision-makers,investors,project implementers,and engineers,providing them with a deeper insight into the project.展开更多
Based on the experience of environmental acceptance tests for power transmission projects, the problems found in acceptance tests and the system shortcomings of acceptance test itself are analyzed. Recommendations are...Based on the experience of environmental acceptance tests for power transmission projects, the problems found in acceptance tests and the system shortcomings of acceptance test itself are analyzed. Recommendations are provided to improve the future work.展开更多
In view of the current development of power engineering management,traditional management methods can no longer be applied to the management of current power engineering work.Therefore,it is necessary to innovate and ...In view of the current development of power engineering management,traditional management methods can no longer be applied to the management of current power engineering work.Therefore,it is necessary to innovate and optimize existing project management modes,transform traditional management concepts and models,focus on addressing the problems in project management and improve management.This paper mainly analyzes the project management mode and power engineering management.展开更多
The construction of wind power project is conducive to saving energy,reducing emissions and regulating energy structure. But it inevitably causes some impacts on the environment in the construction process. Because th...The construction of wind power project is conducive to saving energy,reducing emissions and regulating energy structure. But it inevitably causes some impacts on the environment in the construction process. Because that the height of wind power generator generally exceeds 100 m,and visual range in plain region is farther,it is necessary to scientifically and rationally evaluate and analyze landscape visual environment impact of wind power generator in plain region. One wind power farm project of Zhanjiang is located in typical plain region of Guangdong coast. Referring to traditional analytic method of landscape visual impact and comparing with actual situation for the same kind of project in the region,results show that it is " extremely sensitive" area at 0- 2. 5 km from wind power generator, " very sensitive" area at 2. 5- 5. 0 km, " sensitive" area at 5- 10 km, "generally sensitive" area at 10- 20 km,and non-sensitive area outside 20 km.展开更多
Xiangfan Coal-fired Power Plant, a key energy construction project matched with Three Gorges Project, approved by the State Council. formally started to build in the suburb of Xiangfan City, Hubei Province on November...Xiangfan Coal-fired Power Plant, a key energy construction project matched with Three Gorges Project, approved by the State Council. formally started to build in the suburb of Xiangfan City, Hubei Province on November 29, 1996.展开更多
At the end of September, the approach way and linkage roads of Pengze Nuclear Power Project, a project developed by China Power Investment Corporation in Jiangxi Province, were all linked up, laying a solid foundation...At the end of September, the approach way and linkage roads of Pengze Nuclear Power Project, a project developed by China Power Investment Corporation in Jiangxi Province, were all linked up, laying a solid foundation for the construction of the project.展开更多
文摘Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertainty of each index value under the market environment,fuzzy numbers are used to describe qualitative indicators and interval numbers are used to describe quantitative ones.Taking into account decision-maker’s subjective risk attitudes,a multi-criteria decision-making(MCDM)method based on improved prospect theory is proposed.First,the[−1,1]RGPBIT operator is proposed to normalize the original data,to obtain the best andworst schemes of PGCPs.Furthermore,the correlation coefficients between interval/fuzzy numbers and the best/worst schemes are defined and introduced to the prospect theory to improve its value function and loss function,and the positive and negative prospect value matrices of the project are obtained.Then,the optimization model with the maximum comprehensive prospect value is constructed,the optimal attribute weight is determined,and the PGCPs are ranked accordingly.Taking four PGCPs of the IEEERTS-79 node system as examples,an illustration of the feasibility and effectiveness of the proposed method is provided.
基金supported by the State Grid Science and Technology Project (SGTYHT/16-JS-198)
文摘Power grid construction projects are distinguished by their wide variety,high investment,long payback period,and close relation to national development and human welfare.To improve the investment accuracy in such projects and effectively prevent investment risks,this paper proposes an investment optimization decision-making method for multiple power grid construction projects under a certain investment scale.Firstly,an in-depth analysis of the characteristics and development requirements of China’s power grid projects was performed.Thereafter,the time sequence and holographic method was adopted to conduct multi-dimensional,multi-perspective risk assessment of different parts of power grid projects,and a holographic risk assessment index system was developed.Moreover,an investment decision model considering the comprehensive risk based on combination weighting was developed according to the output and input of power grid construction projects.A new combination weighting optimization method that takes into account the investment willingness of enterprises was designed to improve the current weighting evaluation methods.Finally,the validity and applicability of the proposed evaluation method were verified by case examples.
