期刊文献+
共找到4,948篇文章
< 1 2 248 >
每页显示 20 50 100
Discussion on Anti-Seepage Technologies in the Construction of Small-Scale Rural Water Conservancy Projects
1
作者 Suxiang Yuan 《Journal of World Architecture》 2022年第2期19-24,共6页
In order to ensure the sustainable growth of rural economy,it is necessary to carry out further research on small-scale water conservancy projects and solve the seepage issue in rural areas.Based on the application si... In order to ensure the sustainable growth of rural economy,it is necessary to carry out further research on small-scale water conservancy projects and solve the seepage issue in rural areas.Based on the application significance of small-scale rural water conservancy projects and the analysis of anti-seepage technologies,along with specific examples,this paper specifically discusses the application of high-pressure jet technology,so as to provide reference for the development of engineering construction. 展开更多
关键词 small-scale water conservancy projects Rural areas Anti-seepage technology High-pressure jet
下载PDF
Joint optimization scheduling for water conservancy projects incomplex river networks 被引量:5
2
作者 Qin Liu Guo-hua Fang +1 位作者 Hong-bin Sun Xue-wen Wu 《Water Science and Engineering》 EI CAS CSCD 2017年第1期43-52,共10页
In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi... In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks. 展开更多
关键词 Complex river network water conservancy project Hydraulic structure Flow capacity simulation Scheduling model Optimal scheduling
下载PDF
Evaluation index system for positive operation of water conservancy projects 被引量:3
3
作者 Qing-yuan ZHU Guo-hua FANG 《Water Science and Engineering》 EI CAS 2009年第4期110-117,共8页
The conditions for the positive operation of water conservancy projects are described in this paper. A scientific and effective evaluation index system was established based on frequency analysis, theoretical analysis... The conditions for the positive operation of water conservancy projects are described in this paper. A scientific and effective evaluation index system was established based on frequency analysis, theoretical analysis, and expert consultation. This evaluation index system can be divided into six first-level indices: the degree to which facilities are intact and functionality standards are reached, the status of operation and management funds, the rationality and degree of advancement of the management team structure, the adaptability and rationality of the water conservancy project management system, the degree of automatization and informationization of the management techniques, and the conduciveness of the exterior environment. The weights for evaluation indices were obtained through the analytic hierarchy process method with consideration of the difference between public welfare and profit-oriented water conservancy projects. This study provides a scientific method for evaluating the positive operation of water conservancy projects. 展开更多
关键词 water conservancy project positive operation evaluation index system analytic hierarchy process WEIGHT
下载PDF
θ-improved limited tolerance relation model of incomplete information system for evaluation of water conservancy project management modernization 被引量:4
4
作者 Yu-qin GAO Guo-hua FANG Ya-qin LIU 《Water Science and Engineering》 EI CAS CSCD 2013年第4期469-477,共9页
The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological ... The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model. 展开更多
