As an efficient,environmentally friendly,energy-saving construction method,assembled buildings are now widely used in campus building construction.Modular design thinking is system-based design thinking,and its applic...As an efficient,environmentally friendly,energy-saving construction method,assembled buildings are now widely used in campus building construction.Modular design thinking is system-based design thinking,and its application to the design of an assembled teaching building project will comprehensively improve the rationality of the teaching building and component design.The paper focuses on the application of modular design thinking in assembled teaching building design,aiming to provide references for China’s architectural design units,giving full play to the advantages of modular design thinking in future teaching building design projects,and enhancing the level of design,for the construction of the teaching building and the basis of the technical guarantee.展开更多
A new coastal technique, named as assembly coastal building, was introduced. The main concept of the technique was the assembling components which could be combined and locked together to form a large caisson. The ass...A new coastal technique, named as assembly coastal building, was introduced. The main concept of the technique was the assembling components which could be combined and locked together to form a large caisson. The assembly coastal building technique was used in a sea access road in Zhuanghai 4X1 well, Dagang Oilfield. The design plans and in-situ tests in the sea access road project were introduced in detail. According to the Zhuanghai project, the numerical simulation method of assembly coastal building technique was proposed. 2D numerical simulations were performed in FLAC to analyze the displacement and stability of the technique in the construction process and post-construction period. The settlement calculated is close to the in-situ results, which proves that the proposed numerical method is reasonable. Results show that the assembly coastal building technique has large safety factor under the gravity loading and wave loadings.展开更多
In the SILER (Seismic-Initiated events risk mitigation in LEad-cooled Reactors) Project, it is interesting to apply seismic isolation technology for the reactor assembly of the fixed base reactor building for ADS (...In the SILER (Seismic-Initiated events risk mitigation in LEad-cooled Reactors) Project, it is interesting to apply seismic isolation technology for the reactor assembly of the fixed base reactor building for ADS (Acceleration Driven System) heavy liquid reactor MYRRHA (Multipurpose Hybrid Research Reactor for High-Tech Application) which contains the most critical safety related components, such as reactor vessel, safe shutdown and control rod mechanisms, primary heat exchangers, primary pumps, spoliation target assembly and fuel assemblies, etc. The purpose of this paper is to investigate the possibility of an application of a partial seismic isolation to the safety critical components only, here, the reactor assembly. This paper presents the preliminary analysis results of the isolated reactor assembly and compares these with those of seismic isolated ADS reactor building. The analysis results show the reduction of the seismic acceleration response but the increase of the relative displacement for the reactor assembly. Some safety issues, especially, coolant's incapable covering the reactor core make difficult to apply for the partial seismic isolation of the ADS reactor assembly due to large relative displacement occurring the partial isolation system. Further study on the partial seismic isolation application of the critical safety components are also discussed.展开更多
轻钢装配式结构施工周期短、抗震节能、可回收利用率高,但也存在热惰性差、重复热桥多、隔振性能差等缺陷。以CNKI数据库筛选出的有关轻钢装配式建筑的383篇文献和Web of Science核心合集的731篇文献为数据来源,利用CiteSpace对发文情...轻钢装配式结构施工周期短、抗震节能、可回收利用率高,但也存在热惰性差、重复热桥多、隔振性能差等缺陷。以CNKI数据库筛选出的有关轻钢装配式建筑的383篇文献和Web of Science核心合集的731篇文献为数据来源,利用CiteSpace对发文情况、研究热点及发展趋势进行可视化分析,为以后的相关研究提供参考。综述包括轻钢龙骨、轻钢轻质混凝土、轻钢框架等在内的典型装配式轻钢结构性能优化设计的研究现状。首先,从整体抗震性能、自攻螺钉连接、龙骨截面及腹板开孔、保温材料及构造角度分析了组合墙体力学性能优化设计的特点、效果和改进思路。之后,从增设保温材料、热桥阻断设计、相变储能应用和接缝密封处理4个方面提出优化墙体热工性能的方法和效果。最后,阐述了围护结构隔绝空气声、结构振动噪声及振动舒适度的优化设计方法,总结了多目标并行优化的研究现状和未来发展方向。展开更多
为有效解决建筑工业化和智能化协同发展所面临的问题,中国正积极促进建筑信息模型(Building Information Modeling,BIM)支持下装配式建筑的发展。运用了文献计量分析方法,对2011—2021年中国BIM体系下装配式建筑的研究趋势、作者和机构...为有效解决建筑工业化和智能化协同发展所面临的问题,中国正积极促进建筑信息模型(Building Information Modeling,BIM)支持下装配式建筑的发展。运用了文献计量分析方法,对2011—2021年中国BIM体系下装配式建筑的研究趋势、作者和机构集群及研究热点关键词进行了可视化图谱分析,旨在提高建筑从业者对BIM体系下装配式建筑的综合认知。研究发现:跨地域机构研究承接协同、“装配式建筑-BIM-EPC”一体化及运营维护的全生命周期设计管理是未来的重点研究方向。展开更多
文摘As an efficient,environmentally friendly,energy-saving construction method,assembled buildings are now widely used in campus building construction.Modular design thinking is system-based design thinking,and its application to the design of an assembled teaching building project will comprehensively improve the rationality of the teaching building and component design.The paper focuses on the application of modular design thinking in assembled teaching building design,aiming to provide references for China’s architectural design units,giving full play to the advantages of modular design thinking in future teaching building design projects,and enhancing the level of design,for the construction of the teaching building and the basis of the technical guarantee.
