For tunnels being excavated through multiple knowledge of the aquifers’hydraulic head becomes essential for determining groundwater inflow into the tunnel and analyzing its stability,specifically using multilevel mon...For tunnels being excavated through multiple knowledge of the aquifers’hydraulic head becomes essential for determining groundwater inflow into the tunnel and analyzing its stability,specifically using multilevel monitoring systems.In the multi-aquifer alluvial section of the Glas tunnel(Iran),since the hydraulic head calculations were based on the data obtained from single-piezometer boreholes,the excavation risk was assessed to be at high level and the tunnel seemed to be unstable,thus an incorrect conclusion was derived from the misleading data.To take cost mitigation measures into account,it was necessary to calculate the hydraulic head at tunnel level accurately.By installing nested and clustered wells the mean hydraulic head was measured to be 70 m,significantly different from the 90 m previously determined by boreholes.Considering the updated value,the groundwater inflow and bulkhead load,formerly calculated as 0.65 m^(3)/s and 9.5 bars,were determined to be 0.49 m^(3)/s and 7.5 bars,respectively.展开更多
A model accounting for more than 30 parameters of drilling projects, and a computer program to enumerate groupings of the wells of a pad with consequent calculations of technical-economic characteristics, are develope...A model accounting for more than 30 parameters of drilling projects, and a computer program to enumerate groupings of the wells of a pad with consequent calculations of technical-economic characteristics, are developed and tested. Seven drilling scenarios for a 24-well pad with different starting oil flow rates for the wells are studied. Optimal well groupings in terms of Net Present Value (NPV) for three discount rates and five oil production decline rates have been found. The results show that: NPV-maximizing well pad designs with unequal (varying) numbers of wells in groups (clusters) may require only slight alterations of existing designs (changing the configurations of a couple of well clusters);relative NPV gain is inversely proportional to the absolute value of NPV;observed increases in NPV in groupings with varying numbers of wells reach up to 1% with respect to groupings with equal (constant) numbers of wells in groups for conventional projects, and could reach 2% and more for shale formation development projects, and up to 45% for marginal projects.展开更多
As the current calculation methods for wellbore separation factor have some deficiencies, we propose and analyze a new calculation approach for wellbore separation factor based on the relative position of adjacent wel...As the current calculation methods for wellbore separation factor have some deficiencies, we propose and analyze a new calculation approach for wellbore separation factor based on the relative position of adjacent wellbores, named as relative position method for short. Based on the trajectory error ellipsoid model of single wellbore, the error ellipsoids model of adjacent wellbore was derived considering the correlation of trajectory errors between adjacent wells. Furthermore, the calculation formula of the separation factor based on relative position of adjacent wellbore was derived and solved with the conjugate gradient algorithm. Case study shows that the new approach is more precise and higher in applicability than the ellipsoid scaling method and the minimum distance method, it can evaluate the state of well collision more reasonably. By doing batch calculation with the new method and following the criterion of well collision avoidance, the permissible ranges of key parameters in the well design can be worked out quickly. This method has good application in the design of cluster wells and directional wells.展开更多
文摘For tunnels being excavated through multiple knowledge of the aquifers’hydraulic head becomes essential for determining groundwater inflow into the tunnel and analyzing its stability,specifically using multilevel monitoring systems.In the multi-aquifer alluvial section of the Glas tunnel(Iran),since the hydraulic head calculations were based on the data obtained from single-piezometer boreholes,the excavation risk was assessed to be at high level and the tunnel seemed to be unstable,thus an incorrect conclusion was derived from the misleading data.To take cost mitigation measures into account,it was necessary to calculate the hydraulic head at tunnel level accurately.By installing nested and clustered wells the mean hydraulic head was measured to be 70 m,significantly different from the 90 m previously determined by boreholes.Considering the updated value,the groundwater inflow and bulkhead load,formerly calculated as 0.65 m^(3)/s and 9.5 bars,were determined to be 0.49 m^(3)/s and 7.5 bars,respectively.
文摘A model accounting for more than 30 parameters of drilling projects, and a computer program to enumerate groupings of the wells of a pad with consequent calculations of technical-economic characteristics, are developed and tested. Seven drilling scenarios for a 24-well pad with different starting oil flow rates for the wells are studied. Optimal well groupings in terms of Net Present Value (NPV) for three discount rates and five oil production decline rates have been found. The results show that: NPV-maximizing well pad designs with unequal (varying) numbers of wells in groups (clusters) may require only slight alterations of existing designs (changing the configurations of a couple of well clusters);relative NPV gain is inversely proportional to the absolute value of NPV;observed increases in NPV in groupings with varying numbers of wells reach up to 1% with respect to groupings with equal (constant) numbers of wells in groups for conventional projects, and could reach 2% and more for shale formation development projects, and up to 45% for marginal projects.
基金Supported by the Major Program of the Strategic Pilot Science and Technology Foundation of Chinese Academy of Sciences(XDA14020500)the CNPC Science and Technology Major Project(2019A-3912,2018E-2107).
文摘As the current calculation methods for wellbore separation factor have some deficiencies, we propose and analyze a new calculation approach for wellbore separation factor based on the relative position of adjacent wellbores, named as relative position method for short. Based on the trajectory error ellipsoid model of single wellbore, the error ellipsoids model of adjacent wellbore was derived considering the correlation of trajectory errors between adjacent wells. Furthermore, the calculation formula of the separation factor based on relative position of adjacent wellbore was derived and solved with the conjugate gradient algorithm. Case study shows that the new approach is more precise and higher in applicability than the ellipsoid scaling method and the minimum distance method, it can evaluate the state of well collision more reasonably. By doing batch calculation with the new method and following the criterion of well collision avoidance, the permissible ranges of key parameters in the well design can be worked out quickly. This method has good application in the design of cluster wells and directional wells.