关键词 Key words: modernization of water conservancy project management O-improved limitedtolerance relation model upper and lower approximations threshold
下载PDF
Analysis on Regulation Effect of Water Conservancy Project in Upper Reaches of Wujiang River,Guizhou on Runoff
5
作者 Yang Dongfang Suo Hongmin +2 位作者 Zhang Rong Zhu Sixi Wang Lin 《Meteorological and Environmental Research》 CAS 2017年第3期24-29,共6页
Based on monthly runoff data of Hongjiadu,Guizhou from October 2013 to June 2015 and monthly runoff data of Yachi River,Guizhou from April 2014 to May 2015,using REOF and multiple linear regression analysis,regulation... Based on monthly runoff data of Hongjiadu,Guizhou from October 2013 to June 2015 and monthly runoff data of Yachi River,Guizhou from April 2014 to May 2015,using REOF and multiple linear regression analysis,regulation effect of water conservancy project in upper reaches of Wujiang River on monthly runoff of the river was analyzed. Seasonal temporal-spatial change of monthly runoff in Hongjiadu and Yachi River mainly contained two kinds of modalities. The first modality was that of Yachi River,which was main component of seasonal change of monthly runoff,and peak appeared in July. Space load of Yachi River modality was larger than Hongjiadu,and manual control ability of monthly runoff in Hongjiadu was larger than Yachi River. The second modality was that of Hongjiadu,and peak appeared in December. Space load of Hongjiadu modality was larger than Yachi River,and manual control ability of monthly runoff in Yachi River was larger than Hongjiadu. Seasonal changes of time components of two modalities had significant inverse phase. Regulation effect of Hongjiadu modality advanced Yachi River modality,and regulation effect of water conservancy project in Hongjiadu modality was larger than that of Yachi River modality,and seasonal distribution characteristics of regional rainfall was basically eliminated in Hongjiadu modality. Some seasonal distribution characteristics of regional rainfall were maintained in Yachi River modality. Monthly runoff modality of Yachi River had water storage regulation effect on a smaller part of regional monthly rainfall modality. Monthly runoff modality of Hongjiadu mainly had water storage regulation effect on south-north type of component of regional monthly rainfall,while most components of regional monthly rainfall modality did not have significant impact on monthly runoff modality of Hongjiadu. 展开更多
关键词 Hongjiadu Yachi RIVER MONTHLY RUNOFF REOF ANALYSIS water conservancy project
下载PDF
A Study on Cost Control of Agricultural Water Conservancy Projects Based on Activity-based Costing
6
作者 Tiantian TANG 《Asian Agricultural Research》 2017年第7期11-14,共4页
Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through th... Based on the theory of activity-based costing and the idea of value chain,activity optimization and cost control are carried out on the whole construction process of agricultural water conservancy projects. Through the use of literature review,case analysis and statistical analysis and other methods,with agricultural water conservancy projects as the research object,and comparing activity-based costing with the traditional model of cost accounting,the writer carries out the corresponding value chain analysis,and comes to the following conclusion: the statistical calculation and analysis of the entire construction process based on activity-based costing can accurately and effectively control the costs of water conservancy projects. Through the use of activity-based costing,the cost data of agricultural water conservancy projects is more detailed and accurate,and cost management personnel can also find non-value-added activities,optimize the enterprise's value chain and achieve cost control objectives through the analysis of the activity chain and value chain of agricultural water conservancy projects. 展开更多
