This paper briefs the configuration and performance of large size gas turbines and their composed combined cycle power plants designed and produced by four large renown gas turbine manufacturing firms in the world, pr...This paper briefs the configuration and performance of large size gas turbines and their composed combined cycle power plants designed and produced by four large renown gas turbine manufacturing firms in the world, providing reference for the relevant sectors and enterprises in importing advanced gas turbines and technologies.展开更多
为了迎接西气东输和LNG(液化天然气)的输入,我国东部地区正在建设一批大型联合循环电厂。为使建成后的电厂占地最少、单位投资最省、建设速度最快、投产后便于运行检修,对机组的总体布置进行优化至关重要。从布置紧凑和节约用地的角度,...为了迎接西气东输和LNG(液化天然气)的输入,我国东部地区正在建设一批大型联合循环电厂。为使建成后的电厂占地最少、单位投资最省、建设速度最快、投产后便于运行检修,对机组的总体布置进行优化至关重要。从布置紧凑和节约用地的角度,对大型天然气联合循环电厂不同机型(300 M W及以上的以S209E“2+1”为代表的E级机组、以KA13E2-2“2+1”为代表的E级改进型和F级“1+1”单轴联合循环机组)的总体布置与占地进行了分析和比较,推荐在我国东部沿海天然气气价较高且用地相当紧张的地区,建设大型天然气联合循环电厂不宜选用E级及E级改进型机组,应选用F级机组作为基本机型。展开更多
文摘This paper briefs the configuration and performance of large size gas turbines and their composed combined cycle power plants designed and produced by four large renown gas turbine manufacturing firms in the world, providing reference for the relevant sectors and enterprises in importing advanced gas turbines and technologies.
文摘为了迎接西气东输和LNG(液化天然气)的输入,我国东部地区正在建设一批大型联合循环电厂。为使建成后的电厂占地最少、单位投资最省、建设速度最快、投产后便于运行检修,对机组的总体布置进行优化至关重要。从布置紧凑和节约用地的角度,对大型天然气联合循环电厂不同机型(300 M W及以上的以S209E“2+1”为代表的E级机组、以KA13E2-2“2+1”为代表的E级改进型和F级“1+1”单轴联合循环机组)的总体布置与占地进行了分析和比较,推荐在我国东部沿海天然气气价较高且用地相当紧张的地区,建设大型天然气联合循环电厂不宜选用E级及E级改进型机组,应选用F级机组作为基本机型。