This article explores the fundamentals of small-radius curved ramp bridges.It covers the selection of box girder spans,support methods,and forms,along with design optimization techniques for this type of bridge struct...This article explores the fundamentals of small-radius curved ramp bridges.It covers the selection of box girder spans,support methods,and forms,along with design optimization techniques for this type of bridge structure.The purpose of this paper is to provide robust support for enhancing the design quality of these bridges and ensuring their efficacy in real-world applications.展开更多
The aerodynamic performance of high-speed trains passing each other was investigated on a simply supported box girder bridge,with a span of 32 m,under crosswinds.The bridge and train models,modeled at a geometric scal...The aerodynamic performance of high-speed trains passing each other was investigated on a simply supported box girder bridge,with a span of 32 m,under crosswinds.The bridge and train models,modeled at a geometric scale ratio of 1:30,were used to test the aerodynamic forces of the train,with the help of a designed moving test rig in the XNJD-3 wind tunnel.The effects of wind speed,train speed,and yaw angle on the aerodynamic coefficients of the train were analyzed.The static and moving model tests were compared to demonstrate how the movement of the train influences its aerodynamic characteristics.The results show that the sheltering effect introduced by trains passing each other can cause a sudden change in force on the leeward train,which is further influenced by the wind and running speeds.Detailed analyses related to the effect of wind and train speeds on the aerodynamic coefficients were conducted.The relationship between the change in aerodynamic coefficients and yaw angle was finally described by a series of proposed fitting formulas.展开更多
Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety c...Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques.展开更多
The dynamic finite element model (FEM) of a prestressed concrete continuous box-girder bridge, called the Tongyang Canal Bridge, is built and updated based on the results of ambient vibration testing (AVT) using a...The dynamic finite element model (FEM) of a prestressed concrete continuous box-girder bridge, called the Tongyang Canal Bridge, is built and updated based on the results of ambient vibration testing (AVT) using a real-coded accelerating genetic algorithm (RAGA). The objective functions are defined based on natural frequency and modal assurance criterion (MAC) metrics to evaluate the updated FEM. Two objective functions are defined to fully account for the relative errors and standard deviations of the natural frequencies and MAC between the AVT results and the updated FEM predictions. The dynamically updated FEM of the bridge can better represent its structural dynamics and serve as a baseline in long-term health monitoring, condition assessment and damage identification over the service life of the bridge .展开更多
Using the temperature gradient which was proposed by continuously measuring flat steel box girder of Runyang Bridge, temperature effects of flat steel box girder were studied for Taizhou Bridge. With three temperature...Using the temperature gradient which was proposed by continuously measuring flat steel box girder of Runyang Bridge, temperature effects of flat steel box girder were studied for Taizhou Bridge. With three temperature gradient models (JTG D60--2004 specification, BS5400 specification and the temperature gradient which was proposed in this paper), the stress of control sections was calculated by finite element program ANSYS. The calculated result indicated that the temperature gradient that was put forward in JTG D60-2004 specification and BS5400 specification for calculating the stress of fiat steel box girder was not suitable to apply to fiat steel box girder. The temperature gradient on flat steel box girder which was proposed in this paper was reasonable.展开更多
The response of a bridge superstructure under blast loading might depend largely on the extent of the local damage experienced due to close-in explosion threats. This paper investigates the local and structural respon...The response of a bridge superstructure under blast loading might depend largely on the extent of the local damage experienced due to close-in explosion threats. This paper investigates the local and structural response of box girder bridge decks strengthened using CFRP (carbon fiber reinforced polymers) under close-in detonations. Due to the lack of experimental research on this topic, the study is conducted using the explicit finite element computer program LS-DY-NA. The numerical study will be verified using the results of strengthened reinforced concrete slabs under field detonations. The blast load was assumed to be detonated above the bridge deck. The key parameters investigated are the charge size, and the strengthening location on the deck. This paper will present the results of this investigation and provides recommendations for predicting the local damage level based on the CFRP strengthening design under blast threat.展开更多
In this article, the current railway box girder bridge erecting machines at home and abroad are briefly introduced and analyzed, the research & design situation of class 900t railway box girder bridge erecting mac...In this article, the current railway box girder bridge erecting machines at home and abroad are briefly introduced and analyzed, the research & design situation of class 900t railway box girder bridge erecting machines is described, and also the principle for determining the overall plan and a series of issues much concerning the design of key components of class 900t railway box girder bridge erecting machines are described.展开更多
Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in th...Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in the fluctuant and complex state and many meteorological factors,such as sunshine radiation,temperature and wind,have important influence on the change of stress of the steel box girders. According to the real-time weather data,the stress data after the process of wavelet denoising from representative measuring points in different weather conditions is picked to establish the stress response brought by meteorological factors with Layered Separation method,thereby basically eliminating the influence of meteorological factors on the stress of main girders,so that accurate and reliable stress data can be got for steel box girders adjustment and cable-tensioned construction control.展开更多
This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding...This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding stress release in tuyere block assembling and welding without increasing the number of turns of the blocks and overhead welding, thus avoiding possible structural deformation due to excessive accumulation of internal welding stress, greatly reducing the repeated deformation and correction work during assembling and welding, and ensuring the weld seam quality and overall dimensions of tuvere blocks of Taizhou Bridze.展开更多
Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technica...Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technically mature besides beautiful appearance. Straight web plates of the steel box girder in longitudinal direction are proposed in order to ensure the integrity of the steel box girder, and to keep the stress of the steel box girder continuous in the middle pylon, as well as to reduce the gradient of the middle pylon columns. The cross section of the box girder has one box with three cells. Solid-web diaphragm plate with good integrity and high torsional stiffness is adopted. The lifting lugs are utilized in the anchors of suspender cable. In this paper, selection of the cross section of the steel box girder, the general structure design, local structure design and main structure calculation results of Taizhou Yangtze River Bridge are introduced emphatically.展开更多
Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box ...Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box girder was carried out. The test result shows that in the condition without grouting into the ducts,the cracking load is evidently lower than that with full grouting,and stirrup stress and principal tension stress at the surface of concrete will increase obviously. Meanwhile,the finite element analysis has been done to the test beams. The research is consistent with the analysis of finite element. The research tells that strengthening the detection and management for the vertical prestress grouting quality have an important meaning to prevent cracking of the prestressed concrete box girder bridge and provide one theoretical and testing basis for analyzing the cracking reason of such bridges.展开更多
Temperature field and its variation with time are necessary for analyzing the thermo-mechanical performance of mass concrete structures at their early ages. This paper carries out a temperature field simulation analys...Temperature field and its variation with time are necessary for analyzing the thermo-mechanical performance of mass concrete structures at their early ages. This paper carries out a temperature field simulation analysis for an original segment of a real box girder bridge with the finite element software ANSYS. Two representative exothermic rate models are used to describe the heat- releasing process caused by the cement hydration in concrete. The exothermic rate model that conforms to reality more closely is recognized by comparing the simulation results with the data gathered from the optical fiber temperature sensors pre-embedded in the original segment. The air temperature and wind velocity that constitute thermal boundary conditions are determined in the light of the local meteorological department and correlative research achievements of recent years. Moreover, the consideration for the steel formwork acting as a barrier to heat loss is also proved to be beneficial to improve the simulation effect.展开更多
At present,the precast construction technology has been widely used,especially in the process of bridge construction,where the precast box girder construction and erection technology has attracted more attention compa...At present,the precast construction technology has been widely used,especially in the process of bridge construction,where the precast box girder construction and erection technology has attracted more attention compared to other available methods.In order to effectively improve the application effect of this technology,and the overall quality of the bridge,this paper discusses the advantage and disadvantage of implementing the precast box girder construction and erection technology in the bridge construction.展开更多
The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the ...The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the Runyang Cable-stayed Bridge,the daily variations as well as seasonal ones of measured temperature differences in the box girder cross-section area were summarized.The probability distribution models of temperature differences were further established and the extreme temperature differences were estimated with a return period of 100 years.Finally,the temperature difference models in cross-section area were proposed for bridge thermal design.The results show that horizontal temperature differences in top plate and vertical temperature differences between top plate and bottom plate are considerable.All the positive and negative temperature differences can be described by the weighted sum of two Weibull distributions.The maximum positive and negative horizontal temperature differences in top plate are 10.30 ℃ and -13.80 ℃,respectively.And the maximum positive and negative vertical temperature differences between top plate and bottom plate are 17.30 ℃ and-3.70 ℃,respectively.For bridge thermal design,there are two vertical temperature difference models between top plate and bottom plate,and six horizontal temperature difference models in top plate.展开更多
