期刊文献+
共找到8篇文章
< 1 >
每页显示 20 50 100
Ultimate negative bending-moment capacity of outer-plated steel-concrete continuous composite beams 被引量:1
1
作者 陈丽华 李爱群 +1 位作者 娄宇 李培彬 《Journal of Southeast University(English Edition)》 EI CAS 2009年第1期89-93,共5页
Static load tests and bearing capacity analyses are carried out for two outer-plated steel-concrete continuous composite beams. The load-deflection curve and the load-strain curve of specimens are obtained and analyze... Static load tests and bearing capacity analyses are carried out for two outer-plated steel-concrete continuous composite beams. The load-deflection curve and the load-strain curve of specimens are obtained and analyzed. The test results indicate that effective cooperation can be achieved by the shearresistant connection between the reinforcement in the negative moment area and the outer-plated steel beam, and the overall working performance of the composite beams is favorable. At the load-bearing limiting state, the plastic strain on the maximum negative and positive moment section becomes fully developed so as to form relatively ideal plastic hinges. With the increase in the reinforcement ratio, the moment-carrying capacity of the composite beams improves significantly, but the ductility of the beams and the rotation ability of the plastic hinges decrease. The formulae for calculating the limit bending capacity in the negative moment area of outer-plated steel-concrete composite beams are proposed based on the test data. The calculated results agree well with the test results. 展开更多
关键词 outer-plated steel-concrete composite beam continuous beam negative moment bending-moment bearing capacity
下载PDF
Field validation of UHPC layer in negative moment region of steel-concrete composite continuous girder bridge
2
作者 Minghong QIU Xudong SHAO +4 位作者 Weiye HU Yanping ZHU Husam H.HUSSEIN Yaobei HE Qiongwei LIU 《Frontiers of Structural and Civil Engineering》 SCIE EI CSCD 2022年第6期744-761,共18页
Improving the cracking resistance of steel-normal concrete(NC)composite beams in the negative moment region is one of the main tasks in designing continuous composite beam(CCB)bridges due to the low tensile strength o... Improving the cracking resistance of steel-normal concrete(NC)composite beams in the negative moment region is one of the main tasks in designing continuous composite beam(CCB)bridges due to the low tensile strength of the NC deck at pier supports.This study proposed an innovative structural configuration for the negative bending moment region in a steel-concrete CCB bridge with the aid of ultrahigh performance concrete(UHPC)layer.In order to investigate the feasibility and effectiveness of this new UHPC jointed structure in the negative bending moment region,field load testing was conducted on a newly built full-scale bridge.The newly designed structural configuration was described in detail regarding the structural characteristics(cracking resistance,economy,durability,and constructability).In the field investigation,strains on the surface of the concrete bridge deck,rebar,and steel beam in the negative bending moment