关键词 Activity-based costing Agricultural water conservancy projects Cost control
下载PDF
River Treatment and Measures in Water Conservancy Projects of Small Farmland
7
作者 Guilan Chen 《Journal of Architectural Research and Development》 2020年第4期22-25,共4页
China is country of massive agriculture.Although it has gradually changed from traditionalagriculture to modern agriculture in recent years, thereare still many problems in the transition. Rivers playan important role... China is country of massive agriculture.Although it has gradually changed from traditionalagriculture to modern agriculture in recent years, thereare still many problems in the transition. Rivers playan important role in water conservancy projects offarmland. Therefore, full attention should be paid toriver management of farmland. This thesis analyzes itand proposes countermeasures for governance. 展开更多
关键词 Small farmland water conservancy project River regulation
下载PDF
Discussion on Anti-seepage Wall and Anti-seepage Technology of Water Conservancy Project
8
作者 Jie Tao Qingpo Wang 《Journal of World Architecture》 2020年第5期14-17,共4页
The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of ... The water infiltration problem of water conservancy projects is one of the more common problems in the construction of water conservancy projects,which seriously affects the overall construction quality and safety of water conservancy projects.This article studies the causes of water infiltration in water conservancy projects and introduces related antiseepage technologies,hoping to be a reference for the implementation of anti-seepage projects.Through research,it is found that the factors that cause water infiltration in water conservancy projects include water conservancy project structural changes,environmental factors and construction factors.Relevant personnel can use concrete anti-seepage wall construction technology and high-pressure jet grouting technology to do the relevant anti-seepage work of water conservancy projects. 展开更多
关键词 water conservancy project Anti-seepage technology Anti-seepage wall
下载PDF
Research on the Present Situation and Improvement Strategy of Water Conservancy Project Construction Quality Management based on the Quality Efficiency Equilibrium Theory
9
作者 Ren Jianfei 《International Journal of Technology Management》 2015年第12期13-16,共4页
关键词 水利工程质量 施工质量管理 质量效率 工程施工企业 水利工程建设 施工技术 质量保证体系 质量责任制
下载PDF
Research on performance evaluation of small water conservancy facilities construction project in Hebei Province
10
作者 Li Mingwei Wang Xiaoyan Wei Jinghong 《International Journal of Technology Management》 2014年第2期105-108,共4页
关键词 农田水利设施建设 建设项目 河北省 绩效评价 绩效评估 性能评估 数据源
下载PDF
Key techniques for evaluation of safety monitoring sensors in water conservancy and hydropower engineering 被引量:1
11
作者 Yan XIANG Lin WANG +2 位作者 Zhan-jun WANG Hui YUAN Yun-jie GUAN 《Water Science and Engineering》 EI CAS 2012年第4期440-449,共10页