The main span of Sutong Bridge is a double-pylon,double-plane cable-stayed bridge with steel box girder,which has the world's longest central span of 1 088 m within cable-stayed bridges.To overcome problems caused...The main span of Sutong Bridge is a double-pylon,double-plane cable-stayed bridge with steel box girder,which has the world's longest central span of 1 088 m within cable-stayed bridges.To overcome problems caused by severe meteorological conditions,perplexing hydrological conditions,deep buried bedrock and higher navigation level,many new technics and methods were created.Keys including structural system,steel box girder,stayed cable,tower,pier,tower foundation,collision avoidance system,wind-resistance,seismic-resistance,structural nonlinear response and structural static stability were presented individually in this paper.展开更多
Based on heat transfer theory,a two-dimensional complex exponential function was used to compute heat of concrete hydration.A concrete box girder consisting of a single box with two cells used on Harbin Songpu Bridge ...Based on heat transfer theory,a two-dimensional complex exponential function was used to compute heat of concrete hydration.A concrete box girder consisting of a single box with two cells used on Harbin Songpu Bridge was measured on site.The two coefficients in the complex exponential function were determined to best fit the field measured data.ABAQUS program was used to simulate the heat transfer and determine the temperature distribution in the concrete box girders during concrete setting.The calculated temperature distribution in the box girders were compared with the field measured data and good agreement was observed.The temperature distribution and gradient in the entire box section,webs and bottom slab were analyzed using the measured and calculated results during the course of concrete hydration.展开更多
The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper...The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper, a finite element method (FEM) model is set up to study the effects of concrete differential aging time on the construction phases of the Fenghua River Bridge by calculating the vertical displacement of the folding segment of the middle span and the longitudinal bending moment of Pier 12#. In the model, the girders are classified into 150 changing sections based on the desgn scheme, and their construction is to be carried in 16 phases respectively to build 12 blocks connected by a side folding segment and a middle folding segment, covered with a second dead load and in completion for 20 years. It is found that the internal forces and deformations of the concrete structures at the aging time of 60 d are quite different from those of 0 d aging time while the behaviors of the structures of 120 d aging time is nearly the same as those of 60 d aging time― the differences are so small that can be neglected, suggesting that the creep develops obviously about one month after the cement is hardened and the development fades later on.展开更多
This paper focuses on the seismic response of the curved and post-tensioned concrete box girder bridges. More specifically, it investigates how the curvature influences the response of a bridge subjected to earthquake...This paper focuses on the seismic response of the curved and post-tensioned concrete box girder bridges. More specifically, it investigates how the curvature influences the response of a bridge subjected to earthquake. Parametric analysis of different radius of curvature is performed and the internal forces, torsion moment, axial and shear along the bridge are calculated. Two types of connections are investigated, the monolithic connection and deck connection with bents and abutments with rubber bearing. The response spectrum seismic analysis was performed. The models were designed, according to the provisions of EC8-part 2, EC2 and the Greek regulations E39/99. Diagrams relating the curvature with the torsion moment have been obtained from the results of parametric analysis. These diagrams could be used by engineers for preliminary design of such kind of bridges.展开更多
This paper deeply analyses the influence of different local tectonic on stress performance of spatial curved steel box Girder Bridge, using the finite element analysis software to establish space finite element model ...This paper deeply analyses the influence of different local tectonic on stress performance of spatial curved steel box Girder Bridge, using the finite element analysis software to establish space finite element model of this bridge, calculation and analysis were made on the bridge of the strength, stiffness. It has certain reference value for guiding engineering design, have a good foundation for the mechanical properties and stability of linear and nonlinear further study of curved steel box girder.展开更多
文摘This article explores the fundamentals of small-radius curved ramp bridges.It covers the selection of box girder spans,support methods,and forms,along with design optimization techniques for this type of bridge structure.The purpose of this paper is to provide robust support for enhancing the design quality of these bridges and ensuring their efficacy in real-world applications.