基金Project (50639010) supported by the National Natural Science Foundation of China
文摘A new coastal technique, named as assembly coastal building, was introduced. The main concept of the technique was the assembling components which could be combined and locked together to form a large caisson. The assembly coastal building technique was used in a sea access road in Zhuanghai 4X1 well, Dagang Oilfield. The design plans and in-situ tests in the sea access road project were introduced in detail. According to the Zhuanghai project, the numerical simulation method of assembly coastal building technique was proposed. 2D numerical simulations were performed in FLAC to analyze the displacement and stability of the technique in the construction process and post-construction period. The settlement calculated is close to the in-situ results, which proves that the proposed numerical method is reasonable. Results show that the assembly coastal building technique has large safety factor under the gravity loading and wave loadings.
文摘In the SILER (Seismic-Initiated events risk mitigation in LEad-cooled Reactors) Project, it is interesting to apply seismic isolation technology for the reactor assembly of the fixed base reactor building for ADS (Acceleration Driven System) heavy liquid reactor MYRRHA (Multipurpose Hybrid Research Reactor for High-Tech Application) which contains the most critical safety related components, such as reactor vessel, safe shutdown and control rod mechanisms, primary heat exchangers, primary pumps, spoliation target assembly and fuel assemblies, etc. The purpose of this paper is to investigate the possibility of an application of a partial seismic isolation to the safety critical components only, here, the reactor assembly. This paper presents the preliminary analysis results of the isolated reactor assembly and compares these with those of seismic isolated ADS reactor building. The analysis results show the reduction of the seismic acceleration response but the increase of the relative displacement for the reactor assembly. Some safety issues, especially, coolant's incapable covering the reactor core make difficult to apply for the partial seismic isolation of the ADS reactor assembly due to large relative displacement occurring the partial isolation system. Further study on the partial seismic isolation application of the critical safety components are also discussed.
文摘轻钢装配式结构施工周期短、抗震节能、可回收利用率高,但也存在热惰性差、重复热桥多、隔振性能差等缺陷。以CNKI数据库筛选出的有关轻钢装配式建筑的383篇文献和Web of Science核心合集的731篇文献为数据来源,利用CiteSpace对发文情况、研究热点及发展趋势进行可视化分析,为以后的相关研究提供参考。综述包括轻钢龙骨、轻钢轻质混凝土、轻钢框架等在内的典型装配式轻钢结构性能优化设计的研究现状。首先,从整体抗震性能、自攻螺钉连接、龙骨截面及腹板开孔、保温材料及构造角度分析了组合墙体力学性能优化设计的特点、效果和改进思路。之后,从增设保温材料、热桥阻断设计、相变储能应用和接缝密封处理4个方面提出优化墙体热工性能的方法和效果。最后,阐述了围护结构隔绝空气声、结构振动噪声及振动舒适度的优化设计方法,总结了多目标并行优化的研究现状和未来发展方向。
文摘为有效解决建筑工业化和智能化协同发展所面临的问题,中国正积极促进建筑信息模型(Building Information Modeling,BIM)支持下装配式建筑的发展。运用了文献计量分析方法,对2011—2021年中国BIM体系下装配式建筑的研究趋势、作者和机构集群及研究热点关键词进行了可视化图谱分析,旨在提高建筑从业者对BIM体系下装配式建筑的综合认知。研究发现:跨地域机构研究承接协同、“装配式建筑-BIM-EPC”一体化及运营维护的全生命周期设计管理是未来的重点研究方向。