A novel seismic design method, namely split-pier seismic design, is proposed. A vertical gap and connect elements are set in split-piers. The lateral stiffness of piers is reduced by cracking of the connect elements u...A novel seismic design method, namely split-pier seismic design, is proposed. A vertical gap and connect elements are set in split-piers. The lateral stiffness of piers is reduced by cracking of the connect elements under severe earthquake, and the seismic response of bridges is reduced by avoiding the site predominant periods. A model of tied-arch rigid frame bridge with split-piers was designed. Seismic performance was investigated by pseudo-static experimentation on the scale model, The failure process of split-piers, the hysteresis characteristic and the effect of split-piers on the superstructure are presented. Results show that the split-pier has better seismic performance than common ductile piers do.展开更多
Mechanical behavior of concrete slab of large-span through tied-arch composite bridge was investigated by finite element analysis (FEA). Improved methods to decrease concrete stresses were discussed based on compariso...Mechanical behavior of concrete slab of large-span through tied-arch composite bridge was investigated by finite element analysis (FEA). Improved methods to decrease concrete stresses were discussed based on comparisons of different deck schemes, construction sequences and measures, and ratios of reinforcement. The results show that the mechanical behavior of concrete slab gets worse with the increase of composite regions between steel beams and concrete slab. The deck scheme with the minimum composite region is recommended on condition that both strength and stiffness of the bridge meet design demands under service loads. Adopting in-situ-place construction method, concrete is suggested to be cast after removing the full-supported frameworks under the bridge. Thus, the axial tensile force of concrete slab caused by the first stage dead load is eliminated. Preloading the bridge before concrete casting and removing the load after the concrete reaching its design strength, the stresses of concrete slab caused by the second stage dead load and live load are further reduced or even eliminated. At last, with a high ratio of reinforcement more than 3%, the concrete stresses decrease obviously.展开更多
A proven beam-track contact model was used to analyze the track-structure interaction of CWR (continuously welded track) on bridge. Considering the impact of adjacent bridges, the tower-cable-track-beam-pier-pile fini...A proven beam-track contact model was used to analyze the track-structure interaction of CWR (continuously welded track) on bridge. Considering the impact of adjacent bridges, the tower-cable-track-beam-pier-pile finite element model of the cable-stayed bridge was established. Taking a bridge group including 40-32m simply-supported beam and (32+80+112)m single-tower cable-stayed bridge and 17-32m simply-supported beam on the Kunming-Shanghai high-speed railway as an example, the characteristics of CWR longitudinal force on the cable-stayed bridge were studied. It is shown that adjacent bridges must be considered in the calculation of the track expansion force and bending force on cable-stayed bridge. When the span amount of adjacent bridges is too numerous, it can be simplified as six spans; the fixed bearing of adjacent simply-supported beams should be placed on the side near the cable-stayed bridge; the track expansion device should be set at the bridge tower to reduce the track force near the bridge abutment.展开更多
The track geometry is a critical factor that affects the running safety and riding comfort of trains moving on a high-speed railway bridge.This study addresses the mapping relationship between the track deformation an...The track geometry is a critical factor that affects the running safety and riding comfort of trains moving on a high-speed railway bridge.This study addresses the mapping relationship between the track deformation and lateral deformations of bridges.Equilibrium equations and natural boundary conditions of the track-bridge system are established based on the energy variational principle,and an analytical solution is derived for the track deformation accounting for lateral bridge deformations.A five-span simply-supported bridge with continuous welded rail has been selected as the case study.The mapping rail deformations are compared to the finite element results,and both results agree well with each other,validating the analytical method proposed in this paper.The influence factors on the mapping rail deformation are further evaluated.Results show that the mapping rail deformation is consistent with the girder displacement at the area that is away from the girder ends when the flexural stiffness ratio between the track and the bridge girder is low.The interlayer stiffness has a significant effect on the mapping rail deformation when the track flexural stiffness is of a high value.展开更多
Condition assessment of bridges has become increasingly important. In order to accurately simulate the real bridge, finite element (FE) model updating method is often applied. This paper presents the calibration of ...Condition assessment of bridges has become increasingly important. In order to accurately simulate the real bridge, finite element (FE) model updating method is often applied. This paper presents the calibration of the FE model of a reinforced concrete tied-arch bridge using Douglas-Reid method in combination with Rosenbrock optimization algorithm. Based on original drawings and topographic survey, a FE model of the investigated bridge is created. Eight global modes of vibration of the bridge are identified by ambient vibration tests and the frequency domain decomposition technique. Then, eight structural parameters are selected for FE model updating procedure through sensitivity analysis. Finally, the optimal structural parameters are identified using Rosenbrock optimization algorithm. Results show that although the identified parameters lead to a perfect agreement between approximate and measured natural frequencies, they may not be the optimal variables which minimize the differences between numerical and experimental modal data. However, a satisfied agreement between them is still presented. Hence, FE model updating based on Douglas-Reid method and Rosenbrock optimization algorithm could be used as an alternative to other complex updating procedures.展开更多
基金The Natural Science Foundation of Jiangsu Province(NoBK2002061)
文摘A novel seismic design method, namely split-pier seismic design, is proposed. A vertical gap and connect elements are set in split-piers. The lateral stiffness of piers is reduced by cracking of the connect elements under severe earthquake, and the seismic response of bridges is reduced by avoiding the site predominant periods. A model of tied-arch rigid frame bridge with split-piers was designed. Seismic performance was investigated by pseudo-static experimentation on the scale model, The failure process of split-piers, the hysteresis characteristic and the effect of split-piers on the superstructure are presented. Results show that the split-pier has better seismic performance than common ductile piers do.