基金This work was financially supported by the National Natural Science Foundation of China (U1434205, 51708645).
文摘The aerodynamic performance of high-speed trains passing each other was investigated on a simply supported box girder bridge,with a span of 32 m,under crosswinds.The bridge and train models,modeled at a geometric scale ratio of 1:30,were used to test the aerodynamic forces of the train,with the help of a designed moving test rig in the XNJD-3 wind tunnel.The effects of wind speed,train speed,and yaw angle on the aerodynamic coefficients of the train were analyzed.The static and moving model tests were compared to demonstrate how the movement of the train influences its aerodynamic characteristics.The results show that the sheltering effect introduced by trains passing each other can cause a sudden change in force on the leeward train,which is further influenced by the wind and running speeds.Detailed analyses related to the effect of wind and train speeds on the aerodynamic coefficients were conducted.The relationship between the change in aerodynamic coefficients and yaw angle was finally described by a series of proposed fitting formulas.
基金National Science and Technology Support Program of China ( No. 2009BAG15B02)
文摘Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques.
基金National Natural Science Foundation of China Under Grant No.50575101Transportation Science Research Item of Jiangsu Province Under Grant No.06Y20
文摘The dynamic finite element model (FEM) of a prestressed concrete continuous box-girder bridge, called the Tongyang Canal Bridge, is built and updated based on the results of ambient vibration testing (AVT) using a real-coded accelerating genetic algorithm (RAGA). The objective functions are defined based on natural frequency and modal assurance criterion (MAC) metrics to evaluate the updated FEM. Two objective functions are defined to fully account for the relative errors and standard deviations of the natural frequencies and MAC between the AVT results and the updated FEM predictions. The dynamically updated FEM of the bridge can better represent its structural dynamics and serve as a baseline in long-term health monitoring, condition assessment and damage identification over the service life of the bridge .
文摘Using the temperature gradient which was proposed by continuously measuring flat steel box girder of Runyang Bridge, temperature effects of flat steel box girder were studied for Taizhou Bridge. With three temperature gradient models (JTG D60--2004 specification, BS5400 specification and the temperature gradient which was proposed in this paper), the stress of control sections was calculated by finite element program ANSYS. The calculated result indicated that the temperature gradient that was put forward in JTG D60-2004 specification and BS5400 specification for calculating the stress of fiat steel box girder was not suitable to apply to fiat steel box girder. The temperature gradient on flat steel box girder which was proposed in this paper was reasonable.
文摘The response of a bridge superstructure under blast loading might depend largely on the extent of the local damage experienced due to close-in explosion threats. This paper investigates the local and structural response of box girder bridge decks strengthened using CFRP (carbon fiber reinforced polymers) under close-in detonations. Due to the lack of experimental research on this topic, the study is conducted using the explicit finite element computer program LS-DY-NA. The numerical study will be verified using the results of strengthened reinforced concrete slabs under field detonations. The blast load was assumed to be detonated above the bridge deck. The key parameters investigated are the charge size, and the strengthening location on the deck. This paper will present the results of this investigation and provides recommendations for predicting the local damage level based on the CFRP strengthening design under blast threat.
文摘In this article, the current railway box girder bridge erecting machines at home and abroad are briefly introduced and analyzed, the research & design situation of class 900t railway box girder bridge erecting machines is described, and also the principle for determining the overall plan and a series of issues much concerning the design of key components of class 900t railway box girder bridge erecting machines are described.
