The power system infrastructure, operations and market have gone through radical changes for the last couple of decades. The society has become more dependent to the continuous electric power supply and hence the conc...The power system infrastructure, operations and market have gone through radical changes for the last couple of decades. The society has become more dependent to the continuous electric power supply and hence the concept of electric power reliability has become more significant. At this point, understanding the economic outcomes of power outages is vital and imperative for both utilities and the customers. There are certain methodologies to understand the costs of power interruptions. This paper suggests a novel hybrid method that comprises of customer surveys and direct analytical methods to reach customer specific, objective and reliable results for the industry sector customers. The paper also brings a statistical approach to censor the zero and extreme responses given via the surveys.展开更多
This study investigates and analyzes the electric energy interruptions impact upon the residential sector in Riyadh city, the capital of the Kingdom of Saudi Arabia (KSA) resulting from severe power outages. The study...This study investigates and analyzes the electric energy interruptions impact upon the residential sector in Riyadh city, the capital of the Kingdom of Saudi Arabia (KSA) resulting from severe power outages. The study results show that this sector which constitutes about 54% of the Saudi Electric Company in the Central Operating Area (SEC-COA) will suffer enormous tangible and intangible losses should occur in specific times, seasons and last for longer durations. The results obtained for the costs of these energy interruptions reveal a time-dependent non-linear outage cost variation. In order to reduce these energy interruptions and hence mitigate their adverse effects and consequences, the study proposes proper practical measures and solutions without compromising the consumers’ needs and convenience.展开更多
Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity...Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching.展开更多
When subjected to high voltages between opened contacts, vacuum interrupters may emit X-rays. In order to ensure that these are of an acceptable level, vacuum interrupters should comply with the limits for X-ray emiss...When subjected to high voltages between opened contacts, vacuum interrupters may emit X-rays. In order to ensure that these are of an acceptable level, vacuum interrupters should comply with the limits for X-ray emission and the test procedures to be carried out to verify this based on relevant standards and specifications. In this paper, a comprehensive experimental study has been performed for 126 kV vacuum interrupters used in a transmission system to understand the X-radiation level and its influence by three main parameters, namely applied power-frequency voltage, contact gap and power=frequency voltage conditioning. The radiation instrument is an FJ347 radiometer and the X-radiation dose was measured at the power-frequency test voltage. These tests demonstrated that the X-radiation emission level for a 126 kV vacuum interrupter did not exceed the following: 5 μSv per hour at a rated voltage of 126 kV and 150 μSv per hour at a power-frequency voltage of 230 kV at 1 m distance. The X-radiation dose increased with the applied power-frequency voltage increasing and decreased with the contact gap increasing. The X- radiation dose for 126 kV vacuum interrupters decreased by 57% after the conditioning procedure with a certain power-frequency voltage. During the conditioning procedure, the average value of the X-radiation dose was 4.49 mSv, which means if a professional conditions 180 interrupters per year, it will be safe at the 6.4 m distance.展开更多
A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating c...A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating company(Genco)was defined as the profit from the energy auction market minus maintenance cost and risk loss.The compensation fee of interruptible load was a part of the maintenance cost when the permitted maintenance capacity in the system was insufficient.Hourly energy auction was incorporated in the computation of both revenues from energy market and risk loss of maintenance strategy as a nested game.A new heuristic search algorithm for the calculation of the game equilibrium of MSU was presented,which coordinates the solutions of non-equilibrium,unique equilibrium and multiple equilibria.Numerical results for a two-Genco system and a realistic system were used to demonstrate the basic ideas and the applicability of the proposed method,as well as its computational efficiency.展开更多
Revolving parts with complex surface structures are widely used in machinery and mechanical equipment. The ECM process provides its adequacy to cut hard materials with different shapes, and its applications are widely...Revolving parts with complex surface structures are widely used in machinery and mechanical equipment. The ECM process provides its adequacy to cut hard materials with different shapes, and its applications are widely increased, due to its outstanding advantages. In this paper, a new method for machining a convex strips structure on a cylinder by using site directed power interruption(SDPI) in the ECM process is presented. A variable correction value of the power-off time was defined and optimized to obtain the ideal interval for better machining accuracy and stability.The electric field distribution and the simulated convex profiles show that the stray current density can be reduced effectively by using the proposed method. The correction value has an important influence on the machining accuracy. A suitable correction value in the range of 0.6–1.2 s can effectively improve the machining accuracy of the convex strips structure. Experiments were also conducted to verify the proposed method. Results have confirmed that the stray corrosion on the convex strips surface is significantly reduced and the machining accuracy of convex strips structure is remarkably improved by using the proposed method with a suitable correction value in the ECM process. Finally, a convex strip with a height of 2 mm on a thin-wall revolving part was also produced successfully using a correction value of 0.9.展开更多
该文研究建立了二级备用(即非旋转备用,或称运行备用)容量辅助服务市场中的可中断负荷(以下简称 IL招标数学模型。电力市场运营管理机构可以采用这个模型对 IL 投标方案进行实时性选择。这个模型基于最优潮流(OPF)算法。该文也对 IL 市...该文研究建立了二级备用(即非旋转备用,或称运行备用)容量辅助服务市场中的可中断负荷(以下简称 IL招标数学模型。电力市场运营管理机构可以采用这个模型对 IL 投标方案进行实时性选择。这个模型基于最优潮流(OPF)算法。该文也对 IL 市场结构进行了研究并提出了建议。模型包括了对 IL 招标方案设计要考虑的主要因素,例如,提前通知,负荷点的位置,负荷的功率因素,等等通过实施可中断负荷管理(简称 ILM),ISO 可以在电网高峰负荷时段拥有充足的运行备用容量。展开更多
文摘The power system infrastructure, operations and market have gone through radical changes for the last couple of decades. The society has become more dependent to the continuous electric power supply and hence the concept of electric power reliability has become more significant. At this point, understanding the economic outcomes of power outages is vital and imperative for both utilities and the customers. There are certain methodologies to understand the costs of power interruptions. This paper suggests a novel hybrid method that comprises of customer surveys and direct analytical methods to reach customer specific, objective and reliable results for the industry sector customers. The paper also brings a statistical approach to censor the zero and extreme responses given via the surveys.
