期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Steam Flooding after Steam Soak in Heavy Oil Reservoirs through Extended-reach Horizontal Wells 被引量:1
1
作者 Ning Zhengfu Liu Huiqing Zhang Hongling 《Petroleum Science》 SCIE CAS CSCD 2007年第2期71-74,共4页
This paper presents a new development scheme of simultaneous injection and production in a single horizontal well drilled for developing small block reservoirs or offshore reservoirs. It is possible to set special pac... This paper presents a new development scheme of simultaneous injection and production in a single horizontal well drilled for developing small block reservoirs or offshore reservoirs. It is possible to set special packers within the long completion horizontal interval to establish an injection zone and a production zone. This method can also be used in steam flooding after steam soak through a horizontal well. Simulation results showed that it was desirable to start steam flooding after six steam soaking cycles and at this time the oil/steam ratio was 0.25 and oil recovery efficiency was 23.48%. Steam flooding performance was affected by separation interval and steam injection rate. Reservoir numerical simulation indicated that maximum oil recovery would be achieved at a separation section of 40-50 m at steam injection rate of 100-180 t/d; and the larger the steam injection rate, the greater the water cut and pressure difference between injection zone and production zone. A steam injection rate of 120 t/d was suitable for steam flooding under practical injection-production conditions. All the results could be useful for the guidance of steam flooding projects. 展开更多
关键词 Heavy oil horizontal well steam soak steam flooding single well injection and production optimized design
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部