期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Application of k-means clustering to environmental risk zoning of the chemical industrial area 被引量:4
1
作者 Weifang SHI Weihua ZENG 《Frontiers of Environmental Science & Engineering》 SCIE EI CAS CSCD 2014年第1期117-127,共11页
The homogeneous risk characteristics within a sub-area and the heterogeneous from one sub-area to another are unclear using existing environmental risk zoning methods. This study presents a new zoning method by determ... The homogeneous risk characteristics within a sub-area and the heterogeneous from one sub-area to another are unclear using existing environmental risk zoning methods. This study presents a new zoning method by determining and categorizing the risk characteristics using the k-means clustering data mining technology. The study constructs indices and develops index quantification models for environmental risk zoning by analyzing the mechanism of environmental risk occurrence. We calculate the source risk index, air risk field index, water risk field index, and target vulnerability of the study area with Nanjing Chemical Industrial Park using a 100 m - 100 m mesh grid as the basic zoning unit, and then use k-means clustering to analyze the environmental risk in the area. We obtain the optimal clustering number with the largest average silhouette coefficient by calculating the average silhouette coefficients of clustering at different k-values. The clustering result with the optimal clustering number is then used for the environmental risk zoning, and the zoning result is mapped using the geographic information system. The study area is divided into five sub-areas. The common environmental risk characteristics within the same sub-area, as well as the differences between sub- areas, are presented. The zoning is helpful in risk management and is convenient for decision makers to distribute limited resources to different sub-areas in the design of risk reducing intervention. 展开更多
关键词 environmental risk zoning k-means cluster-ing silhouette coefficient chemical industrial park RISKMANAGEMENT
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部