A simulation model was proposed to investigate the relationship between train delays and passenger delays and to predict the dynamic passenger distribution in a large-scale rail transit network. It was assumed that th...A simulation model was proposed to investigate the relationship between train delays and passenger delays and to predict the dynamic passenger distribution in a large-scale rail transit network. It was assumed that the time varying original-destination demand and passenger path choice probability were given. Passengers were assumed not to change their destinations and travel paths after delay occurs. CapaciW constraints of train and queue rules of alighting and boarding were taken into account. By using the time-driven simulation, the states of passengers, trains and other facilities in the network were updated every time step. The proposed methodology was also tested in a real network, for demonstration. The results reveal that short train delay does not necessarily result in passenger delays, while, on the contrary, some passengers may get benefits from the short delay. However, large initial train delay may result in not only knock-on train and passenger delays along the same line, but also the passenger delays across the entire rail transit network.展开更多
Coupling analysis of passenger and train flows is an important approach in evaluating and optimizing the operation efficiency of large-scale urban rail transit(URT)systems.This study proposes a passenger–train intera...Coupling analysis of passenger and train flows is an important approach in evaluating and optimizing the operation efficiency of large-scale urban rail transit(URT)systems.This study proposes a passenger–train interaction simulation approach to determine the coupling relationship between passenger and train flows.On the bases of time-varying origin–destination demand,train timetable,and network topology,the proposed approach can restore passenger behaviors in URT systems.Upstream priority,queuing process with first-in-first-serve principle,and capacity constraints are considered in the proposed simulation mechanism.This approach can also obtain each passenger’s complete travel chain,which can be used to analyze(including but not limited to)various indicators discussed in this research to effectively support train schedule optimization and capacity evaluation for urban rail managers.Lastly,the proposed model and its potential application are demonstrated via numerical experiments using real-world data from the Beijing URT system(i.e.,rail network with the world’s highest passenger ridership).展开更多
In order to study the interaction among the traction power supply,the train group and the operation dispatching of urban rail transit,a coupling simulation system of power supply system,trains and dispatching manageme...In order to study the interaction among the traction power supply,the train group and the operation dispatching of urban rail transit,a coupling simulation system of power supply system,trains and dispatching management is constructed.In order to solve the problems of different timescales and difficult cooperation operation for related subsystems,a multi-bus distributed real-time network architecture based on hierarchical management of communication data is established,and simulation management software is developed to facilitate the free expansion of the simulation system.Meanwhile,the track line,train operation and other large timescale subsystems are realized by the pure digital simulation.And the time-sensitive subsystems,such as train traction system,braking system,auxiliary power supply system and network system etc.,are built by the semi-physical simulation.In this article,the system structure and the main implementation principle of each simulation subsystem are given in detail,and the system is tested and verified at the end.The results show that the simulation system can meet the expected requirements.展开更多
基金Project(51008229)supported by the National Natural Science Foundation of ChinaProject supported by Key Laboratory of Road and Traffic Engineering of Tongji University,China
文摘A simulation model was proposed to investigate the relationship between train delays and passenger delays and to predict the dynamic passenger distribution in a large-scale rail transit network. It was assumed that the time varying original-destination demand and passenger path choice probability were given. Passengers were assumed not to change their destinations and travel paths after delay occurs. CapaciW constraints of train and queue rules of alighting and boarding were taken into account. By using the time-driven simulation, the states of passengers, trains and other facilities in the network were updated every time step. The proposed methodology was also tested in a real network, for demonstration. The results reveal that short train delay does not necessarily result in passenger delays, while, on the contrary, some passengers may get benefits from the short delay. However, large initial train delay may result in not only knock-on train and passenger delays along the same line, but also the passenger delays across the entire rail transit network.
基金This research was supported by the National Key R&D Program of China(Grant No.2020YFB1600702)the National Natural Science Foundation of China(Grant Nos.71621001,72071015,71701013,and 71890972/71890970)+2 种基金the Beijing Municipal Natural Science Foundation(Grant No.L191024)the 111 Project(Grant No.B20071)the State Key Laboratory of Rail Traffic Control and Safety(Grant No.RCS2021ZZ001).
文摘Coupling analysis of passenger and train flows is an important approach in evaluating and optimizing the operation efficiency of large-scale urban rail transit(URT)systems.This study proposes a passenger–train interaction simulation approach to determine the coupling relationship between passenger and train flows.On the bases of time-varying origin–destination demand,train timetable,and network topology,the proposed approach can restore passenger behaviors in URT systems.Upstream priority,queuing process with first-in-first-serve principle,and capacity constraints are considered in the proposed simulation mechanism.This approach can also obtain each passenger’s complete travel chain,which can be used to analyze(including but not limited to)various indicators discussed in this research to effectively support train schedule optimization and capacity evaluation for urban rail managers.Lastly,the proposed model and its potential application are demonstrated via numerical experiments using real-world data from the Beijing URT system(i.e.,rail network with the world’s highest passenger ridership).
文摘In order to study the interaction among the traction power supply,the train group and the operation dispatching of urban rail transit,a coupling simulation system of power supply system,trains and dispatching management is constructed.In order to solve the problems of different timescales and difficult cooperation operation for related subsystems,a multi-bus distributed real-time network architecture based on hierarchical management of communication data is established,and simulation management software is developed to facilitate the free expansion of the simulation system.Meanwhile,the track line,train operation and other large timescale subsystems are realized by the pure digital simulation.And the time-sensitive subsystems,such as train traction system,braking system,auxiliary power supply system and network system etc.,are built by the semi-physical simulation.In this article,the system structure and the main implementation principle of each simulation subsystem are given in detail,and the system is tested and verified at the end.The results show that the simulation system can meet the expected requirements.