Considering the existence of numerous shallow-buried tunnels traversing high slopes in the loess area in western China and the fact of high seismic intensity there,we investigate the dynamic response rules of a shallo...Considering the existence of numerous shallow-buried tunnels traversing high slopes in the loess area in western China and the fact of high seismic intensity there,we investigate the dynamic response rules of a shallow-buried loess tunnel and its slope under the action of seismic waves with different intensities.Through large-scale shaking table model tests,we successfully analyze the characteristics and process of the destabilization of tunnels and slopes,and propose valuable suggestions regarding the reinforcement parts of a tunnel for reducing seismic damage.The results show that the main seismic damage on a slope include the failure of the sliding surface between the top and foot and the stripping of the soil around the tunnel entrance,while the damage on a tunnel is mainly manifested as the seismic-induced subsidence at the portal section and the cracking deformation at the joint areas.Finally,we propose that the“staggered peak distribution”phenomenon of the maximum acceleration values at the vault and inverted arch area can be considered as a criterion indicating that the tunnel enters into the threshold of dynamic failure.展开更多
The successful completion of the Zhengzhou-Xi'an high-speed railway project has greatly improved the construction level of China's large-section loess tunnels, and has resulted in significant progress being made in ...The successful completion of the Zhengzhou-Xi'an high-speed railway project has greatly improved the construction level of China's large-section loess tunnels, and has resulted in significant progress being made in both design theory and construction technology. This paper systematically summarizes the tech- nical characteristics and main problems of the large-section loess tunnels on China's high-speed railway, including classification of the surrounding rock, design of the supporting structure, surface settlement and cracking control, and safe and rapid construction methods. On this basis, the key construction tech- niques of loess tunnels with large sections for high-speed railway are expounded from the aspects of design and construction. The research results show that the classification of loess strata surrounding large tunnels should be based on the geological age of the loess, and be determined by combining the plastic index and the water content. In addition, the influence of the buried depth should be considered. During tunnel excavation disturbance, if the tensile stress exceeds the soil tensile or shear strength, the surface part of the sliding trend plane can be damaged, and visible cracks can form. The pressure of the surrounding rock of a large-section loess tunnel should be calculated according to the buried depth, using the corresponding formula. A three-bench seven-step excavation method of construction was used as the core technology system to ensure the safe and rapid construction of a large-section loess tunnel, following a field test to optimize the construction parameters and determine the engineering measures to stabilize the tunnel face. The conclusions and methods presented here are of great significance in revealing the strata and supporting mechanics of large-section loess tunnels, and in optimizing the supporting structure design and the technical parameters for construction.展开更多
This paper is devoted to the nonlinear stress and strain analysis oftunneling and working conditions of Wanjiazhai Division Project No.7 Tunnel in Shanxi province ofChina. The initial geological stress of loess was si...This paper is devoted to the nonlinear stress and strain analysis oftunneling and working conditions of Wanjiazhai Division Project No.7 Tunnel in Shanxi province ofChina. The initial geological stress of loess was simulated by grading fill; the theory of unloadingproposed by Duncan and boundary stress of elasticity were used to calculate the excavation of thetunnel; Goodman joint elements were applied to simulate the joints of the liners; both loading andunloading tests have been performed to determine the parameters of Duncan-Chang's model and thecalculated results were compared; Terzaghi' s theory on loosening earth pressure was applied. Manyworking conditions were analyzed and some reasonable results were obtained. Based on the analyses,reparative measures were proposed and completed. The tunnel has functioned well since October, 2001.展开更多
基金Received on April 27th,2020revised on August 18th,2020.This project is sponsored by National Natural Science Foundation of China(51968041,41562013)Foundation of A Hundred Youth Talents Training Program of Lanzhou Jiaotong University,Gansu Provincial Science and Technology Porgram(18YF1GA055).
文摘Considering the existence of numerous shallow-buried tunnels traversing high slopes in the loess area in western China and the fact of high seismic intensity there,we investigate the dynamic response rules of a shallow-buried loess tunnel and its slope under the action of seismic waves with different intensities.Through large-scale shaking table model tests,we successfully analyze the characteristics and process of the destabilization of tunnels and slopes,and propose valuable suggestions regarding the reinforcement parts of a tunnel for reducing seismic damage.The results show that the main seismic damage on a slope include the failure of the sliding surface between the top and foot and the stripping of the soil around the tunnel entrance,while the damage on a tunnel is mainly manifested as the seismic-induced subsidence at the portal section and the cracking deformation at the joint areas.Finally,we propose that the“staggered peak distribution”phenomenon of the maximum acceleration values at the vault and inverted arch area can be considered as a criterion indicating that the tunnel enters into the threshold of dynamic failure.
文摘The successful completion of the Zhengzhou-Xi'an high-speed railway project has greatly improved the construction level of China's large-section loess tunnels, and has resulted in significant progress being made in both design theory and construction technology. This paper systematically summarizes the tech- nical characteristics and main problems of the large-section loess tunnels on China's high-speed railway, including classification of the surrounding rock, design of the supporting structure, surface settlement and cracking control, and safe and rapid construction methods. On this basis, the key construction tech- niques of loess tunnels with large sections for high-speed railway are expounded from the aspects of design and construction. The research results show that the classification of loess strata surrounding large tunnels should be based on the geological age of the loess, and be determined by combining the plastic index and the water content. In addition, the influence of the buried depth should be considered. During tunnel excavation disturbance, if the tensile stress exceeds the soil tensile or shear strength, the surface part of the sliding trend plane can be damaged, and visible cracks can form. The pressure of the surrounding rock of a large-section loess tunnel should be calculated according to the buried depth, using the corresponding formula. A three-bench seven-step excavation method of construction was used as the core technology system to ensure the safe and rapid construction of a large-section loess tunnel, following a field test to optimize the construction parameters and determine the engineering measures to stabilize the tunnel face. The conclusions and methods presented here are of great significance in revealing the strata and supporting mechanics of large-section loess tunnels, and in optimizing the supporting structure design and the technical parameters for construction.
文摘This paper is devoted to the nonlinear stress and strain analysis oftunneling and working conditions of Wanjiazhai Division Project No.7 Tunnel in Shanxi province ofChina. The initial geological stress of loess was simulated by grading fill; the theory of unloadingproposed by Duncan and boundary stress of elasticity were used to calculate the excavation of thetunnel; Goodman joint elements were applied to simulate the joints of the liners; both loading andunloading tests have been performed to determine the parameters of Duncan-Chang's model and thecalculated results were compared; Terzaghi' s theory on loosening earth pressure was applied. Manyworking conditions were analyzed and some reasonable results were obtained. Based on the analyses,reparative measures were proposed and completed. The tunnel has functioned well since October, 2001.