For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitorin... For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitoring sensors are employed in a majority of engineering projects. These sensors are used to monitor the project during the dam construction and operation periods, and play an important role in reservoir safety operation and producing benefits. With the changing of operating environments and run-time of projects, there are some factors affecting the operation and management of projects, such as a certain amount of damaged sensors and instability of the measured data. Therefore, it is urgent to evaluate existing safety monitoring sensors in water conservancy and hydropower engineering projects. However, there are neither standards nor evaluation guidelines at present. Based on engineering practice, this study examined some key techniques for the evaluation of safety monitoring sensors, including the evaluation process of the safety monitoring system, on-site detection methods of two typical pieces of equipment, the differential resistor sensor and vibrating wire sensor, the on-site detection methods of communication cable faults, and a validity test of the sensor measured data. These key techniques were applied in the Xiaolangdi Water Control Project and Xiaoxi Hydropower Project. The results show that the measured data of a majority of sensors are reliable and reasonable, and can reasonably reflect the structural change behavior in the project operating process, indicating that the availabilities of the safety monitoring sensors of the two projects are high 展开更多
关键词 water conservancy and hydropower engineering safety monitoring sensor Xiaolangdi water Control project Xiaoxi Hydropower project
下载PDF
Analysis of Winter Concrete Construction in Water Conservation Project
12
作者 Sun Wenzhong 《Journal of Architectural Research and Development》 2018年第3期6-10,共5页
The construction of water conservancy projects should commence during optimal atmospheric conditions and non-flood period to ensure completion before the flood season begin in summer.In most areas of Northern China,th... The construction of water conservancy projects should commence during optimal atmospheric conditions and non-flood period to ensure completion before the flood season begin in summer.In most areas of Northern China,the temperature during winter remain at lower level,in which environmental factors play the most important role in the construction of water conservancy projects.In particular,low temperature directly affects the strength of concrete and delays its solidification,this highly affects the quality and progress of concrete construction.In order to overcome this barrier,better planning,for reasonable and effective construction techniques and targeted control measures should be adopted to reduce the adverse effects of low temperature to assure a strong and safe architecture. 展开更多
关键词 water conservancy projectS CONCRETE WINTER CONSTRUCTION
下载PDF
智慧水利理论体系与数字孪生流域虚拟模型研究成果述要
13
作者 冶运涛 蒋云钟 +5 位作者 曹引 尚毅梓 顾晶晶 董甲平 黄建雄 关昊哲 《中国水利》 2024年第5期41-51,共11页
智慧水利是水利高质量发展的显著标志之一。围绕智慧水利理论体系不完善、流域映射精准度不高、模型精度不高、决策支撑程度低等问题,建立了由智慧流域基础理论、数字孪生流域基础理论和智能水网理论框架组成的智慧水利理论体系,研究了... 智慧水利是水利高质量发展的显著标志之一。围绕智慧水利理论体系不完善、流域映射精准度不高、模型精度不高、决策支撑程度低等问题,建立了由智慧流域基础理论、数字孪生流域基础理论和智能水网理论框架组成的智慧水利理论体系,研究了由数字孪生感知节点模型、数字孪生降水遥感模型、数字孪生蒸散发遥感模型、数字孪生土壤水遥感模型、数字孪生水体遥感模型、数字孪生地下水遥感模型、数字孪生水质遥感模型组成的数字孪生流域感知模型,构建了由数字孪生流域水文模型、数字孪生水动力水质模型、数字孪生动态调控模型、数字孪生虚拟仿真模型、数字孪生协同决策模型、数字孪生并行组合模型等组成的数字孪生流域虚拟模型。研究成果可为我国智慧水利建设提供理论基础和技术支撑。 展开更多