region,as well as mid-span deflection,were measured under different load cases.Also,a finite element model for the four-span superstructure of the full-scale bridge was established and validated by the field test results.The simulated results in terms of strains and mid-span deflection showed moderate consistency with the test results.This field test and the finite element model results demonstrated that the new configuration with the UHPC layer provided an effective alternative for the negative bending moment region of the composite beam. 展开更多
关键词 field test steel-concrete composite beam continuous girder bridge negative bending moment region ultrahigh performance concrete
原文传递
钢 混凝土连续组合梁纵向开裂问题的验算 被引量:6
3
作者 蒋东红 刘之洋 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 1999年第6期608-611,共4页
试验表明,以单排栓钉连接的钢混凝土组合梁在竖向荷载的作用下混凝土翼板易发生沿梁长方向的纵向开裂·根据8 根连续组合梁的试验研究结果及有关资料,分析了组合梁混凝土板纵向开裂的原因及影响因素,分别按照以混凝土板中栓... 试验表明,以单排栓钉连接的钢混凝土组合梁在竖向荷载的作用下混凝土翼板易发生沿梁长方向的纵向开裂·根据8 根连续组合梁的试验研究结果及有关资料,分析了组合梁混凝土板纵向开裂的原因及影响因素,分别按照以混凝土板中栓钉剪力和混凝土横向应力的关系建立的计算模型以及混凝土板的受剪计算模型两种方法对连续组合梁的开裂荷载计算公式进行了推导,并分别和实测结果进行比较,进而给出了连续组合梁混凝土板纵向开裂的验算公式· 展开更多
关键词 连续组合梁 纵向开裂荷载 验算公式 钢-混凝土
下载PDF
古城大桥的初步设计
4
作者 姚翔 《东北公路》 北大核心 1999年第3期36-39,18,共5页
古城大桥是一座下承式单承载面钢管混凝土系杆拱与变截面连续梁组合体系桥梁。本文介绍了古城大桥初步设计从方案选择到具体结构设计的一些思路和想法。
关键词 桥梁 系杆拱 组合体系 钢管混凝土
下载PDF
单拱肋连续梁-拱组合桥的结构设计 被引量:3
5
作者 叶琳 《城市轨道交通研究》 北大核心 2021年第8期51-54,58,共5页
以某市轨道交通6号线花溪湖大桥的施工图设计为基础,介绍单拱肋连续梁-拱组合结构的桥型方案及主桥结构设计,并对该结构体系进行了详细的静力和动力分析。分析结果表明,单拱肋连续梁-拱组合结构具有良好的静力和动力性能,其结构强度、... 以某市轨道交通6号线花溪湖大桥的施工图设计为基础,介绍单拱肋连续梁-拱组合结构的桥型方案及主桥结构设计,并对该结构体系进行了详细的静力和动力分析。分析结果表明,单拱肋连续梁-拱组合结构具有良好的静力和动力性能,其结构强度、应力、刚度、整体稳定性及动力效应均满足规范要求,是轨道交通桥梁设计中一种合适的桥型。 展开更多
关键词 城市轨道交通 单拱肋连续梁-拱组合结构 静动力性能 数值计算
下载PDF
基于等效单层理论的钢-混组合梁动力分析方法
6
作者 孙琪凯 张楠 +3 位作者 张冰 刘潇 程泽农 陶晓燕 《振动与冲击》 EI CSCD 北大核心 2021年第17期92-98,共7页
基于Reddy高阶梁理论和黏结滑移理论,提出了钢-混组合梁动力分析的等效单层理论有限元计算模型。模型中考虑了混凝土板与钢梁之间的剪切滑移和各子梁剪切变形的影响。钢-混组合梁的轴向位移沿梁高假定为三阶函数,从而可以更加准确的模... 基于Reddy高阶梁理论和黏结滑移理论,提出了钢-混组合梁动力分析的等效单层理论有限元计算模型。模型中考虑了混凝土板与钢梁之间的剪切滑移和各子梁剪切变形的影响。钢-混组合梁的轴向位移沿梁高假定为三阶函数,从而可以更加准确的模拟剪切应力的抛物线变化。该计算模型的优点是预先在构建的组合梁高阶位移场中考虑了子梁间的剪力连续性和上下表面无剪应力条件,使得到的等效单层位移场函数中不包含横向位移的一阶导数,从而在有限元计算时只需要使用C^(0)连续的插值函数。最后,通过与已发表的论文中数值结果对比,说明了该计算模型的合理性、适用范围和计算精度。结果表明:等效单层理论可适用于分析钢-混组合梁的自振特性,具有较高的计算精度;且高跨比越大,该计算模型的优势越明显。 展开更多
关键词 钢-混组合梁 等效单层理论 C^(0)连续插值函数 相对滑移 动力分析
下载PDF
连续钢混结合梁内力优化分析
7
作者 杜亚光 胡志礼 +1 位作者 马中文 卫超 《城市道桥与防洪》 2022年第2期108-110,M0011,M0012,共5页
以某连续钢混结合梁为工程背景,分析了梁体顶升方式对桥梁成桥内力状态调整的效果,提出并分析了联合临时支撑的顶升方式对结合梁混凝土顶板压应力储备的精细化调整方法。这种方式可在整体内力调整的基础上兼顾局部优化,利用已有施工支... 以某连续钢混结合梁为工程背景,分析了梁体顶升方式对桥梁成桥内力状态调整的效果,提出并分析了联合临时支撑的顶升方式对结合梁混凝土顶板压应力储备的精细化调整方法。这种方式可在整体内力调整的基础上兼顾局部优化,利用已有施工支架作为梁体临时支撑,效果和经济性十分理想,可以供同类设计工作者参考。 展开更多
关键词 连续钢混结合梁 应力储备 顶升 临时支撑
下载PDF
连续钢混梁架设几种特殊工况的解决措施研究 被引量:1
8
作者 孙洪亮 《铁道建筑技术》 2020年第12期116-119,145,共5页
以贵州都安线T31标高速公路连续钢混工字组合梁施工为例,针对整孔连续钢混梁桥梁施工中钢混梁通过隧道和桥梁、出隧道口首跨及进隧道口末跨架梁、连续梁中间跨架梁和桥面板安装四个工况,提出了特殊设计DJ型单臂架桥机和组合式轮胎运梁... 以贵州都安线T31标高速公路连续钢混工字组合梁施工为例,针对整孔连续钢混梁桥梁施工中钢混梁通过隧道和桥梁、出隧道口首跨及进隧道口末跨架梁、连续梁中间跨架梁和桥面板安装四个工况,提出了特殊设计DJ型单臂架桥机和组合式轮胎运梁车的施工措施,解决了双臂架桥机无法通过隧道、钢混梁跨过桥台支腿无法站位支撑的难题,并对连续钢混工字组合梁整孔架设与预制混凝土桥面板的铺装施工工艺进行分析探讨,旨在对整孔连续钢混桥梁施工提供一种新思路。 展开更多
关键词 钢混组合梁 单臂架桥机 特殊工况 连续桥梁
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部