基金National "the 11th Five-Year" Science-Technological Support Program(No.2006BAG04B01)"973"Program(No.2002CB412707)
文摘Sutong Bridge is a cable-stayed bridge with a main span of 1 088 m. 370 high-precision stress monitoring measured data show that in the process of hoisting the steel box girders,the stress of the main girders is in the fluctuant and complex state and many meteorological factors,such as sunshine radiation,temperature and wind,have important influence on the change of stress of the steel box girders. According to the real-time weather data,the stress data after the process of wavelet denoising from representative measuring points in different weather conditions is picked to establish the stress response brought by meteorological factors with Layered Separation method,thereby basically eliminating the influence of meteorological factors on the stress of main girders,so that accurate and reliable stress data can be got for steel box girders adjustment and cable-tensioned construction control.
文摘This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding stress release in tuyere block assembling and welding without increasing the number of turns of the blocks and overhead welding, thus avoiding possible structural deformation due to excessive accumulation of internal welding stress, greatly reducing the repeated deformation and correction work during assembling and welding, and ensuring the weld seam quality and overall dimensions of tuvere blocks of Taizhou Bridze.
基金National Science and Technology Support Program of China ( No. 2009BAG15B01) Key Programs for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-170)
文摘Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technically mature besides beautiful appearance. Straight web plates of the steel box girder in longitudinal direction are proposed in order to ensure the integrity of the steel box girder, and to keep the stress of the steel box girder continuous in the middle pylon, as well as to reduce the gradient of the middle pylon columns. The cross section of the box girder has one box with three cells. Solid-web diaphragm plate with good integrity and high torsional stiffness is adopted. The lifting lugs are utilized in the anchors of suspender cable. In this paper, selection of the cross section of the steel box girder, the general structure design, local structure design and main structure calculation results of Taizhou Yangtze River Bridge are introduced emphatically.
文摘Based on experimental study result of two simply supported beams,which were prestressed by vertical tendons,the research on the weakening effect of vertical prestress ducts on web sections of prestressed concrete box girder was carried out. The test result shows that in the condition without grouting into the ducts,the cracking load is evidently lower than that with full grouting,and stirrup stress and principal tension stress at the surface of concrete will increase obviously. Meanwhile,the finite element analysis has been done to the test beams. The research is consistent with the analysis of finite element. The research tells that strengthening the detection and management for the vertical prestress grouting quality have an important meaning to prevent cracking of the prestressed concrete box girder bridge and provide one theoretical and testing basis for analyzing the cracking reason of such bridges.
基金The Soft Science Foundation of Ministry of Construction of China (No.06-k3-14)
文摘Temperature field and its variation with time are necessary for analyzing the thermo-mechanical performance of mass concrete structures at their early ages. This paper carries out a temperature field simulation analysis for an original segment of a real box girder bridge with the finite element software ANSYS. Two representative exothermic rate models are used to describe the heat- releasing process caused by the cement hydration in concrete. The exothermic rate model that conforms to reality more closely is recognized by comparing the simulation results with the data gathered from the optical fiber temperature sensors pre-embedded in the original segment. The air temperature and wind velocity that constitute thermal boundary conditions are determined in the light of the local meteorological department and correlative research achievements of recent years. Moreover, the consideration for the steel formwork acting as a barrier to heat loss is also proved to be beneficial to improve the simulation effect.
文摘At present,the precast construction technology has been widely used,especially in the process of bridge construction,where the precast box girder construction and erection technology has attracted more attention compared to other available methods.In order to effectively improve the application effect of this technology,and the overall quality of the bridge,this paper discusses the advantage and disadvantage of implementing the precast box girder construction and erection technology in the bridge construction.