文摘This study investigates and analyzes the electric energy interruptions impact upon the residential sector in Riyadh city, the capital of the Kingdom of Saudi Arabia (KSA) resulting from severe power outages. The study results show that this sector which constitutes about 54% of the Saudi Electric Company in the Central Operating Area (SEC-COA) will suffer enormous tangible and intangible losses should occur in specific times, seasons and last for longer durations. The results obtained for the costs of these energy interruptions reveal a time-dependent non-linear outage cost variation. In order to reduce these energy interruptions and hence mitigate their adverse effects and consequences, the study proposes proper practical measures and solutions without compromising the consumers’ needs and convenience.
基金supported by the National Key Basic Research Development Program of China (Grant No. 2002CCA00700)
文摘Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching.
基金supported by National Key Basic Research Program of China(973 Program)(No.2015CB251002)
文摘When subjected to high voltages between opened contacts, vacuum interrupters may emit X-rays. In order to ensure that these are of an acceptable level, vacuum interrupters should comply with the limits for X-ray emission and the test procedures to be carried out to verify this based on relevant standards and specifications. In this paper, a comprehensive experimental study has been performed for 126 kV vacuum interrupters used in a transmission system to understand the X-radiation level and its influence by three main parameters, namely applied power-frequency voltage, contact gap and power=frequency voltage conditioning. The radiation instrument is an FJ347 radiometer and the X-radiation dose was measured at the power-frequency test voltage. These tests demonstrated that the X-radiation emission level for a 126 kV vacuum interrupter did not exceed the following: 5 μSv per hour at a rated voltage of 126 kV and 150 μSv per hour at a power-frequency voltage of 230 kV at 1 m distance. The X-radiation dose increased with the applied power-frequency voltage increasing and decreased with the contact gap increasing. The X- radiation dose for 126 kV vacuum interrupters decreased by 57% after the conditioning procedure with a certain power-frequency voltage. During the conditioning procedure, the average value of the X-radiation dose was 4.49 mSv, which means if a professional conditions 180 interrupters per year, it will be safe at the 6.4 m distance.
基金The National High Technology Research and Development Program of China(863Program)(No.2005AA505101-621)Important Science and Technology Research Project of Shanghai(No.041612012)
文摘A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating company(Genco)was defined as the profit from the energy auction market minus maintenance cost and risk loss.The compensation fee of interruptible load was a part of the maintenance cost when the permitted maintenance capacity in the system was insufficient.Hourly energy auction was incorporated in the computation of both revenues from energy market and risk loss of maintenance strategy as a nested game.A new heuristic search algorithm for the calculation of the game equilibrium of MSU was presented,which coordinates the solutions of non-equilibrium,unique equilibrium and multiple equilibria.Numerical results for a two-Genco system and a realistic system were used to demonstrate the basic ideas and the applicability of the proposed method,as well as its computational efficiency.
基金supports provided by the State Key Program of the National Natural Science Foundation of China(No.51535006)Jiangsu Key Laboratory of Precision and Micro-Manufacturing Technology of China
文摘Revolving parts with complex surface structures are widely used in machinery and mechanical equipment. The ECM process provides its adequacy to cut hard materials with different shapes, and its applications are widely increased, due to its outstanding advantages. In this paper, a new method for machining a convex strips structure on a cylinder by using site directed power interruption(SDPI) in the ECM process is presented. A variable correction value of the power-off time was defined and optimized to obtain the ideal interval for better machining accuracy and stability.The electric field distribution and the simulated convex profiles show that the stray current density can be reduced effectively by using the proposed method. The correction value has an important influence on the machining accuracy. A suitable correction value in the range of 0.6–1.2 s can effectively improve the machining accuracy of the convex strips structure. Experiments were also conducted to verify the proposed method. Results have confirmed that the stray corrosion on the convex strips surface is significantly reduced and the machining accuracy of convex strips structure is remarkably improved by using the proposed method with a suitable correction value in the ECM process. Finally, a convex strip with a height of 2 mm on a thin-wall revolving part was also produced successfully using a correction value of 0.9.
文摘该文研究建立了二级备用(即非旋转备用,或称运行备用)容量辅助服务市场中的可中断负荷(以下简称 IL招标数学模型。电力市场运营管理机构可以采用这个模型对 IL 投标方案进行实时性选择。这个模型基于最优潮流(OPF)算法。该文也对 IL 市场结构进行了研究并提出了建议。模型包括了对 IL 招标方案设计要考虑的主要因素,例如,提前通知,负荷点的位置,负荷的功率因素,等等通过实施可中断负荷管理(简称 ILM),ISO 可以在电网高峰负荷时段拥有充足的运行备用容量。