基金Project(2005k002-c-2) supported by the Science and Technology Development Program of Railways Department, China
文摘Mechanical behavior of concrete slab of large-span through tied-arch composite bridge was investigated by finite element analysis (FEA). Improved methods to decrease concrete stresses were discussed based on comparisons of different deck schemes, construction sequences and measures, and ratios of reinforcement. The results show that the mechanical behavior of concrete slab gets worse with the increase of composite regions between steel beams and concrete slab. The deck scheme with the minimum composite region is recommended on condition that both strength and stiffness of the bridge meet design demands under service loads. Adopting in-situ-place construction method, concrete is suggested to be cast after removing the full-supported frameworks under the bridge. Thus, the axial tensile force of concrete slab caused by the first stage dead load is eliminated. Preloading the bridge before concrete casting and removing the load after the concrete reaching its design strength, the stresses of concrete slab caused by the second stage dead load and live load are further reduced or even eliminated. At last, with a high ratio of reinforcement more than 3%, the concrete stresses decrease obviously.
基金Project(51178469) supported by the National Natural Science Foundation of China
文摘A proven beam-track contact model was used to analyze the track-structure interaction of CWR (continuously welded track) on bridge. Considering the impact of adjacent bridges, the tower-cable-track-beam-pier-pile finite element model of the cable-stayed bridge was established. Taking a bridge group including 40-32m simply-supported beam and (32+80+112)m single-tower cable-stayed bridge and 17-32m simply-supported beam on the Kunming-Shanghai high-speed railway as an example, the characteristics of CWR longitudinal force on the cable-stayed bridge were studied. It is shown that adjacent bridges must be considered in the calculation of the track expansion force and bending force on cable-stayed bridge. When the span amount of adjacent bridges is too numerous, it can be simplified as six spans; the fixed bearing of adjacent simply-supported beams should be placed on the side near the cable-stayed bridge; the track expansion device should be set at the bridge tower to reduce the track force near the bridge abutment.
基金Project(2021RC2011)supported by the Science and Technology Innovation Program of Hunan Province,ChinaProjects(U1934207,52178180)supported by the National Natural Science Foundation of ChinaProject(2021M703648)supported by the China Postdoctoral Science Foundation。
文摘The track geometry is a critical factor that affects the running safety and riding comfort of trains moving on a high-speed railway bridge.This study addresses the mapping relationship between the track deformation and lateral deformations of bridges.Equilibrium equations and natural boundary conditions of the track-bridge system are established based on the energy variational principle,and an analytical solution is derived for the track deformation accounting for lateral bridge deformations.A five-span simply-supported bridge with continuous welded rail has been selected as the case study.The mapping rail deformations are compared to the finite element results,and both results agree well with each other,validating the analytical method proposed in this paper.The influence factors on the mapping rail deformation are further evaluated.Results show that the mapping rail deformation is consistent with the girder displacement at the area that is away from the girder ends when the flexural stiffness ratio between the track and the bridge girder is low.The interlayer stiffness has a significant effect on the mapping rail deformation when the track flexural stiffness is of a high value.
文摘Condition assessment of bridges has become increasingly important. In order to accurately simulate the real bridge, finite element (FE) model updating method is often applied. This paper presents the calibration of the FE model of a reinforced concrete tied-arch bridge using Douglas-Reid method in combination with Rosenbrock optimization algorithm. Based on original drawings and topographic survey, a FE model of the investigated bridge is created. Eight global modes of vibration of the bridge are identified by ambient vibration tests and the frequency domain decomposition technique. Then, eight structural parameters are selected for FE model updating procedure through sensitivity analysis. Finally, the optimal structural parameters are identified using Rosenbrock optimization algorithm. Results show that although the identified parameters lead to a perfect agreement between approximate and measured natural frequencies, they may not be the optimal variables which minimize the differences between numerical and experimental modal data. However, a satisfied agreement between them is still presented. Hence, FE model updating based on Douglas-Reid method and Rosenbrock optimization algorithm could be used as an alternative to other complex updating procedures.