基金Project(51178100)supported by the National Natural Science Foundation of ChinaProject(1105007001)supported by the Foundation of the Priority Academic Development Program of Higher Education Institute of Jiangsu Province,ChinaProject(3205001205)supported by the Teaching and Research Foundation for Excellent Young Teachers of Southeast University,China
文摘The extreme temperature differences in fiat steel box girder of a cable-stayed bridge were studied.Firstly,by using the long-term measurement data collected by the structural health monitoring system installed on the Runyang Cable-stayed Bridge,the daily variations as well as seasonal ones of measured temperature differences in the box girder cross-section area were summarized.The probability distribution models of temperature differences were further established and the extreme temperature differences were estimated with a return period of 100 years.Finally,the temperature difference models in cross-section area were proposed for bridge thermal design.The results show that horizontal temperature differences in top plate and vertical temperature differences between top plate and bottom plate are considerable.All the positive and negative temperature differences can be described by the weighted sum of two Weibull distributions.The maximum positive and negative horizontal temperature differences in top plate are 10.30 ℃ and -13.80 ℃,respectively.And the maximum positive and negative vertical temperature differences between top plate and bottom plate are 17.30 ℃ and-3.70 ℃,respectively.For bridge thermal design,there are two vertical temperature difference models between top plate and bottom plate,and six horizontal temperature difference models in top plate.
基金National Science and Technology Support Program of China(No.2006BAG04B01)
文摘The main span of Sutong Bridge is a double-pylon,double-plane cable-stayed bridge with steel box girder,which has the world's longest central span of 1 088 m within cable-stayed bridges.To overcome problems caused by severe meteorological conditions,perplexing hydrological conditions,deep buried bedrock and higher navigation level,many new technics and methods were created.Keys including structural system,steel box girder,stayed cable,tower,pier,tower foundation,collision avoidance system,wind-resistance,seismic-resistance,structural nonlinear response and structural static stability were presented individually in this paper.
基金Sponsored by Northeast Forestry University (GRAM09) and Traffic Department of Heilongjiang Province
文摘Based on heat transfer theory,a two-dimensional complex exponential function was used to compute heat of concrete hydration.A concrete box girder consisting of a single box with two cells used on Harbin Songpu Bridge was measured on site.The two coefficients in the complex exponential function were determined to best fit the field measured data.ABAQUS program was used to simulate the heat transfer and determine the temperature distribution in the concrete box girders during concrete setting.The calculated temperature distribution in the box girders were compared with the field measured data and good agreement was observed.The temperature distribution and gradient in the entire box section,webs and bottom slab were analyzed using the measured and calculated results during the course of concrete hydration.
文摘The Fenghua River Bridge is a major structure on the highway between Hengzhang and Guojiachi, which is to be built with a four-span prestress concrete (PC) box girder and symmetrical cantilever castings. In this paper, a finite element method (FEM) model is set up to study the effects of concrete differential aging time on the construction phases of the Fenghua River Bridge by calculating the vertical displacement of the folding segment of the middle span and the longitudinal bending moment of Pier 12#. In the model, the girders are classified into 150 changing sections based on the desgn scheme, and their construction is to be carried in 16 phases respectively to build 12 blocks connected by a side folding segment and a middle folding segment, covered with a second dead load and in completion for 20 years. It is found that the internal forces and deformations of the concrete structures at the aging time of 60 d are quite different from those of 0 d aging time while the behaviors of the structures of 120 d aging time is nearly the same as those of 60 d aging time― the differences are so small that can be neglected, suggesting that the creep develops obviously about one month after the cement is hardened and the development fades later on.
文摘This paper focuses on the seismic response of the curved and post-tensioned concrete box girder bridges. More specifically, it investigates how the curvature influences the response of a bridge subjected to earthquake. Parametric analysis of different radius of curvature is performed and the internal forces, torsion moment, axial and shear along the bridge are calculated. Two types of connections are investigated, the monolithic connection and deck connection with bents and abutments with rubber bearing. The response spectrum seismic analysis was performed. The models were designed, according to the provisions of EC8-part 2, EC2 and the Greek regulations E39/99. Diagrams relating the curvature with the torsion moment have been obtained from the results of parametric analysis. These diagrams could be used by engineers for preliminary design of such kind of bridges.
文摘This paper deeply analyses the influence of different local tectonic on stress performance of spatial curved steel box Girder Bridge, using the finite element analysis software to establish space finite element model of this bridge, calculation and analysis were made on the bridge of the strength, stiffness. It has certain reference value for guiding engineering design, have a good foundation for the mechanical properties and stability of linear and nonlinear further study of curved steel box girder.