关键词 智慧水利 智慧流域 数字孪生流域 智能水网 数字孪生水网 数字孪生水利工程 数字孪生灌区
下载PDF
昆仑山北坡区域高质量发展面临的问题、机遇与挑战
14
作者 陈亚宁 朱成刚 +1 位作者 李稚 方功焕 《干旱区地理》 CSCD 北大核心 2024年第5期733-740,共8页
昆仑山北坡区域是新时代维护国家安全的重要战略部署区和“丝绸之路经济带”核心区关键通道,战略地位十分突出。但由于历史和自然的原因,该区域经济发展相对滞后。系统分析显示,昆仑山北坡区域目前存在的水资源利用上线偏低、水利工程... 昆仑山北坡区域是新时代维护国家安全的重要战略部署区和“丝绸之路经济带”核心区关键通道,战略地位十分突出。但由于历史和自然的原因,该区域经济发展相对滞后。系统分析显示,昆仑山北坡区域目前存在的水资源利用上线偏低、水利工程建设严重滞后、城镇化进程缓慢、产业布局相对单一且缺少重要产业布局,以及区域高质量发展动能不足等问题,结合区域自然环境特点和发展机遇,提出加快构建经济带城市群体系,打造多产业协同发展的昆仑山北坡经济带,大幅提升水资源上线和水利工程管控能力,为昆仑山北坡农业提质增效提供水资源保障,系统打造昆仑山北坡农-林-牧复合基地,构建多元化食物供给体系,以能补水,提升资源综合利用效率,通过兵地优势互补、资源共享,加快推进昆仑山北坡经济带建设和高质量发展等建议。研究成果可为加快昆仑山北坡经济带生态安全和高质量发展提供科技支撑。 展开更多
关键词 水资源利用 水利工程建设 农-林-牧复合基地 兵地优势互补 昆仑山北坡
下载PDF
太湖流域水环境治理工程土地节约集约利用评价研究
15
作者 沈菊琴 武钰荣 +2 位作者 李淑琴 孙付华 刘国正 《水利经济》 北大核心 2024年第2期7-13,64,共8页
土地节约集约利用评价及其障碍因子诊断对固守耕地红线、保障国家粮食安全具有重要意义,以太湖流域为例,从建设过程和建设结果两方面构建水环境治理工程土地节约集约利用评价体系,选择信息熵改进TOPSIS模型研究太湖治理工程土地节约集... 土地节约集约利用评价及其障碍因子诊断对固守耕地红线、保障国家粮食安全具有重要意义,以太湖流域为例,从建设过程和建设结果两方面构建水环境治理工程土地节约集约利用评价体系,选择信息熵改进TOPSIS模型研究太湖治理工程土地节约集约利用现状及变化趋势,并通过障碍度模型进行障碍因子诊断。研究结果表明:太湖治理工程土地节约集约综合利用水平整体随着时间的推移呈平稳上升趋势,太湖治理工程土地集约利用水平排序依次为新孟河工程(0.564 4)、新沟河工程(0.480 5)、走马塘工程(0.431 6),均处于适度利用等级(Ⅲ级),存在较大提升空间;影响太湖治理工程土地节约集约利用的障碍因子存在差异,障碍度变化各不相同,但总体呈现障碍因子集中、重要障碍因子具有较为明显共性的特点。 展开更多
关键词 太湖流域 土地节约集约利用 障碍因子 水环境治理工程
下载PDF
数字孪生水利实践案例分析与创新思考
16
作者 耿振云 徐寅生 王帅 《中国水利》 2024年第3期39-43,共5页
数字孪生水利建设是新阶段水利高质量发展的重要实施路径。概述了数字孪生水网、数字孪生流域、数字孪生工程发展建设基本情况,以数字孪生尼尔基和数字孪生嫩江为例,介绍了数字孪生工程和数字孪生流域建设的成果及技术创新。分析了当前... 数字孪生水利建设是新阶段水利高质量发展的重要实施路径。概述了数字孪生水网、数字孪生流域、数字孪生工程发展建设基本情况,以数字孪生尼尔基和数字孪生嫩江为例,介绍了数字孪生工程和数字孪生流域建设的成果及技术创新。分析了当前数字孪生水利建设中存在的问题并提出发展建议,以期为加快构建数字孪生水利体系提供参考。 展开更多
关键词 数字孪生水利 数字孪生工程 数字孪生流域
下载PDF
水土保持碳汇项目开发与交易的机制与途径构建
17
作者 李智广 钟小剑 王海燕 《中国水利》 2024年第4期7-11,共5页
水土保持碳汇具备负碳技术的特性,受到政府和交易主体广泛关注和青睐,未来将在我国碳排放权交易市场中得到广泛应用。从建立碳汇项目开发团队、实施碳汇监测与核算、协调撮合交易和宣传示范等4个方面,总结全国首单水土保持碳汇项目开发... 水土保持碳汇具备负碳技术的特性,受到政府和交易主体广泛关注和青睐,未来将在我国碳排放权交易市场中得到广泛应用。从建立碳汇项目开发团队、实施碳汇监测与核算、协调撮合交易和宣传示范等4个方面,总结全国首单水土保持碳汇项目开发与交易的实践探索,提出水土保持碳汇项目开发与交易的机制与途径,包括加强水土保持碳汇基础研究和技术攻关、完善水土保持碳汇监测和核算体系、开展碳汇项目开发和探索碳汇交易途径与机制、建立水土保持碳汇纳入温室气体自愿减排交易机制、建设碳汇项目开发队伍与机构、提升项目开发信息管理水平等6个方面。 展开更多
关键词 水土保持 碳达峰碳中和 碳汇项目 开发 途径
下载PDF
水利建设投资对经济增长影响效应研究
18
作者 崔晨甲 李淼 《水利发展研究》 2024年第4期24-29,共6页
水利基础设施建设作为扩大内需的重要领域,具有吸纳投资大、产业链条长、形成工程量快、促进就业能力强等特点,承载着稳投资、稳增长的重任。10年来,全国水利建设完成投资达到7.5万亿元,先后实施了172项、150项重大水利工程,为稳定经济... 水利基础设施建设作为扩大内需的重要领域,具有吸纳投资大、产业链条长、形成工程量快、促进就业能力强等特点,承载着稳投资、稳增长的重任。10年来,全国水利建设完成投资达到7.5万亿元,先后实施了172项、150项重大水利工程,为稳定经济大盘、推动江河治理、增进民生福祉提供了重要支撑。在新阶段新形势的要求下,跟踪水利建设投资数据,建立常态化的研究机制,科学研判水利建设投资对经济增长的影响尤为重要,不仅有助于更好发挥水利建设经济成效,而且也为促进经济回稳向上提供水利支撑。 展开更多
关键词 水利建设投资 GDP乘数 重大水利工程
下载PDF
新发展理念下的中国水利投融资模式探索
19
作者 马骏 张彦君 程常高 《水利经济》 北大核心 2024年第2期65-72,共8页
探讨了新发展理念下中国水利投融资模式的现状、挑战与创新;通过分析当前水利投融资模式发展历程,识别现行模式中存在的主要问题,剖析了新发展理念下的融资模式在绿色发展和可持续发展两方面的需求,并分析了现有融资模式在适应新要求方... 探讨了新发展理念下中国水利投融资模式的现状、挑战与创新;通过分析当前水利投融资模式发展历程,识别现行模式中存在的主要问题,剖析了新发展理念下的融资模式在绿色发展和可持续发展两方面的需求,并分析了现有融资模式在适应新要求方面的能力和局限;通过国际案例研究,比较了美国、荷兰和新加坡等国在水利投融资方面的成功经验和教训,探讨了这些经验在中国的适用性和必要的调整。提出了制定多维度融资策略、推出鼓励创新和可持续水利项目的激励机制以及积极开展水利基础设施REITs试点推广等优化现有水利投融资政策和法规框架的建议。 展开更多
关键词 新发展理念 水利项目 投融资模式
下载PDF
水土保持碳汇项目管理信息系统的开发探索
20
作者 吴勇 倪友聪 +1 位作者 邹海威 曹正金 《中国水利》 2024年第4期22-26,共5页
水土保持碳汇项目信息化管理可以为水土保持碳汇项目开发提供科学规范的技术手段。分析了水土保持碳汇项目管理信息系统开发的主要挑战、建设目标及总体框架,以福建省长汀县罗地河小流域综合治理水土保持碳汇开发为研究对象,探索水土保... 水土保持碳汇项目信息化管理可以为水土保持碳汇项目开发提供科学规范的技术手段。分析了水土保持碳汇项目管理信息系统开发的主要挑战、建设目标及总体框架,以福建省长汀县罗地河小流域综合治理水土保持碳汇开发为研究对象,探索水土保持碳汇项目开发的全过程信息化体系建设,总结了系统在罗地河小流域综合治理过程中的应用情况以及存在的不足,并提出相关建议,以期为提升水土保持碳汇项目管理水平提供借鉴参考。 展开更多
关键词 水土保持 碳达峰碳中和 碳汇项目 信息化 罗地河小流域
下载PDF
上一页 1 2 248 下一页 到第
使用帮助 返回顶部