文摘Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant,the first commercial heavy water reactor nuclear power plant in China,was the biggest trade project performed between the governments of China and Canada.As the owner,the Third Qinshan Nuclear Power Company(TQNPC)persisted in independent innovation management during the project construction,commissioning and self-dependent operation,efficiently realizing the three controls of the project,i.e.quality control,schedule control and investment control,and persisted in technical improvement on the basis of digestion and absorption of CANDU-6 technology to improve the unit safety and reliability.The project construction practice has helped China's nuclear power project management to becomeprogrammed,computerized,standardized and internationalized management from the existing basis.After completion of the project,with unit safe and steady operation as the prerequisite,TQNPC performed several technical modifications and innovations to continuously improve the unit performance.In the area of staff development,TQNPC paid much attention to cultivation of corporate culture,strengthed staff training and built up a good circulating mechanism with staff training and project construction promoting each other.Further to "Zero Breakthrough" and a new step forward of locolization successfully realized in Qinshan Nuclear Power Plant and Nuclear Power Qinshan Joint Venture Company,the improvement and developemnt of nuclear power project management level in Qinshan Phase Ⅲ(PHWR)Nuclear Power Plant provided reference for promotion of nuclear power development in China and standardized management of introducing large imported project.
基金Supported by the Open Project of Jiangsu Key Laboratory of Environmental Engineering(ZX2017005)
文摘Based on the collection of relevant literature and cases,the research and application status of on-line monitoring technology for electromagnetic environment of power transmission and transformation projects at home and abroad were introduced.Moreover,the problems existing in the on-line monitoring of electromagnetic environment were expounded,and the development prospect was forecasted.
文摘The 500 kV Electric Power TransmissionProject of Yangcheng Power Plant willtransmit electric power from the energy baseto the load center and optimize thedispositions of energy res0urce. It willaccelerate the development of coal resourcein Shanxi Province, relax the deficienttransport capacity, make up for the electricpower shortage of Jiangsu Province, promotethe economy development of the twoprovinces and accomplish the optimizationof energy resource disposition.The whole project consists of thetransmission lines, the Yellow RiverCrossing. and the Dongming and SanbaoSwitching stations. The general situation isdescribed briefly.
基金supported by the State Grid Science and Technology Project“Research on Method and Evaluation Principle for the Cross-Continent Power Transmission Planning Scheme”(SGTYHT/16-JS-198)。
文摘The construction of intercontinental power grid interconnection projects is key to realizing the vision of Global Energy Interconnection,which is to solve global energy problems in a clean and sustainable manner.These projects may be influenced by a few factors that are neither technological nor economic,such as political,social,and international factors.This paper thus presents a multi-level model for recognizing which factor from a compiled list of 14 would impact a particular intercontinental interconnection project and for assessing the degree of the factor’s influence.In the first part of the model,the Analytic Hierarchy Process(AHP)method is used to recognize the project’s most significant impact factors.Using the recognition results,the second part of the model can assess the degree of the factor’s influence on the project based on ratings provided by experts.A comprehensive evaluation can thus be provided.As a case study,the proposed Saudi Arabia-Ethiopia power grid interconnection project connecting Asia and Africa was analyzed.Derived from a combination of multiple opinions from experts,evaluations from the model will be of direct benefit to decision-makers,investors,project implementers,and engineers,providing them with a deeper insight into the project.
文摘Based on the experience of environmental acceptance tests for power transmission projects, the problems found in acceptance tests and the system shortcomings of acceptance test itself are analyzed. Recommendations are provided to improve the future work.
文摘In view of the current development of power engineering management,traditional management methods can no longer be applied to the management of current power engineering work.Therefore,it is necessary to innovate and optimize existing project management modes,transform traditional management concepts and models,focus on addressing the problems in project management and improve management.This paper mainly analyzes the project management mode and power engineering management.
文摘The construction of wind power project is conducive to saving energy,reducing emissions and regulating energy structure. But it inevitably causes some impacts on the environment in the construction process. Because that the height of wind power generator generally exceeds 100 m,and visual range in plain region is farther,it is necessary to scientifically and rationally evaluate and analyze landscape visual environment impact of wind power generator in plain region. One wind power farm project of Zhanjiang is located in typical plain region of Guangdong coast. Referring to traditional analytic method of landscape visual impact and comparing with actual situation for the same kind of project in the region,results show that it is " extremely sensitive" area at 0- 2. 5 km from wind power generator, " very sensitive" area at 2. 5- 5. 0 km, " sensitive" area at 5- 10 km, "generally sensitive" area at 10- 20 km,and non-sensitive area outside 20 km.
文摘Xiangfan Coal-fired Power Plant, a key energy construction project matched with Three Gorges Project, approved by the State Council. formally started to build in the suburb of Xiangfan City, Hubei Province on November 29, 1996.
文摘At the end of September, the approach way and linkage roads of Pengze Nuclear Power Project, a project developed by China Power Investment Corporation in Jiangxi Province, were all linked up, laying a solid foundation for the construction of the project.